Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CD.V ·

Cantex Announces Field Work Underway at Massive Sulphide Project in Yukon

Exploration Programs

Cantex Announces Field Work Underway at

Massive Sulphide Project in Yukon

KELOWNA, BC

,

July 7, 2020

/CNW/ -

Cantex Mine Development Corp.

(CD: TSXV) (the

"Company") has released an update on the work program at its 100-per-cent-owned 14,077 hectare

North Rackla claim block in the

Yukon

.

Dr.

Chuck Fipke

reports

HIGHLIGHTS

Structural mapping of mineralized core from Massive Sulphide project complete

Surface structural mapping of Massive Sulphide project underway

Prospecting, rock sampling and geologic mapping commenced

Drilling to commence in August

Progress on Structural Mapping of Massive Sulphide Project

Structural geologist

Chris Buchanan M.Sc.

, P.Geo. is on-site conducting a study of the area

surrounding Cantex's high-grade silver-lead-zinc Massive Sulphide discovery within the North Rackla

claim block. Buchanan has completed an examination of mineralized core stored off-site and spent a

month on-site in the

Yukon

reviewing core from the 2019 drill program. Preliminary results indicate

late, cross-cutting faults offset the massive sulphide lenses along strike. Surface mapping has

commenced to help interpret the effect of the faults on the mineralization. The surficial structural

data will be integrated with drill hole data to develop a new structural geological map and geological

model of the project area. These new concepts will be used to identify and prioritize drill targets for

the upcoming drill program.

Expansion Work on Massive Sulphide Project

Geochemical results from the Company's soil-talus sampling have indicated that there is a second

zone of mineralization parallel to, but offset from, the main zone Massive Sulphide. Prospecting,

rock sampling and geologic mapping are now underway to better define this second zone.

Drill Program

The structural mapping and work on the parallel zone are expected to be completed in early August,

prior to the commencement of a major drill program in mid-August.

The work will be used to extend the known mineralization along strike and to depth, particularly in

areas covered by thick overburden. Additionally, the new geological model for massive sulphide

mineralization will be used to evaluate new target areas identified from the soil-talus sampling.

Cantex is looking forward to another productive exploration season in the

Yukon

.

The technical information and results reported here have been reviewed by Mr.

Chad Ulansky

P.Geol

., a Qualified Person under National Instrument 43-101, who is responsible for the technical

content of this release.

Signed,

Charles Fipke

Charles Fipke

Chairman

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. Information set forth in this news release includes forward-looking statements under

applicable securities laws. Forward-looking statements are statements that relate to future, not

past, events. In this context, forward-looking statements often address expected future business

and financial performance, and often contain words such as "anticipate", "believe", "plan",

"estimate", "expect", and "intend", statements that an action or event "may", "might", "could",

"should", or "will" be taken or occur, or other similar expressions. All statements, other than

statements of historical fact, included herein are forward-looking statements. By their nature,

forward-looking statements involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements, or other future events, to be

materially different from any future results, performance or achievements expressed or implied by

such forward-looking statements. Such factors include, among others, risks identified in the

management discussion and analysis section of the Company's interim and most recent annual

financial statement or other reports and filings with Canadian securities regulators. Forward

looking statements are made based on management's beliefs, estimates and opinions on the date

that statements are made and the respective companies undertake no obligation to update forward-

looking statements if these beliefs, estimates and opinions or other circumstances should change,

except as required by applicable securities laws. Investors are cautioned against attributing undue

certainty to forward-looking statements.

SOURCE

Cantex Mine Development Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/July2020/07/c5982.html

%SEDAR: 00010333E

For further information:

Cantex Mine Development Corp, Tel: +1-250-860-8582; Email:

[email protected]

CO: Cantex Mine Development Corp.

CNW 09:00e 07-JUL-20