Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CDB.V ·

Cordoba Minerals Completes Initial In-fill Drilling Program and Confirms High-Grade Copper-Gold Mineralization Within the Core of the Alacran Deposit at its 100%-owned San Matias Copper-Gold-Silver Project in Colombia ACD157 Reports 95.4 Metres* of 1.49% Copper Equivalent

Drill Results Exploration Programs

Cordoba Minerals Completes Initial In-fill

Drilling Program and Confirms High-Grade

Copper-Gold Mineralization Within the Core of

the Alacran Deposit at its 100%-owned San

Matias Copper-Gold-Silver Project in Colombia

ACD157 Reports 95.4 Metres* of 1.49% Copper Equivalent

1

(1.31% Copper, 0.38 g/t Gold and

7.59 g/t Silver)

Vancouver, British Columbia--(Newsfile Corp. - January 23, 2023) -

Sarah Armstrong-Montoya,

President and Chief Executive Officer of Cordoba Minerals Corp. (TSXV: CDB) (OTCQB:

CDBMF) (otherwise "Cordoba" or the "Company"),

is pleased to report remaining assay results

received from the initial in-fill drilling program at the 100%-owned San Matias Copper-Gold-Silver

Project.

Highlights:

Significant intercepts returned from the remaining initial in-fill drill holes include (Table 1):

ACD156 - 91.7 metres

*

("m") from 56.5 m to 148.2 m with 1.05% copper ("Cu"), 0.86 g/t gold

("Au") and 9.50 g/t silver ("Ag"), or 1.55% copper equivalent

1

("CuEq"), including:

46.90 m from 65.5 m to 112.4 m with 1.72% Cu, 0.55 g/t Au and 16.23 g/t Ag, or 2.02%

CuEq

1

.

ACD157 - 95.4 m

*

from 32.9 m to 128.3 m with 1.31% Cu, 0.38 g/t Au and 7.59 g/t Ag, or 1.49%

CuEq

1

, including:

28.1 m from 32.9 m to 61 m with 1.42% Cu, 0.23 g/t Au and 5.90 g/t Ag, or 1.49% CuEq

1

,

44 m from 84.3 m to 128.3 m with 1.79% Cu, 0.62 g/t Au and 11.96 g/t Ag, or 2.11% CuEq

1

.

Initial in-fill drill results confirm the strong correlation with the Pre-Feasibility Study ("PFS") block model

and will be included in an updated mineral resource model.

"With the completion of the initial in-fill drilling program, I'm delighted that the assay results consistently

demonstrated high-grade copper-gold mineralization within the core of the Alacran Project," commented

Ms. Sarah Armstrong-Montoya, President and CEO of Cordoba. "Together with the participation of

JCHX in the Project and the advancing of the Feasibility Study work program, we look forward to an

encouraging year for the development of the Alacran Deposit."

Initial in-fill drilling confirms the correlation with the PFS block model and Carbonate Base

Metal veins offer significant upside for contained gold in the Alacran Deposit.

Cordoba has completed 27,726 m in 142 diamond drill holes for the initial in-fill drilling campaign. Assay

results from the remaining drill holes continue to demonstrate high-grade copper-gold mineralization

within the core of the Alacran Deposit as predicted by the PFS block model (Figure 1).

Drill holes ACD156 and ACD157 tested the upper and base parts within 'Unit 2' of the Alacran Deposit,

which has highly enriched grades of copper, gold and silver mineralization (Figures 2 and 3). ACD156

intersected high-grade semi-massive and massive sulfide replacing carbonaceous mudstones, and

ACD157 intersected disseminated and semi-massive sulfide hosted by a tuff unit (Figure 4).

Additional shallow high-grade copper-gold intercepts that are similar to ACD 156 and ACD 157 were

also returned from the initial in-fill drill results previously announced on

October 25, 2022

, and

December

5, 2022

. These assay results will be included in the next mineral resource model update. It is anticipated

that the Feasibility Study will provide an analysis on the potential for early access to the shallow high-

grade zones.

The initial in-fill drilling program also intersected multiple Carbonate Base Metal ("CBM") veins, which

could offer significant upside for contained gold in the Alacran Deposit (refer to Cordoba's news

releases dated

August 8, 2022

, and

September 19, 2022

). These CBM veins have shown close

geological correlation with the vertical high-grade domains in the PFS block model and will be modelled

further for potential inclusion in the resource model.

With the completion of the initial in-fill drilling program, future in-fill drilling will now be focused on the

peripheral in-fill areas of the Alacran Deposit to estimate the life of mine average grade of the Deposit.

Table 1: Drill results of the remaining drill holes from the Alacran Deposit initial in-fill drilling

program.

Hole

From

(m)

To

(m)

Interval

2

(m)

Cu

(%)

Au

(g/t)

Ag

(g/t)

CuEq

1

(%)

ACD138

0.00

93.75

93.75*

0.15

0.18

1.96

0.26

ACD152

11.60

117.59

105.99*

0.23

0.15

3.93

0.33

Including

75.25

117.59

42.34

0.49

0.30

8.18

0.69

ACD155

42.30

161.45

119.15

0.42

0.17

1.79

0.50

Including

77.30

121.95

44.65

0.82

0.19

3.23

0.90

ACD156

56.50

148.20

91.70*

1.05

0.86

9.50

1.55

Including

65.50

112.40

46.90

1.72

0.55

16.23

2.02

ACD157

32.90

128.30

95.40*

1.31

0.38

7.59

1.49

Including

32.90

61.00

28.10

1.42

0.23

5.90

1.49

Including

84.30

128.30

44.00

1.79

0.62

11.96

2.11

ACD158

26.00

109.80

83.80

0.30

0.16

1.76

0.38

Including

65.50

82.00

16.50

0.76

0.53

5.47

1.06

ACD159

42.10

133.92

91.82

0.68

0.26

3.76

0.81

Including

81.20

112.00

30.80

1.32

0.56

7.06

1.60

1

Copper equivalent ("CuEq") is calculated using the formula CuEq=((Copper%*Copper recovery)+100*((gold grade*gold price*gold

recovery)/31.10305)/((copper%*copper price*copper recovery)*2204.62)+100*((silver grade*silver price*silver

recovery)/31.10305)/((copper%*copper price*copper recovery)*2204.62) using the following assumptions: Metal prices of US$3.25/lb copper,

US$1,600.00/oz gold, and US$20.00/oz silver, copper recovery of 92.5% (fresh and transition zone only), gold recovery of 78.1% and silver

recovery of 62.9%.

2

Intervals are reported as core length only. True widths are estimated to be between 75% and 100% of the core length.

* ACD138, ACD152, ACD156 and ACD157 were drilled sub-parallel to dip and these lengths do not represent true thickness.

Figure 1: Plan view of the significant intercepts from the remaining drill holes of the initial in-fill

drilling program.

To view an enhanced version of Figure 1, please visit:

https://images.newsfilecorp.com/files/3116/152115_c3993164f449c9df_004full.jpg

Figure 2: Cross section A - A' of ACD 156.

To view an enhanced version of Figure 2, please visit:

https://images.newsfilecorp.com/files/3116/152115_c3993164f449c9df_005full.jpg

Figure 3: Cross section B - B' of ACD 157.

To view an enhanced version of Figure 3, please visit:

https://images.newsfilecorp.com/files/3116/152115_c3993164f449c9df_006full.jpg

Figure 4: Hole ACD157 at 103.45 m showing a volcanic tuff within 'Unit 2', with a very fine dark

coloured matrix of ash and lapilli, some carbonate fragments, and semi-massive sulfides, such

as pyrite and chalcopyrite replacing the matrix. This sample was part of a 44 m interval from

84.30 m to 128.30 m, which returned 1.79% Cu, 0.62 g/t Au, 11.96 g/t Ag, or 2.11% CuEq

1

.

To view an enhanced version of Figure 4, please visit:

https://images.newsfilecorp.com/files/3116/152115_c3993164f449c9df_007full.jpg

Technical Information & Qualified Person

The technical information in this release has been reviewed, verified and approved by Mark Gibson,

P.Geo., a Qualified Person for the purpose of National Instrument 43-101 -

Standards of Disclosure for

Mineral Project

("NI 43-101"). Mr. Gibson is the Chief Operating Officer of Cordoba and of Ivanhoe

Electric Inc., Cordoba's majority shareholder, and is not considered independent under NI 43-101. Mr.

Gibson verified the data disclosed which includes a review of the sampling, analytical and test data

underlying the information and opinions contained therein.

Quality Assurance/Quality Control

Cordoba uses ALS Minerals Laboratory in Medellin, Colombia, ALS Minerals Laboratory in Lima, Peru,

and SGS Colombia S.A.S in Medellin, Colombia. These labs operate in accordance with ISO/IEC

17025.

Cordoba employs a comprehensive industry standard Quality Assurance/Quality Control (QA/QC)

program. PQ and HQ diamond drill core is cut lengthwise into 3 fractions, 1/4 is sent to geochemistry,

half is sent to metallurgy, and 1/4 is left behind in a secure facility for future assay verification.

Some sample shipments are delivered to ALS Minerals Laboratory in Medellin, Colombia where the

samples are prepared. Analysis occurs at the ALS Minerals Laboratory in Lima, Peru.

Alternate sample shipments are delivered to SGS Colombia S.A.S in Medellin, Colombia where the

samples are prepared and analyzed.

Both analytical labs determine the gold by a 50 g fire assay with an AAS finish. An initial multi- element

suite comprising copper, molybdenum, silver, and additional elements are analyzed by four-acid

digestion with an ICP-MS finish. All samples with copper values over 10,000 ppm and gold greater than

10 ppm are subjected to an overlimit method for higher grades, which also uses a four-acid digest with

an ICP-ES finish, and fire test with gravimetric finish. Certified reference materials, blanks, and

duplicates are randomly inserted at the geologist's discretion and QA/QC geologist's approval into the

sample stream to control laboratory performance (15%).

About Cordoba

Cordoba Minerals Corp. is a mineral exploration company focused on the exploration, development and

acquisition of copper and gold projects. Cordoba is developing its 100%-owned San Matias Copper-

Gold-Silver Project, which includes the Alacran deposit and satellite deposits at Montiel East, Montiel

West and Costa Azul, located in the Department of Cordoba, Colombia. Cordoba also holds a 51%

interest in the Perseverance Copper Project in Arizona, USA, which it is exploring through a Joint

Venture and Earn-In Agreement. For further information, please visit

www.cordobaminerals.com

.

ON BEHALF OF THE COMPANY

Sarah Armstrong-Montoya, President and Chief Executive Officer

Information Contact

Ran Li +1-604-689-8765

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this

release.

Forward-Looking Statements

This news release includes "forward-looking statements" and "forward-looking information" within the

meaning of Canadian securities legislation. All statements included in this news release, other than

statements of historical fact, are forward-looking statements including, without limitation, but not

limited to, statements with respect to the preparation of an updated mineral resource statement; JCHX

participation; geological interpretations; Feasibility Study; results of the current exploration and

interpretations thereof; mineralization potential; and contemplated drilling and development

programs. Forward looking-statements include predictions, projections and forecasts and are often,

but not always, identified by the use of words such as "anticipate", "believe", "plan", "estimate",

"expect", "potential", "target", "budget" and "intend" and statements that an event or result "may",

"will", "should", "could" or "might" occur or be achieved and other similar expressions and includes

the negatives thereof.

Forward-looking statements are based on a number of assumptions and estimates that, while

considered reasonable by management based on the business and markets in which Cordoba

operates, are inherently subject to significant operational, economic, and competitive uncertainties,

risks and contingencies. Such assumptions and estimates include, but are not limited to,

assumptions with respect to the status of community relations and the security situation on site and in

Colombia; general business and economic conditions; continuity of drilling programs; the availability

of additional exploration and mineral project; the supply and demand for, inventories of, and the level

and volatility of the prices of metals; relationships with strategic partners and significant shareholders;

the timing and receipt of governmental permits and approvals; the timing and receipt of community

and landowner approvals; changes in regulations; political factors; the accuracy of the Company's

interpretation of drill results; the geology, grade and continuity of the Company's mineral deposits; the

availability of equipment, skilled labour and services needed for the exploration and development of

mineral properties; currency fluctuations; and impact of the COVID-19 pandemic.

There can be no assurance that forward-looking statements will prove to be accurate and actual

results, and future events could differ materially from those anticipated in such statements. Important

factors that could cause actual results to differ materially from the Company's expectations include

actual exploration results, continuity of drilling programs, interpretation of metallurgical characteristics

of the mineralization, changes in project parameters as plans continue to be refined, future metal

prices, availability of capital and financing on acceptable terms, general economic, market or

business conditions, uninsured risks, regulatory changes, delays or inability to receive required

approvals, uncertainties relating to epidemics, pandemics and other public health crises, including

COVID-19 or similar such viruses, and other exploration or other risks detailed herein and from time

to time in the filings made by the Company with securities regulators, including those described under

the heading "Risks and Uncertainties" in the Company's most recently filed MD&A. The Company

does not undertake to update or revise any forward-looking statements, except in accordance with

applicable law. Readers are cautioned not to put undue reliance on these forward-looking statements.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/152115