Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CCMI.V ·

Canadian Critical Minerals Generates USD$246,000 in Revenue from Bull River Mine

Production Results

Canadian Critical Minerals Generates

USD$246,000 in Revenue from Bull River Mine

Calgary, Alberta--(Newsfile Corp. - July 10, 2024) - Canadian Critical Minerals Inc.

(TSXV: CCMI)

(OTCQB: RIINF) (

"

CCMI

" or the "

Company

") is pleased to report record revenues for the Company

from the sale of stockpiled copper, gold and silver mineralized material at the Bull River Mine ("

BRM

")

project near Cranbrook, BC.

During the month of June 2024, the Company trucked 694 wet metric

tonnes ("

wmt

") of mineralized material to New Afton and the Company received a provisional payment

of approximately USD$246,000 for the June 2024 shipments versus approximately USD$103,000 for

May 2024 shipments.

The mineralized material sent to New Afton graded 4.67% Cu, 0.89 g/t Au and

39.5 g/t Ag.

The Company is using a Steinert KSS 100 X-Ray Transmissive Ore Sorter ("

Ore Sorter

") to pre-

concentrate coarse mineralized material from a large surface stockpile at the BRM prior to transporting

to New Afton for processing under an Ore Purchase Agreement ("

OPA

") (see press release dated

October 5, 2023, on Sedar+).

During June 2024, the Company transitioned to a Monday to Sunday

dayshift only operation to better utilize the ore sorter and increase daily throughput.

Rejects from the

sorter are being stockpiled next to the fines stockpile.

The fines stockpile, which represents

approximately 25% of the total material on surface, was created during the original crushing and

screening process and represents material that is less than 5/8 inches in size and too fine to be

separated by the XRT process.

Rejects are grading between 0.4% Cu and 1.0% Cu.

The cut off grade

("

COG

") for milling copper mineralized material at the BRM that is already on surface is 0.4% Cu.

This

means that virtually all the fines and reject material can be economically processed at the Bull River Mine

once the Company has received permission to restart the mill.

2024 Revenues from Sale of Stockpiled Material Bull River Mine in $USD (Monthly)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2187/216074_a7b9069394b7da32_001full.jpg

Ian Berzins, President and CEO commented, "We are encouraged by the June 2024 results which

represent the highest-grade product produced to-date at the BRM through pre-concentration of

stockpiled material. The run of mine mineralized material from the surface stockpile grades 1.39%

copper, 0.29 g/t gold and 11 g/t silver, so we generated grade improvements of over 305% for all metals

using the ore sorter during the month.

The stockpile is not totally homogeneous in terms of grade, so we

expect to see some fluctuation in results in coming months."

Qualified person

CCMI's disclosure of a technical or scientific nature in this news release has been reviewed and

approved by Gary Low P.Geo., who serves as a Consultant to the Company and is a Qualified Person

under the definition of National Instrument 43-101.

About Canadian Critical Minerals Inc.

CCMI is a mining company primarily focused on two near-term copper production assets in Canada.

CCMI's main asset is the 100% owned Bull River Mine project (>135 million lbs of copper) near

Cranbrook, British Columbia which has a Mineral Resource containing copper, gold and silver. CCMI

also owns a 30% interest in the Thierry Mine project (>1.3 billion lbs of copper) near Pickle Lake, Ontario

which has a Mineral Resource containing copper, nickel, silver, palladium, platinum and gold.

Contact Information

Canadian Critical Minerals Inc.

Ian Berzins

President & Chief Executive Officer

M: +1-403-512-8202

E:

[email protected]

Website:

www.canadiancriticalmineralsinc.com

Caution Regarding Forward-Looking Information

This news release includes certain information that may constitute "forward-looking information" under

applicable Canadian securities legislation. Forward-looking information includes, but is not limited to,

statements about strategic plans, future work programs and objectives and expected results from such

work programs. Forward-looking information necessarily involve known and unknown risks, including,

without limitation, risks associated with general economic conditions; inability to access sufficient

capital from internal and external sources, and/or inability to access sufficient capital on favourable

terms; and other risks.

Forward-looking information is necessarily based upon a number of estimates and assumptions that,

while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors

which may cause the actual results and future events to differ materially from those expressed or

implied by such forward-looking information and the risks identified in the Company's continuous

disclosure record. There can be no assurance that such information will prove to be accurate, as

actual results and future events could differ materially from those anticipated in such information.

Accordingly, readers should not place undue reliance on forward-looking information. All forward-

looking information contained in this news release is given as of the date hereof and is based upon

the opinions and estimates of management and information available to management as at the date

hereof. The Company disclaims any intention or obligation to update or revise any forward-looking

information, whether as a result of new information, future events or otherwise, except as required by

law.

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this new

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/216074