Canadian Critical Minerals Focuses on Bull River Mine Project
Canadian Critical Minerals Focuses on Bull
River Mine Project
Calgary, Alberta--(Newsfile Corp. - November 27, 2023) - Canadian Critical Minerals Inc.
(TSXV: CCMI)
(OTCQB: RIINF)
("
CCMI
" or the "
Company
") is focused on its flagship Bull River Mine ("BRM") project
near Cranbrook, BC.
The BRM is the highest-grade advanced
underground copper
mine in British
Columbia. The mine is fully developed with over 22 kilometres of underground ramps, tunnels and raises
accessing approximately 75% of the current Mineral Resource. The mine has been maintained in a
dewatered condition since 2010.
The project has significant infrastructure in place including roads, grid
power, rail and proximity to established mining communities including Cranbrook, Fernie and Kimberley.
The following table summarizes the current Indicated and Inferred Resource estimate for the project at
the base case Copper Equivalent (CuEq) grade of 0.9% CuEq.
(See press release on Sedar+ dated
February 23, 2021). The average thickness of both the Indicated and Inferred Resource is 5.5 metres.
Summary of the Bull River Deposit Mineral Resource Estimate at a Base Case Cut-off of 0.9%
CuEq - Effective Date December 1, 2021
Classification
Cut-off CuEq
(%)
In-situ
In-situ Grades
Metal
Tonnage
CuEq
Cu
Au
Ag
NSR
Cu
Au
Ag
(Ktonnes)
(%)
(%)
(gpt)
(gpt)
($CDN)
(000 lbs)
(koz)
(koz)
Indicated
0.9
2,261
2.132
1.796
0.422
15.3
155.29
89,545
30.6
1,113
Inferred
0.9
1,356
1.918
1.598
0.417
13.6
139.70
47,799
18.2
594
Mineral Resource Notes:
1
.
The qualified person responsible for the mineral resource estimate is Sue Bird P. Eng of MMTS.
2
.
The base case cut-off is an NSR value of CDN$65/tonne, based on Processing costs of CDN$30/tonne and Underground Mining costs of
CDN$35/tonne.
3
.
A minimum mining width of 2.0m is assumed.
4
.
Mineral resources are based on a US$1,600/oz gold price, US$3.50/lb copper price and US$20/oz silver price and the following smelter
terms: 96.25% payable Cu, 97.5% payable Au and 90% payable Ag.
5
.
Forex of 0.79 US$:CDN$.
6
.
Treatment charges of US$5/tonne for Cu, Refining charges of US$0.005/lb Cu, US$8/oz for AuUS$0.5/oz Ag.
7
.
Transportation charges of US$100/tonne Cu concentrate.
8
.
Metallurgical recoveries have been estimated as 93% for Cu, 75% for Au, and 90% for Ag.
9
.
The mineral resource has been confined by a "reasonable prospects of eventual economic extraction" underground shape equating to an
NSR cut-off of CDN$65/tonne with all material within this shape reported as the resource.
10
.
The bulk density has been assigned values of 2.7 and 3.06 tonnes/m3 depending on mineralized domain.
11
.
Rounding as required by reporting guidelines may result in summation differences.
Mineralized zones at BRM are comprised of vertical to subvertical sulphide-bearing quartz carbonate
veins.
Mineralization consists primarily of pyrite, pyrrhotite and chalcopyrite with minor local galena,
sphalerite, arsenopyrite and cobaltite.
The BRM deposit has been described as a Churchill-type vein
copper-silver deposit.
These deposits are typically low tonnage (less than 1.0 million tonnes) and high
grade (1% Cu to 4% Cu) and can extend hundreds of metres along strike and down dip.
Our current
Resource at BRM is now larger than a typical Churchill type deposit, grades are improving at depth and
the mine is still relatively shallow.
To-date, the BRM has been developed to a depth of 350 metres from surface and mineralized structures
have been identified up to 175 metres below the lowest workings of the mine.
In the first half of 2021, six
diamond drill holes were drilled from underground workings on 9 Level and collared in 9E4XC Ext Re-
muck. All holes intersected mineralized structures between 425 metres and 525 metres below the
surface portal and between 75 metres and 175 metres below the lowest workings of the mine on 9 level.
The intersections do not represent true width of the vein structures.
(See press release on Sedar+ dated
September 30, 2021).
The purpose of the 2021 drilling program was to test the down dip extension of the vein systems under
the current workings to demonstrate the potential that the current Resource can be extended on strike
and to depth.
Diamond drill hole BRU 21-05 was particularly encouraging, intersecting the highest gold
values in the history of the property.
All drill hole intersections met or exceeded the minimum width for
mining.
Highlights of the 2021 Bull River Mine Drilling Program
Hole ID
From
To
Length
Cu
Ag
Au
CuEq
(m)
(m)
(m)
(%)
(g/t)
(g/t)
(%)
BRU 21-01
171.4
174.8
3.4
5.12
28.60
0.63
5.87
BRU 21-03
190.9
194.4
3.5
2.39
12.50
0.29
2.73
BRU 21-05
104.8
109.7
4.9
1.71
11.80
17.60
15.40
including
107.2
109.7
2.5
2.60
18.90
33.52
28.64
BRU 21-06
103.7
109.6
5.9
2.10
9.50
0.30
2.42
*Copper Equivalent (CuEq) for drill intersections is calculated based on US$ 3.80/lb Cu, US$ 2,000/oz Au and US$ 24/oz Ag with 100% metallurgical
recoveries for all metals. Assays have not been capped. The formula used for the calculation is: CuEq = Cu % + ((Au grade) X (Au price / 31)) / (Cu
price X 22) + ((Ag grade) X (Ag price/31)) / (Cu price X 22).
Once the Company begins receiving proceeds from the sale of a portion of the surface stockpile at the
BRM, it will be better positioned to initiate a new drilling program targeting deeper mineralized structures
at BRM.
Ian Berzins, President and CEO commented, "With the successful competition of our 2023 summer
drilling program at the Thierry Mine project, all of our leases and claims in Ontario are now in good
standing and we can concentrate on advancing our Bull River Mine project.
Priorities for BRM include
implementation of the Ore Purchase Agreement with New Afton, completion of our final permit
application to restart the Bull River Mine and deep drilling to further expand the known Resource."
Qualified person
CCMI's disclosure of a technical or scientific nature in this news release has been reviewed and
approved by Gary Low P.Geo., who serves as a Consultant to the Company and is a Qualified Person
under the definition of National Instrument 43-101.
About Canadian Critical Minerals Inc.
CCMI is a mining company primarily focused on two near-term copper production assets in Canada.
CCMI's main asset is the 100% owned Bull River Mine project (>135 million lbs of copper) near
Cranbrook, British Columbia which has a Mineral Resource containing copper, gold and silver. CCMI
also owns a 39% interest in the Thierry Mine project (>1.3 billion lbs of copper) near Pickle Lake, Ontario
which has a Mineral Resource containing copper, nickel, silver, palladium, platinum and gold.
Contact Information
Canadian Critical Minerals Inc.
Ian Berzins
President & Chief Executive Officer
M: +1-403-512-8202
E:
Website:
www.canadiancriticalmineralsinc.com
Caution Regarding Forward-Looking Information
This news release includes certain information that may constitute "forward-looking information" under
applicable Canadian securities legislation. Forward-looking information includes, but is not limited to,
statements about strategic plans, future work programs and objectives and expected results from such
work programs. Forward-looking information necessarily involve known and unknown risks, including,
without limitation, risks associated with general economic conditions; inability to access sufficient
capital from internal and external sources, and/or inability to access sufficient capital on favourable
terms; and other risks.
Forward-looking information is necessarily based upon a number of estimates and assumptions that,
while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors
which may cause the actual results and future events to differ materially from those expressed or
implied by such forward-looking information and the risks identified in the Company's continuous
disclosure record. There can be no assurance that such information will prove to be accurate, as
actual results and future events could differ materially from those anticipated in such information.
Accordingly, readers should not place undue reliance on forward-looking information. All forward-
looking information contained in this news release is given as of the date hereof and is based upon
the opinions and estimates of management and information available to management as at the date
hereof. The Company disclaims any intention or obligation to update or revise any forward-looking
information, whether as a result of new information, future events or otherwise, except as required by
law.
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this new
release.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/188798