Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CD.V ·

Cantex Intersects Strong Massive Sulphide IN Its First Hole Drilled IN 2023 at North Rackla Project, Yukon

Drill Results

CANTEX INTERSECTS STRONG MASSIVE

SULPHIDE IN ITS FIRST HOLE DRILLED IN

2023 AT NORTH RACKLA PROJECT, YUKON

KELOWNA, BC

,

Oct. 25, 2023

/CNW/ - Cantex Mine Development Corp. (TSXV: CD) (OTCQB:

CTXDF) (the "Company") is pleased to report that Cantex is presently drilling on its North Rackla

claims.

Map 1. 2023 Drill program update (CNW Group/Cantex Mine Development Corp.)

The first hole (YKDD23-279) drilled at a -45° inclination into the Main Zone of the silver-lead-zinc-

germanium mineralization encountered a 7.8 metre intersection of strong massive sulphide from a

depth of 82.5 metres (refer to drill hole location Map 1).

Cantex is pleased to report such an outstanding intersection on its first hole. Drilling continues.

About Cantex Mine Development Corp.

Cantex is focused on its 100-per-cent-owned, 20,000-hectare North Rackla Project located 150

kilometres northeast of the town of

Mayo

in

Yukon, Canada

, where significant massive sulphide

mineralization has been discovered. Over 60,000 metres of drilling has defined high-grade silver-

lead-zinc-germanium mineralization over 2.3 kilometres of strike length and 700 metres depth. The

mineralization remains open along strike and to depth. The company is led by Dr. Fipke, the founder

of Ekati,

Canada's

first diamond mine.

The technical information and results reported here have been reviewed by Mr.

Chad Ulansky

P.Geol

., a Qualified Person under National Instrument 43-101, who is responsible for the technical

content of this release.

Signed,

Charles Fipke

Dr.

Charles Fipke

, CM

Chairman

FORWARD LOOKING STATEMENTS:

Certain of the statements and information in this press

release constitute "forward-looking statements" or "forward-looking information". Further, any

statements or information that express or involve discussions with respect to predictions,

expectations, beliefs, plans, projections, objectives, assumptions or future events or performance

(often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans",

"estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or

stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken,

occur or be achieved, or the negative of any of these terms and similar expressions) are not

statements of historical fact and may be forwardlooking statements or information. The Company's

forward-looking statements and information are based on the assumptions, beliefs, expectations

and opinions of management as of the date of this press release, and other than as required by

applicable securities laws, the Company does not assume any obligation to update forward-looking

statements and information if circumstances or management's assumptions, beliefs, expectations

or opinions should change, or changes in any other events affecting such statements or

information. For the reasons set forth above, investors should not place undue reliance on forward-

looking statements and information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SOURCE

Cantex Mine Development Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2023/25/c6863.html

%SEDAR: 00010333E

For further information:

Cantex Mine Development Corp, Tel: +250-860-8582, Email:

[email protected]

CO: Cantex Mine Development Corp.

CNW 09:00e 25-OCT-23