Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CDB.V ·

Cordoba Minerals Continues to Intersect High- Grade Copper-Gold Mineralization Within the Core of the Alacran Deposit at its 100%-owned San Matias Copper-Gold-Silver Project in Colombia ACD133 Reports 150.60 Metres of 0.86% Copper Equivalent

Drill Results

Cordoba Minerals Continues to Intersect High-

Grade Copper-Gold Mineralization Within the

Core of the Alacran Deposit at its 100%-owned

San Matias Copper-Gold-Silver Project in

Colombia

ACD133 Reports 150.60 Metres of 0.86% Copper Equivalent

1

(0.72% Copper, 0.27 g/t Gold and

5.27 g/t Silver)

Vancouver, British Columbia--(Newsfile Corp. - December 5, 2022) -

Sarah Armstrong-Montoya,

President and Chief Executive Officer of Cordoba Minerals Corp. (TSXV: CDB) (OTCQB:

CDBMF) (otherwise "Cordoba" or the "Company"),

is pleased to report additional assay results

received from the ongoing initial in-fill drilling program at the 100%-owned San Matias Copper-Gold-

Silver Project.

Highlights:

Significant intercepts returned from the additional drill holes include (Table 1):

ACD133 - 150.60 metres ("m") from 40.45 m to 191.05 m with 0.72% copper ("Cu"), 0.27 g/t

gold ("Au") and 5.27 g/t silver ("Ag"), or 0.86% copper equivalent

1

("CuEq

"

), including:

44.38 m from 46.33 m to 90.71 m with 1.48% Cu, 0.62 g/t Au and 11.23 g/t Ag, or

1.81% CuEq

1

,

16.00 m from 114.00 m to 130.00 m with 0.87% Cu, 0.41 g/t Au and 4.56 g/t Ag, or

1.09% CuEq

1

.

Assay results continue to demonstrate high-grade copper-gold mineralization within the Alacran

Deposit and confirm the strong correlation with the Pre-Feasibility Study ("PFS") block model.

"As our initial drill program is nearing completion, I'm delighted that the assay results continue to confirm

the PFS block model, and highlight the quality of the project," commented Ms. Sarah Armstrong-

Montoya, President and CEO of Cordoba. "In addition, our teams are advancing the Feasibility Study

technical program, Environmental Impact Assessment permitting, and community engagement activities

to move the project forward to the next milestone."

Assay results confirm the correlation with the PFS block model.

To date, Cordoba has completed 25,929 m in 127 diamond drill holes of the initial in-fill drilling

campaign (Figure 1). Assay results continue to demonstrate high-grade copper-gold mineralization

within the core of the Alacran Deposit and confirm the strong correlation with the PFS block model.

Drill hole ACD133 shows a strong correlation with the PFS block model by intersecting 150.60 m of the

tuffs and carbonaceous mudstone beds of "Unit 2" of the Alacran Deposit from 40.45 m to 191.05 m

(Figure 2), with highly enriched grades of copper, gold and silver that correlate well with the local block

model (Figure 3). Much of this shallow high-grade material starts within 30 m to 40 m of the surface.

Drill hole ACD147 returned 36.28 m of 1.40% CuEq

1

between 79.72 m and 116.00 m of a tuff bed within

"Unit 2", which has been partially replaced by semi-massive sulfide comprising pyrite, chalcopyrite and

pyrrhotite (Figure 4).

These assay results will be included in the next mineral resource model update after the completion of

the current drilling program. The ongoing Feasibility Study will determine the potential for early access to

the shallow high-grade zones.

The initial drilling program is nearing completion and will be transitioning to focus on the peripheral in-fill

areas of the Alacran Deposit to estimate the life of mine average grade of the deposit.

Table 1: Drill results of the latest drill holes from the 2022 Alacran Deposit in-fill drill program.

Hole

From

(m)

To

(m)

Interval

2

(m)

Cu

(%)

Au

(g/t)

Ag

(g/t)

CuEq

1

(%)

ACD127

19.50

121.91

83.11

0.77

0.30

4.72

0.92

Including

59.75

100.73

39.58

1.16

0.40

7.29

1.37

ACD131

7.00

100.30

93.30

0.69

0.27

4.86

0.84

Including

7.00

23.90

16.90

0.78

0.41

6.53

1.00

Including

46.40

100.30

53.90

0.95

0.34

6.31

1.13

ACD132

9.10

173.33

156.83

0.41

0.38

3.00

0.63

Including

10.60

80.40

62.40

0.63

0.84

4.66

1.13

Including

161.55

173.33

11.78

0.71

0.17

4.38

0.79

ACD133

40.45

191.05

150.60

0.72

0.27

5.27

0.86

Including

46.33

90.71

44.38

1.48

0.62

11.23

1.81

Including

114.00

130.00

16.00

0.87

0.41

4.56

1.09

ACD134

3.40

50.40

47.00

0.29

0.11

4.53

0.37

Including

26.20

31.30

5.10

0.89

0.23

5.16

0.99

ACD135

17.00

146.95

108.65

0.48

0.18

3.00

0.57

Including

69.45

140.95

71.50

0.57

0.22

3.42

0.68

ACD136

28.97

160.00

131.03

0.58

0.13

2.19

0.63

Including

75.00

120.00

45.00

0.96

0.19

2.74

1.02

ACD137

129.70

150.20

20.50

0.49

0.36

2.16

0.68

ACD139

10.87

152.22

141.35

0.55

0.18

4.35

0.64

ACD140

52.15

139.14

86.99

0.35

0.12

2.37

0.41

Including

121.14

139.14

18.00

0.69

0.22

5.90

0.81

ACD141

53.55

147.00

93.45

0.25

0.11

0.68

0.30

Including

53.55

88.50

34.95

0.38

0.22

0.78

0.49

Including

141.00

153.00

12.00

0.52

0.06

2.35

0.53

ACD142

0.00

21.00

21.00

0.22

0.75

5.10

0.73

Including

0.00

7.90

7.90

0.00

1.72

5.44

1.15

Including

12.50

21.00

8.50

0.55

0.21

6.43

0.67

ACD143

60.80

194.65

133.85

0.29

0.08

0.95

0.32

ACD144

12.00

100.80

83.90

0.46

0.21

3.51

0.58

Including

12.00

20.20

7.50

1.34

1.58

5.26

2.23

Including

81.00

97.00

16.00

0.79

0.14

6.84

0.85

ACD145

32.25

89.35

57.10

0.37

0.12

2.49

0.43

ACD146

138.65

165.10

26.45

0.39

0.30

1.97

0.55

ACD147

79.72

157.30

77.58

0.82

0.35

4.60

1.00

Including

79.72

116.00

36.28

1.17

0.47

5.43

1.40

Including

132.00

157.30

25.30

0.69

0.32

5.34

0.87

ACD148

46.00

143.60

97.60

0.42

0.15

4.93

0.50

Including

46.00

99.00

53.00

0.57

0.21

6.64

0.69

Including

134.10

143.60

9.50

0.89

0.24

9.93

1.03

ACD149

26.45

157.00

130.55

0.35

0.12

1.09

0.40

Including

26.45

43.10

16.65

0.48

0.23

1.52

0.60

Including

58.47

79.25

20.78

0.63

0.28

1.57

0.76

Including

88.00

101.40

13.40

0.82

0.23

2.20

0.91

ACD150

30.60

99.16

68.56

0.31

0.17

2.02

0.40

ACD151

79.88

186.10

106.22

0.27

0.24

3.31

0.42

Including

97.10

109.10

12.00

0.60

0.22

2.33

0.70

Including

159.60

186.10

26.50

0.23

0.55

8.99

0.60

ACD153

56.16

72.35

16.19

0.49

0.22

3.41

0.61

ACD154

56.00

162.30

106.30

0.43

0.20

2.82

0.54

Including

56.00

74.96

18.96

0.32

0.15

3.39

0.41

Including

128.20

162.30

34.10

0.98

0.47

5.93

1.22

Figure 1: Plan view of the significant intercepts from the additional drill holes.

To view an enhanced version of Figure 1, please visit:

https://images.newsfilecorp.com/files/3116/146730_c1b672ce147b38ea_003full.jpg

Figure 2: Cross section A - A' of ACD 133

To view an enhanced version of Figure 2, please visit:

https://images.newsfilecorp.com/files/3116/146730_c1b672ce147b38ea_004full.jpg

Figure 3: Hole ACD133 at 48.75 m showing a "Unit 2"

carbonaceous mudstone preferentially

replaced with chalcopyrite, mushketovite and pyrite. This sample was part of a 1.05 m interval

from 48.75 m to 49.80 m, which returned 4.25% Cu, 2.36 g/t Au, 27.2 g/t Ag, or 5.30% CuEq

1

.

To view an enhanced version of Figure 3, please visit:

https://images.newsfilecorp.com/files/3116/146730_c1b672ce147b38ea_005full.jpg

Figure 4: Hole ACD147 at 105.5 m showing fine tuff replaced with semi-massive pyrite,

chalcopyrite and pyrrhotite. This sample was part of a 1 m interval from 105.50 m to 106.50 m,

which returned 1.93% Cu, 0.88 g/t Au, 11.45 g/t Ag, or 2.39% CuEq

1

.

To view an enhanced version of Figure 4, please visit:

https://images.newsfilecorp.com/files/3116/146730_c1b672ce147b38ea_006full.jpg

Technical Information & Qualified Person

The technical information in this release has been reviewed, verified and approved by Mark Gibson,

P.Geo., a Qualified Person for the purpose of National Instrument 43-101 -

Standards of Disclosure for

Mineral Project

("NI 43-101"). Mr. Gibson is the Chief Operating Officer of Cordoba and of Ivanhoe

Electric Inc., Cordoba's majority shareholder, and is not considered independent under NI 43-101. Mr.

Gibson verified the data disclosed which includes a review of the sampling, analytical and test data

underlying the information and opinions contained therein.

Quality Assurance/Quality Control

Cordoba uses ALS Minerals Laboratory in Medellin, Colombia, ALS Minerals Laboratory in Lima, Peru,

and SGS Colombia S.A.S in Medellin, Colombia. These labs operate in accordance with ISO/IEC

17025.

Cordoba employs a comprehensive industry standard Quality Assurance/Quality Control (QA/QC)

program. PQ and HQ diamond drill core is cut lengthwise into 3 fractions, 1/4 is sent to geochemistry,

half is sent to metallurgy, and 1/4 is left behind in a secure facility for future assay verification.

Some sample shipments are delivered to ALS Minerals Laboratory in Medellin, Colombia where the

samples are prepared. Analysis occurs at the ALS Minerals Laboratory in Lima, Peru.

Alternate sample shipments are delivered to SGS Colombia S.A.S in Medellin, Colombia where the

samples are prepared and analyzed.

Both analytical labs determine the gold by a 50 g fire assay with an AAS finish. An initial multi-element

suite comprising copper, molybdenum, silver, and additional elements are analyzed by four-acid

digestion with an ICP-MS finish. All samples with copper values over 10,000 ppm and gold greater than

10 ppm are subjected to an overlimit method for higher grades, which also uses a four-acid digest with

an ICP-ES finish, and fire test with gravimetric finish. Certified reference materials, blanks, and

duplicates are randomly inserted at the geologist's discretion and QA/QC geologist's approval into the

sample stream to control laboratory performance (15%).

About Cordoba

Cordoba Minerals Corp. is a mineral exploration company focused on the exploration, development and

acquisition of copper and gold projects. Cordoba is developing its 100%-owned San Matias Copper-

Gold-Silver Project, which includes the Alacran deposit and satellite deposits at Montiel East, Montiel

West and Costa Azul, located in the Department of Cordoba, Colombia. Cordoba also holds a 51%

interest in the Perseverance Copper Project in Arizona, USA, which it is exploring through a Joint

Venture and Earn-In Agreement. For further information, please visit

www.cordobaminerals.com

.

ON BEHALF OF THE COMPANY

Sarah Armstrong-Montoya, President and Chief Executive Officer

Information Contact

Ran Li +1-604-689-8765

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this

release.

Forward-Looking Statements

This news release includes "forward-looking statements" and "forward-looking information" within the

meaning of Canadian securities legislation. All statements included in this news release, other than

statements of historical fact, are forward-looking statements including, without limitation, but not

limited to, statements with respect to the preparation of an updated mineral resource statement;

geological interpretations; Feasibility Study; Environmental Impact Assessment permitting;

community engagement activities; results of the current exploration and interpretations thereof;

mineralization potential; and contemplated drilling and development programs. Forward looking-

statements include predictions, projections and forecasts and are often, but not always, identified by

the use of words such as "anticipate", "believe", "plan", "estimate", "expect", "potential", "target",

"budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might"

occur or be achieved and other similar expressions and includes the negatives thereof.

Forward-looking statements are based on a number of assumptions and estimates that, while

considered reasonable by management based on the business and markets in which Cordoba

operates, are inherently subject to significant operational, economic, and competitive uncertainties,

risks and contingencies. Such assumptions and estimates include, but are not limited to,

assumptions with respect to the status of community relations and the security situation on site and in

Colombia; general business and economic conditions; continuity of drilling programs; the availability

of additional exploration and mineral project; the supply and demand for, inventories of, and the level

and volatility of the prices of metals; relationships with strategic partners and significant shareholders;

the timing and receipt of governmental permits and approvals; the timing and receipt of community

and landowner approvals; changes in regulations; political factors; the accuracy of the Company's

interpretation of drill results; the geology, grade and continuity of the Company's mineral deposits; the

availability of equipment, skilled labour and services needed for the exploration and development of

mineral properties; currency fluctuations; and impact of the COVID-19 pandemic.

There can be no assurance that forward-looking statements will prove to be accurate and actual

results, and future events could differ materially from those anticipated in such statements. Important

factors that could cause actual results to differ materially from the Company's expectations include

actual exploration results, continuity of drilling programs, interpretation of metallurgical characteristics

of the mineralization, changes in project parameters as plans continue to be refined, future metal

prices, availability of capital and financing on acceptable terms, general economic, market or

business conditions, uninsured risks, regulatory changes, delays or inability to receive required

approvals, uncertainties relating to epidemics, pandemics and other public health crises, including

COVID-19 or similar such viruses, and other exploration or other risks detailed herein and from time

to time in the filings made by the Company with securities regulators, including those described under

the heading "Risks and Uncertainties" in the Company's most recently filed MD&A. The Company

does not undertake to update or revise any forward-looking statements, except in accordance with

applicable law. Readers are cautioned not to put undue reliance on these forward-looking statements.

1

Copper equivalent ("CuEq") is calculated using the formula CuEq=((Copper%*Copper recovery)+100*

((gold grade*gold price*gold recovery)/31.10305)/((copper%*copper price*copper

recovery)*2204.62)+100*((silver grade*silver price*silver recovery)/31.10305)/((copper%*copper

price*copper recovery)*2204.62) using the following assumptions: Metal prices of US$3.25/lb copper,

US$1,600.00/oz gold, and US$20.00/oz silver, copper recovery of 92.5% (fresh and transition zone

only), gold recovery of 78.1% and silver recovery of 62.9%.

2

Intervals are reported as core length only. True widths are estimated to be between 75% and 100% of

the core length.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/146730