Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CCCM.V ·

C3 Metals Intersects 2.79% Copper and 0.59 g/t Gold over 21 Metres, Extending Jasperoide Project, Peru

Drill Results

C3 Metals Intersects 2.79% Copper and 0.59 g/t

Gold over 21 Metres, Extending Jasperoide

Project, Peru

Toronto, Ontario--(Newsfile Corp. - September 9, 2022) -

C3 Metals Inc.

(TSXV: CCCM) (OTCQB:

CUAUF) ("C3 Metals" or the "Company") is pleased to announce further outstanding results from its

Phase 2 drilling program at the Jasperoide copper-gold skarn/porphyry project in Peru.

The recently

completed Phase 2 drill program comprising a total 6,811m in 20 drill holes has delineated a near

surface, high-grade oxide copper-gold deposit at the Montaña de Cobre Zone ("MCZ") and tested

copper-sulphide mineralization at the nearby Cresta Verde Zone ("CVZ").

Phase 2 Drilling Program Highlights:

Hole JAS2900-02 intersected

81.55m at 0.89% Cu, 0.25g/t Au from 21.0m

, including

21.14m at

2.79% Cu and 0.59% Au.

Extended high-grade copper-gold oxide mineralization by approximately 100m to the north from

drill hole JA2800-01, which assayed

48.2m at 1.24% Cu and 0.43 g/t Au.

Phase 1 and 2 drilling has defined an oxide copper-gold mineralized deposit that is laterally

extensive for up to 650 metres and has a strike length of more than 550 metres. True thickness

varies from 50 to 250 metres.

Mineral domaining and updated geologic block modelling is underway.

Two holes tested a heavy sulphide brecciated skarn zone at CVZ (assays pending).

Eight shallow holes tested a magnetite skarn body north of the Benoni Fault, where a single

historic drill hole intersected 23.5m at 1.86% copper and 0.54% cobalt

[1]

(assays pending)

Dan Symons, President & CEO, stated,

"Having recently joined C3 Metals, I'm very pleased with the

exploration results to date at Jasperoide.

We have successfully delineated a sizeable, coherent body

of near surface high-grade copper-gold skarn mineralization and see indications of a potential

porphyry system.

However, I am truly excited by the fact that in a short period of time we have

expanded our prospective land position by 377% to 27,200 hectares and our drilling to date has only

been focused on less than 20% of the total mineral tenure under C3 Metals' control.

We look forward

to further testing the numerous targets identified on the wider property once exploration permits are in

hand for these newly acquired concessions.

Given the location, geologic setting and sheer size of our

land position, we believe we are only beginning to scratch the surface on Jasperoide's exploration

potential."

Figure 1: Brecciated skarn in hole JAS2900-02; intensely oxidized and showing significant malachite

and chrysocolla mineralization (

Interval 94.70m - 99.0m assayed 5.87% Cu and 0.91g/t Au

).

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2661/136473_3e82da6d14e1e91d_001full.jpg

The Company also drilled two deep holes (JAS3000-6 and JAS2800-07) testing the system to depths of

+1000m.

While altered porphyry fragments were encountered, assays reported no significant copper

mineralization.

Stephen Hughes, Vice President of Exploration, commented, "

We are pleased to have intersected

further near surface high-grade copper-gold skarn mineralization, which has extended the high-grade

domain a further 100m north.

Our two deep holes tested for potential porphyry and skarn

mineralization below MCZ and adjacent to the Constancia Fault zone, but did not intersect significant

copper mineralization.

However, we observed phyllic altered diorite fragments in a hydrothermal

breccia, and numerous other porphyry vectors that support our interpretation of a mineralized

porphyry system at Jasperoide.

Work has already commenced on updating the mineral domains and

geologic block model aimed at identifying additional mineralized bodies for testing in the next round

of drilling."

Table 1

. Significant intercepts recently drilled at Montaña de Cobre Zone

Hole

From

To

Length

Cu

(%)

Au

(g/t)

Ag

(g/t)

Mineralization

Style

JAS2900-02

21.00

102.55

81.55

0.89

0.25

1.94

Skarn

Including

81.40

102.55

21.15

2.79

0.59

1.94

Skarn

JAS2900-03

38.70

77.30

38.60

0.54

0.26

1.68

Skarn

JAS2800-04

38.60

56.75

18.15

0.36

0.46

1.49

Skarn

JAS2800-04

64.60

124.00

59.40

0.48

0.18

1.17

Skarn

JAS2800-05

60.10

103.10

43.00

0.30

0.02

2.39

Skarn

JAS2800-06

2.20

16.30

14.10

0.35

0.13

3.20

Skarn

Notes:

1

.

Significant intercepts reported as length-weighted averages exceeding 0.15% Cu and 0.10g/t Au, with <5m of consecutive internal dilution.

2

.

Copper and Gold are uncut.

3

.

True width of down-hole intersections reported are estimated to be approximately 60-90% of the down-hole lengths.

Figure 2: Airborne magnetic analytical signal image and copper in soils over the Greatiam 10 & 70 and

Jasperoide 1 & 2 Exploration Concessions, showing all drill collars.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2661/136473_3e82da6d14e1e91d_002full.jpg

Outlook

Figure 3:

Location plan showing C3 Metals exploration holdings in southern Peru.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2661/136473_3e82da6d14e1e91d_003full.jpg

Exploration permitting is underway for several of the newly acquired mineral concessions.

As the

permitting is being progressed, the Company will be undertaking sighter metallurgy leach and flotation

test work on the copper-gold oxide mineralization at MCZ to assess recoveries, acid consumption and

variability characteristics for the different material types within the deposit delineated to date.

The

metallurgical response of the different material types aims to assess the potential viability of various

processing options for the near surface oxide copper and gold mineralization and is an important de-

risking milestone for the Company.

Initial review of the newly acquired land package surrounding Jasperoide indicates high potential for the

discovery of additional near surface copper skarn deposits similar to the MCZ deposit.

Upon receipt of

the exploration permits for these areas, C3 Metals plans to aggressively explore to build the inventory of

near surface skarn hosted copper-gold mineralization and test potential for large scale porphyry

systems.

QP Statement

Stephen Hughes, P.Geo. is Vice President Exploration and a Director for C3 Metals and is a Qualified

Person as defined by National Instrument 43-101.

Mr. Hughes has reviewed the technical information in

this news release and approves the written disclosure contained herein.

For additional information, contact:

Dan Symons

President & CEO

+1 416 716 6466

[email protected]

ABOUT C3 METALS INC.

C3 Metals Inc. is a junior minerals exploration company focused on creating substantive value for its

shareholders through the discovery and development of large copper and gold deposits.

The Company's

flagship project is the Jasperoide high-grade copper-gold skarn and porphyry system located in the

prolific Andahuaylas-Yauri Porphyry-Skarn belt of Southern Peru, holding 100% ownership of 49 claims

covering 26,698 hectares and the right to earn 100% in the Greatiam 10 and 70 claims covering 500

hectares.

Mineralization at Jasperoide is hosted in a similar geological setting to the nearby major

mining operations at Las Bambas (MMG), Constancia (Hudbay) and Antapaccay (Glencore).

C3 Metals

also holds a 100% interest in five licenses covering 207 sq km of highly prospective copper-gold terrain

in Jamaica and a 2% royalty in Tocvan's Rogers Creek project.

Related Link:

www.c3metals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Caution Regarding Forward-Looking Statements

Certain statements contained in this press release constitute forward-looking information. These

statements relate to future events or future performance. The use of any of the words "could", "intend",

"expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to

matters that are not historical facts are intended to identify forward-looking information and are based on

the Company's current belief or assumptions as to the outcome and timing of such future events. Actual

future results may differ materially. In particular, this release contains forward-looking information relating

to, among other things, the exploration operations of the Company and the timing which could be

affected by the current global COVID-19 pandemic. Those assumptions and factors are based on

information currently available to the Company.

Although such statements are based on reasonable

assumptions of the Company's management, there can be no assurance that any conclusions or

forecasts will prove to be accurate.

While the Company considers these assumptions to be reasonable based on information currently

available, they may prove to be incorrect. Forward-looking information involves known and unknown

risks, uncertainties and other factors which may cause the actual results, performance or achievements

to be materially different from any future results, performance or achievements expressed or implied by

the forward-looking information. Such factors include risks inherent in the exploration and development of

mineral deposits, including risks relating to changes in project parameters as plans continue to be

redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral

prices and the worldwide demand for and supply of minerals, risks related to increased competition and

current global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on

key personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the

necessary licenses and permits, financing, capitalization and liquidity risks.

The forward-looking information contained in this release is made as of the date hereof, and the

Company is not obligated to update or revise any forward-looking information, whether as a result of new

information, future events or otherwise, except as required by applicable securities laws. Because of the

risks, uncertainties and assumptions contained herein, investors should not place undue reliance on

forward-looking information. The foregoing statements expressly qualify any forward-looking information

contained herein.

_______________________________

[1]

Data retrieved from Hochschild Mining's database and internal reports. Hochschild was operator of the Jasperoide Project from 2011 to 2012 and

completed two drill programs. C3 Metals has access to the entire drill database and believes that the reporting of the information was to industry

standard practice.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/136473