Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CD.V ·

Cantex Announces Drill Confirmed Strike Extended to 2.6 Kilometres at Its Silver-Lead-Zinc-Germanium Deposit ON Its 100% Owned North Rackla Claims IN the Yukon

Corporate Updates

CANTEX ANNOUNCES DRILL CONFIRMED

STRIKE EXTENDED TO 2.6 KILOMETRES AT

ITS SILVER-LEAD-ZINC-GERMANIUM

DEPOSIT ON ITS 100% OWNED NORTH

RACKLA CLAIMS IN THE YUKON

KELOWNA, BC

,

Sept. 9, 2024

/CNW/ -

Cantex Mine Development Corp.

(TSXV: CD) (OTCQB:

CTXDF) (the "Company") is pleased to announce a substantial extension of the drill confirmed strike

length of the Massive Sulphide Zone.

Main Zone Drilling

Cantex is pleased to report that drilling has extended the Main Zone mineralization strike length by

250 metres to 2.6 kilometres. This is a substantial increase.

Since restarting work in late August Cantex has completed eight drill holes at the Discovery Sector

of the Main Zone. Every hole has intersected the expected silver-lead-zinc +/-

germanium mineralization. Consistent with previous drilling in this Sector the geologists logging the

core report seeing up to 3% chalcopyrite (a copper sulphide) in the mineralized zones suggesting

that this portion of the Main Zone may in fact be near the central feeder of the mineralization. If this

is the case the mineralization has the potential to have significant additional strike extent to the

northeast.

The location of the pads from which the 2024 drilling has been undertaken is shown in Figure 1.

Cross sections showing the mineralization intersected from drill pads MZ53B and MZ60 are

presented in Figures 2 and 3 respectively.

Drilling continues at the Discovery Sector of the Main Zone with two drills.

Summary

Cantex is pleased to have made a significant extension to the Main Zone mineralization. The Zone

has now been drill confirmed over a strike length of 2.6 kilometres and to a depth of over 700

metres. The mineralization remains open along strike and to depth.

About Cantex

Cantex is focused on its 100% owned 20,000 hectare North Rackla Project located 150 kilometers

northeast of the town of

Mayo

in the

Yukon Territory, Canada

where high-grade massive sulphide

mineralization has been discovered. Over 60,000 meters of drilling has defined high grade silver-

lead-zinc-germanium mineralization over 2.6 kilometres of strike length and 700 metres depth.

The mineralization remains open along strike and to depth. The Company is led by Dr

Charles

Fipke

, C.M., the founder of Ekati,

Canada's

first diamond mine.

The technical information and results reported here have been reviewed by Mr.

Chad Ulansky

P.Geol

., a Qualified Person under National Instrument 43-101, who is responsible for the technical

content of this release.

Signed,

Charles Fipke

Charles Fipke

Chairman

FORWARD LOOKING STATEMENTS: Certain of the statements and information in this press

release constitute "forward-looking statements" or "forward-looking information", including

statements regarding the expected use of proceeds of the private placement. Further, any

statements or information that express or involve discussions with respect to predictions,

expectations, beliefs, plans, projections, objectives, assumptions or future events or performance

(often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans",

"estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or

stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken,

occur or be achieved, or the negative of any of these terms and similar expressions) are not

statements of historical fact and may be forward-looking statements or information. The

Company's forward-looking statements and information are based on the assumptions, beliefs,

expectations and opinions of management as of the date of this press release, and other than as

required by applicable securities laws, the Company does not assume any obligation to update

forward-looking statements and information if circumstances or management's assumptions,

beliefs, expectations or opinions should change, or changes in any other events affecting such

statements or information. For the reasons set forth above, investors should not place undue

reliance on forward-looking statements and information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Figure 1. 2024 Strike length extension (CNW Group/Cantex Mine Development Corp.)

Figure 2. Cross section through pad MZ53B (CNW Group/Cantex Mine Development Corp.)

Figure 3.

Cross section through pad MZ60 (CNW Group/Cantex Mine Development Corp.)

SOURCE

Cantex Mine Development Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2024/09/c2914.html

%SEDAR: 00010333E

For further information:

For further information: Cantex Mine Development Corp, Tel: +250-860-

8582; Email: [email protected]

CO: Cantex Mine Development Corp.

CNW 09:00e 09-SEP-24