Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CCD.V ·

Exploration and Development Update ON the Taron Cesium Property, Argentina

Corporate Updates

1 

CASCADERO COPPER CORPORATION 

(TSXV: CCD) 

APRIL 18th 2017 

EXPLORATION AND DEVELOPMENT UPDATE ON THE TARON CESIUM PROPERTY, 

ARGENTINA 

HIGHLIGHTS 

 Seven  drill holes completed at Taron cesium prospect   

 Cabot Corp raises cesium fine chemical prices by 18%   

The Taron Cesium Deposit, Salta Province, Argentina

  The  Company  is  currently  drilling  TARON ‐ 2017‐  8  of  a  planned  29  vertical  core  holes. 

The  rig  is  using  HQ3  triple  tube  coring  to  a  planned  depth  of  75  metres  for  a  total  of  2,175 

metres. The triple tube coring will assist in getting better core recovery of the broken rock.  Drill 

collars  are  spaced  at  100  metres  north  south  and  50  metres  east  west  (see  attached  Map).

2 

The  drilling  grid  and  location  of  the  drill  collars  will  test  an  area  of  about  1.3  kms2  of  the 

property.   The  geological  model  (wire  frame  model)  is  based  on  5,600  metres  of  hand  and 

excavator  trenches  and  >6,000  assays  including  900  assays  from  seven  core  holes  drilled  in 

2009.  

  To  date,  the  drilling  is  identifying  a  very  shallow  northwest  dipping  structure  above  a 

basal unconformity with an approximate thickness of 65 metres as predicted by the Company’s 

geologists.   The  attitude  of  the  deposit  also  suggests  a  mining  operation  could  utilize 

inexpensive open‐cast mining with continuous backfilling in future years 

  There  are  also  two  parallel  zones  of  mineralization  to  the  east  of  the  main  body  (see 

attached Map) that will also be drill tested and which are believed to be tectonic intercalations 

or fault segments of the main body.  The mineralized system is otherwise open to the north and 

south, but dips under overburden cover to the east; a distance of greater than 3,000 metres.  

Its  ongoing  presence  is  supported  by  a  positive  geochemical  survey  program,  one  pit,  and  a 

2006 trench that assayed up to 3,400 ppm cesium.   

  The drilling program is expected to be completed in early June.   The first two drill holes 

are  now  in  transit  to  the  Bureau  Veritas  (BV)  prep  laboratory  in  Mendoza  and  subsequent 

assaying at BV’s lab in Vancouver.  Assays will be reported on an ongoing basis, when available. 

About Cesium 

  Cesium  (chemical  symbol  Cs)  is  a  rare  metal  best  known  for  its  extreme  chemical 

reactivity. Cesium hydroxide forms the start point of myriad end uses, including cesium formate 

(CsCHO2). The oil and gas drilling and well completion businesses are all migrating to alkaline 

formate fluids but the industries’ premium drilling and completion fluid is still cesium formate 

for which there is no acceptable replacement.    Cesium Formate is an environmentally benign 

solution with a high‐density (density 2.2) and low‐viscosity used to control formation pressures 

and temperatures in drilling of deep oil wells (HPHT).   As a dense medium, cesium formate is 

also  used  to  separate  DNA,  in  metallurgical  testing,  and  is  also  well  known  for  artificially 

produced radioactive isotopes used to treat various types of cancer.   Cesium compounds and 

chemicals are used in photo‐emissive devices, experimental magneto‐hydrodynamic electricity 

generation,  atomic  clocks  for  telecommunications  and  GPS  navigation  systems,  catalysts  in 

plastic  manufacturing,  specialty  glasses,  ion  propulsion  rocket  motors,  high‐density  alkaline 

batteries,  coatings  for  solar  cells,  petroleum  refining  and  in  food  preparation.  Research 

continues to generate new applications for cesium compounds.  

The Cesium Supply Chain 

  Cabot  Corporation  is  one  of  two  companies  that  are  supplying  cesium  to  the  global 

market from their Tanco Mine in Manitoba, Canada.   The other supplier, the Bikita Mine, is in 

3 

Zimbabwe,  and  it  ships  cesium  minerals  to  China  for  further  processing  by  Rockwood 

International (Albermarle).    Cascadero understand that both companies are mining their stock 

piles  and  both  mines  are  having  issues  with  finding  new  and  mineable  reserves.   The  Tanco 

Mine  is  presently  on  care  and  maintenance  after  repeated  falls  of  loose  rock,  and  anecdotal 

information from industry sources suggests that the Bikita Mine has 2 ‐ 3 years of reserves left 

in stockpile and no further resources have been found. 

In its annual report of 2016, Cabot issued the following statement regarding the situation 

at the Tanco Mine:    “However, the structural stability may change at any time and there is a 

possibility of deterioration and flooding of this mine. While we have not mined at our mine in 

Manitoba  since  we  completed  a  development  project  at  that  site  in  November  2015,  we  may 

resume  those  mining  operations  in  the  future.  The  failure  to  adequately  manage  these  risks 

could result in significant personal injury, loss of life, damage to mineral properties, production 

facilities  or  mining  equipment,  damage  to  the  environment,  delays  in  or  reduced  production, 

and potential legal liabilities.” 

Tanco also released information that it would service former preferred customers and in  

an April 12 of this year a Cabot Corp news release stated: “Effective April 12, 2017, or as 

contracts allow, Cabot Corporation will increase prices by up to 18 percent for its fine cesium 

chemicals product portfolio. Demand for Cabot’s fine cesium chemicals products increased in 

late 2016 and has continued into 2017. This price adjustment is required to support ongoing 

investments in Cabot’s fine cesium chemicals manufacturing facility co‐located with its mining 

operations in Lac du Bonnet, Manitoba, Canada. The increase will also help to ensure Cabot 

remains a reliable, long‐term supplier of high quality cesium products, and continues to deliver 

exceptional support to its customers.” 

The global cesium fine chemical market represents about ~25% of global cesium

consumption with HPHT drilling fluids accounting for the balance of~75%. It is unclear if the

price increase was affected for reasons of supply reserve constraints or Cabot is increasing its

gross margin to benefit the Company which is a historically low-margin performer. However,

Cascadero considers that this price increase will endure, and further price increases may be

coming. The fine chemical business is a high-margin business but has a different business

model than that of cesium formate drilling fluid. In the former case, the fine chemical products

are sold and appear to be consumed with no recyclable ability. In contrast, the specialty fluid

products can be recycled, be reconstituted, and leased out repeatedly. The cost of downhole

losses must be made up by the drilling companies.

Cascadero’s Taron Objectives

At  Taron,  the  objective  is  to  develop  a  mineable  reserve  and  to  produce  cesium 

hydroxide,  which  is  the  core  chemical  substrate  of  all  other  cesium  products.  Making  cesium 

4 

formate  is  probably  the  single  largest  volume  use  of  cesium  hydroxide  and  the  company  has 

already demonstrated and patented these abilities (see News Release of November 30, 2015).  

  The  Company  has  retained  Ron  Simpson  of  GeoSim  Services  Inc.  who  will  act  as  the 

Qualified Person (QP) for the program of developing the resource at Taron.   

  This  news  release  and  its  technical  content  has  been  read  and  approved  by  Dr.  David 

Trueman, Ph.D, P.Geo, who is the Company’s Qualified Person under National Instrument 43‐

101.   

  The Taron Cesium deposit remains as the main focus of the Company’s work.   

Bill McWilliam 

Chairman 

Email : [email protected] 

O : 604.924.5504 

C : 604.999.0391 

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of 

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release