Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CD.V ·

Cantex Provides Field Update for Yukon Project

Corporate Updates

Cantex Provides Field Update for Yukon

Project

KELOWNA, BC

,

July 23, 2020

/CNW/ -

Cantex Mine Development Corp.

(TSXV: CD) (the

"Company") has released an update on the work program at its 100-percent-owned 14,077 hectare

North Rackla claim block in the

Yukon

.

Dr.

Charles Fipke

reports

HIGHLIGHTS

Structural mapping provides clarity on Massive Sulphide Zone

Soil-talus sampling program progressing well

Prospecting underway

Drilling to start in mid August

Structural Mapping of Massive Sulphide Zone

Geological mapping by

Chris Buchanan

, M.Sc. P.Geo., has been underway on the North Rackla

Project since the beginning of July. The mapping is focused on the vicinity of the Main Zone silver-

lead-zinc discovery. The objective of this work is to develop an improved structural model of the

Main Zone that provides a better understanding of how faulting has moved the mineralization.

The Main Zone mineralization is hosted within a thick dolomite unit which is underlain by a succession

of siliciclastic rocks (siltstone, sandstone and argillite). This contact, along with distinct layers within

these broader units, allow the faulting and folding history of the area to be determined.

Three generations of folding (F

1

, F

2

, and F

3

in order from earliest to most recent) have been

identified. The F

2

folds are the dominant regional structural feature. They are kilometre scale,

asymmetric and verge to the southeast. In the area of the Main Zone a F

2

fold controls the

orientation of the dolomite which hosts the mineralization. The mineralization occurs in the northeast

striking, steeply dipping southeast limb of the fold.

There have also been multiple generations of faults in the Main Zone area. The earliest were thrust

faults which formed alongside the earlier F

1

and F

2

folds. Three younger generations of brittle faults

have cut across and displaced the mineralization for distances ranging from several metres to 200

metres. Now that the nature of these faults is understood drill targeting will be greatly improved.

The field mapping program is in its final stages. The new geological map of the Main Zone area will

be integrated with existing drill data to improve the current geological model prior to the 2020 drill

program. New drill targets have been identified during the mapping and additional drill targets are

expected to be developed as the drill datasets and surficial geology map are integrated into the 3-D

model.

Prospecting and Rock Sampling

As disclosed in the Company's news recent news release (

July 9, 2020

) Cantex has discovered 48

areas anomalous in gold and/or base metals within the North Rackla claim block. Prospecting and

rock sampling of these anomalies is well underway.

Soil-Talus Sampling

As many of the existing soil-talus geochemical anomalies are not completely closed off additional

soil-talus sampling is needed to establish the exact dimensions of the anomalous areas. Four

thousand six hundred additional samples have been proposed. The collection of these samples will

be complete before the end of July.

Summary

Cantex is pleased with the progress on the structural mapping of the Massive Sulphide zone and the

resulting understanding of how the mineralization has been displaced. This understanding will greatly

enhance the targeting of the upcoming drill program.

The technical information and results reported here have been reviewed by Mr.

Chad Ulansky

P.Geo

., a Qualified Person under National Instrument 43-101, who is responsible for the technical

content of this release.

Signed,

Charles Fipke

Charles Fipke

Chairman

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. Information set forth in this news release includes forward-looking statements under

applicable securities laws. Forward-looking statements are statements that relate to future, not

past, events. In this context, forward-looking statements often address expected future business

and financial performance, and often contain words such as "anticipate", "believe", "plan",

"estimate", "expect", and "intend", statements that an action or event "may", "might", "could",

"should", or "will" be taken or occur, or other similar expressions. All statements, other than

statements of historical fact, included herein are forward-looking statements. By their nature,

forward-looking statements involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements, or other future events, to be

materially different from any future results, performance or achievements expressed or implied by

such forward-looking statements. Such factors include, among others, risks identified in the

management discussion and analysis section of the Company's interim and most recent annual

financial statements or other reports and filings with Canadian securities regulators. Forward

looking statements are made based on management's beliefs, estimates and opinions on the date

that statements are made and the respective companies undertake no obligation to update forward-

looking statements if these beliefs, estimates and opinions or other circumstances should change,

except as required by applicable securities laws. Investors are cautioned against attributing undue

certainty to forward-looking statements.

SOURCE

Cantex Mine Development Corp.

View original content:

http://www.newswire.ca/en/releases/archive/July2020/23/c4161.html

%SEDAR: 00010333E

For further information:

Cantex Mine Development Corp, Tel: +1-250-860-8582, Email:

[email protected]

CO: Cantex Mine Development Corp.

CNW 08:30e 23-JUL-20