Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CCMI.V ·

Braveheart Provides an Update on Bull River Mine Project

Corporate Updates

Braveheart Provides an Update on Bull River Mine Project

Calgary, Alberta--(Newsfile Corp. - October 17, 2019) - Braveheart Resources Inc. (TSXV: BHT) ("Braveheart" or, the

"Company") hereby provides an update on activities at the Bull River Mine property.

On August 16, 2019 Braveheart received an

amendment to its Mines Act Permit M-33 from British Columbia Energy, Mines and Petroleum Resources ("EMPR").

The

amendment provides approval for exploration drilling and groundwater drilling at the permitted mine area of approximately 116

hectares.

Since receipt of the permit amendment Braveheart has completed a condemnation drilling program at the property

and expects to complete a groundwater drilling program by the end of October 2019.

The condemnation drilling program verified that there is no near surface economic mineralization in terms of copper, gold and

silver metals that would be sterilized by the placement of tailings in an area on surface that has been identified as the primary

location for a dry stack or filtered tailings storage facility ("TSF").

The proposed TSF area is in proximity to the existing mill and

surface infrastructure.

Based on these results the Company can proceed with detailed engineering of the TSF.

This is one of the

critical components in support of the continuing application to restart the operation through the Major Mines Office of EMPR.

Dry

stack or filtered tailings technology has been identified as one of the best available technologies for tailings deposition on

surface.

The groundwater drilling program will include the installation of water wells and monitoring of the wells.

This information will

supplement the surface water monitoring programs already in place at the mine property.

Implementation of the expanded

groundwater monitoring program is also a critical component of the Major Mines Permit application.

The Bull River Mine

property is currently on care and maintenance with the existing underground workings being maintained in a dewatered

condition.

The Company also announces results from the initial surface drilling program at the Company's 100% owned Empire Strathcona

property which is located approximately 12 kilometres from the Bull River Mine property and is part of the Company's large

contiguous land package.

The Company completed a total of 14 drill holes this summer. All drill holes intersected narrow

mineralized structures, but grades of the mineralized material to-date do not support further exploration at this location at this

time.

The Company intends to focus future exploration activities on targets in closer proximity to the existing mineral resource at

the Bull River Mine property including targets that are best approached from the existing underground workings.

Based on

drilling activities completed this summer at the Bull River Mine property Mineral Titles On-Line expiry dates have been extended

until May 2022 for the entire property.

The Company continues to work with the British Columbia Hydro and Power Authority ("BC Hydro") on completion of a System

Impact Study Agreement for the Bull River Mine property.

The study is required to assess the impact of connecting the

customer's plant to BC Hydro's transmission system.

The Company is currently connected to grid power but plans to increase

the load to 10 MVA prior to a restart of operations.

The Company is pleased to announce that it has secured a used transformer

that will meet the immediate needs of the project and provide for expansion capability.

It is expected that the transformer will be

moved to the mine property later this fall.

About Braveheart Resources Inc.

Braveheart is a Canadian based junior mining company focused on building shareholder value through exploration and

development in the favourable and proven mining jurisdictions of the East and West Kootenays of British Columbia.

Braveheart's

main asset is the newly acquired Bull River Mine, an advanced stage copper, gold and silver property.

The property is fully

developed with 21,000 metres of underground developments in terms of ramps, raises and drifting on mineralized structures on

seven levels.

The surface infrastructure includes a 750 tonne per day conventional mill with adjoining crushing facilities as well as

offices and mine maintenance facilities.

The property is connected to grid power and there is year-round access to the site by

paved and all-weather roads.

Qualified Person

Braveheart's disclosure of a technical or scientific nature in this news release has been reviewed and approved by Ian Berzins,

P.Eng., ICD.D who serves as President, CEO and Director of the Company and is a qualified person under the definition of NI

43-101.

Contact Information

Braveheart Resources Inc.

Ian Berzins

President & Chief Executive Officer

403-512-8202

[email protected]

Website:

www.braveheartresourcesinc.com

Caution Regarding Forward-Looking Information

This news release includes certain information that may constitute "forward-looking information" under applicable Canadian

securities legislation. Forward-looking information includes, but is not limited to, statements about strategic plans, future work

programs and objectives and expected results from such work programs. Forward-looking information necessarily involve

known and unknown risks, including, without limitation, risks associated with general economic conditions; inability to access

sufficient capital from internal and external sources, and/or inability to access sufficient capital on favourable terms; and other

risks.

Forward-looking information is necessarily based upon a number of estimates and assumptions that, while considered

reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and

future events to differ materially from those expressed or implied by such forward-looking information and the risks identified

in the Company's continuous disclosure record. There can be no assurance that such information will prove to be accurate,

as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers

should not place undue reliance on forward-looking information. All forward-looking information contained in this news

release is given as of the date hereof and is based upon the opinions and estimates of management and information

available to management as at the date hereof. The Company disclaims any intention or obligation to update or revise any

forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy of this news release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/48875