Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CCMC.V ·

Xander Resources Completes Second Phase of Drilling Program for Timmins Nickel Project

Exploration Programs

Xander Resources Completes Second Phase of Drilling Program for Timmins

Nickel Project

Vancouver, British Columbia / March 20, 2023 – Xander Resources Inc. (“Xander” or the

“Company”) (TSXV: XND) (OTCQB: XNDRF) (FSX: 1XI) is pleased to announce that it has completed

the second phase of its fully financed drill program at its Timmins Nickel Project (the “Property”) located

in Timmins, Ontario.

The drill program comprised 1,559 metres across six (6) drill h oles and continued Xander’s strategy of

targeting geophysical anomalies on its claims that are on trend and/or adjacent to properties where Canada

Nickel Company (CNC) has identified significant nickel mineralization.

 Three (3) holes, NKV23-1, NKV23-2, and NKV23-3, targeted the northern part of the Company’s

“North Block” on claims along trend with CNC’s Mahaffy and Nesbitt properties. Both properties

have been drilled by CNC, with the first two drill holes at Nesbitt returning significant intersections

of mineralization with intervals of visible disseminated sulphides consistent with the Higher Grade

Zone at CNC’s Crawford Project where a preliminary economic ass essment indicates a 25-year

mine with an after-tax NPV (net present value) with 8-per-cent discount rate of $1.2-billion

(http://bit.ly/3YMsYFi, http://bit.ly/3E3b3CB).

 Three (3) holes, NKV23-4, NKV23-5, and NKV23-6, were drilled in the Company’s “South Block”

of claims that are adjacent to CNC’s MacDiarmid Project where CNC announced its second major

discovery in the Timmins Camp with a target that is approximate ly 15% larger than Canada

Nickel’s original Crawford’s Main Zone discovery (https://bit.ly/3RVjMfI).

 Ultramafics comprising komatiitic flows, gabbro and/or peridoti te were intersected in five (5) of

the six (6) drill holes. Notable intercepts include:

Drill Hole Rock Type Interval Le ngth (metres Interval Range (me tres)

NKV23-02 Komatiite 42.1 189.1 – 231.5

Komatiite 18.8 240.0 – 258.8

NKV23-03 Komatiite 87.0 186.0 – 273.0

NKV23-04 Komatiite 54.5 54.0 – 108.5

Komatiite 38.4 111.5 – 149.9

Peridotite/Gabbro 76.8 178.2 – 255.0

NKV23-05 Peridotite/Gabbro 201.6 50.4 – 252.0

NKV23-06 Komatiite 22.0 214.7 – 236.7

Peridotite 22.8 236.7 – 259.5

The assay results from the second phase drill program will be released following their receipt, compilation

and interpretation.

Figure 1 ‐ Location of drill holes comprising the second phase of Xander’s maiden drill program.

The Timmins Nickel Project

The Timmins Nickel Project consists of two (2) separate mineral claim blocks (as shown in Figure 2 below)

and is located within the Timmins mining camp in Ontario, Canada, a highly prolific mining complex with

over 100 hundred years of history and well supported by major infrastructure including highways, rail, and

relatively inexpensive hydroelectric power.

The “North Block” consists of 336 claims located approximately 21 kilometres west of Canada Nickel

Company’s (CNC’s) Crawford Project where CNC has completed a preliminary economic assessment only

20 months after the commencemen t of exploration drilling that i ndicates 25-year mine with an after-tax

NPV8% of $1.2 billion i. It is also situated southwest of Kingsmill, Mahaffy-Aubin, an d Nesbitt North,

properties acquired from Noble Mi neral Exploration by Canada Ni ckel through option agreements earlier

in 2021 ii and adjacent to CNC’s recently identified Reid Discovery which has already through early

exploration delineated a mineralized footprint 90% as large as Crawford.

The “South Block” consists of 50 claims contiguous to Canada Nickel’s MacDiarmid Project where in May

2021, Canada Nickel announced a secondary discovery through the identification of significant

intersections of mineralized dunite similar to the average mine ralization initially discovered at Crawford.

Geophysical surveys reveal that the MacDiarmid target to be approximately 1.8 kilometres long indicating

a structural footprint averaging 400 meters in width – 15% larger than Canada Nickel’s original Crawford’s

Main Zone discoveryiii.

Figure 2 ‐ Location of Xander's Claims in the Timmins Camp 

Qualified Person

The technical content of this ne ws release has been reviewed an d approved by Mr. Andrew Tims, P.Geo.,

a qualified person as defined by National Instrument 43-101 Standards of Disclosure for Mineral

Projects (“NI 43-101”).

About Xander Resources Inc.

Xander Resources Inc. is a Canadian mineral acquisition and exp loration company based in Vancouver,

BC, Canada focused on developing accretive gold and battery met al properties within Canada. The

company currently has a focus on projects located within the Provinces of Ontario and Quebec.

Xander is exploring for commercially exploitable mineral deposi ts and is currently focused on deposits

located in Val-d’Or, Quebec, including the Senneville Claim Group which comprises over 100 sq. km and

is contiguous in the south to Probe Metals’ new discovery, and contiguous in the north to Monarch Mining,

in close proximity to Eldorado Gold’s (formerly QMX Gold) proje cts, and east of the North American

Lithium Deposit, Great Thunder Gold‘s Chubb Lithium property and East of the Sayona Quebec's Authier

Lithium Deposit, all in the Val-d’Or Mining Camp, plus its newl y acquired nickel-sulphide project in

Timmins, Ontario near Canada Nickel’s MacDiarmid and Crawford Projects.

We seek Safe Harbor

ON BEHALF OF THE BOARD OF DIRECTORS

Deepak Varshney, P.Geo., President and CEO

For more information, please email [email protected], or visit www.xanderresources.ca.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking statements:

This news release may include "forward-looking in formation" under applicable Canadian securities

legislation. Such forward-looking information re flects management's current beliefs and are based on a

number of estimates and/or assumptions made by and information currently available to the Company that,

while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors that

may cause the actual results and future events to differ materially from those expressed or implied by such

forward-looking information. Read ers are cautioned that such forwar d-looking information are neither

promises nor guarantees and are subject to known and unknown risks and uncertainties including, but not

limited to, general business, economic, competitive, political and social uncertainties, uncertain and

volatile equity and capital markets, lack of availabl e capital, actual results of exploration activities,

environmental risks, future prices of base and other metals, operating risks, accidents, labour issues, delays

in obtaining governmental approvals and permits, and other risks in the mining industry.

The Company is presently an exploration stage company . Exploration is highly speculative in nature,

involves many risks, requires substantial expenditu res, and may not result in the discovery of mineral

deposits that can be mined profitably. Furthermo re, the Company currently has no reserves on any of its

properties. As a result, there can be no assurance that such forward-looking statements will prove to be

accurate, and actual results and fu ture events could differ materially from those anticipated in such

statements.

i Preliminary Economic Assessment, titled "Crawford Nickel-Sulphide Project National Instrument 43-101

Technical Report and Preliminary Economic Assessment", Effective Date of May 21, 2021

ii https://canadanickel.com/wp-content/uploads/2021/04/20210422-Canada-Nickel-Acquires-Option-Properties-

final.pdf

iii https://canadanickel.com/wp-content/uploads/2021/10/2021-10-26-East-Zone-High-Grade-vFinal2.pdf