Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CCCM.V ·

C3 Metals Intersects 235 metres of 0.67% Copper, 0.34 g/t Gold at Jasperoide 1.8 km Step-Out Hole Hits Mineralized Skarn

Drill Results

C3 Metals Intersects 235 metres of 0.67%

Copper, 0.34 g/t Gold at Jasperoide

1.8 km Step-Out Hole Hits Mineralized Skarn

Toronto, Ontario--(Newsfile Corp. - September 8, 2021) -

C3 Metals Inc.

(TSXV: CCCM) ("C3 Metals"

or the "Company") is pleased to announce assays from a further five holes from its ongoing drilling

program of the Jasperoide Copper-Gold Project, Southern Peru.

All five holes were drilled on Line

JAS2700 at the Montana de Cobre prospect, located 50 metres north of high-grade copper-gold

mineralization reported on Line JAS2650 (Press release dated May 25, 2021).

Drilling on Line JAS2700 successfully confirmed that high-grade copper-gold mineralization is laterally

extensive over 500m and is 100m to 125m in true thickness.

Interpreted feeder structures and breccia

zones identified in hole JAS2700-04 returned high gold and silver values, typical of high-sulphidation

style mineralization.

Separately, drilling is progressing on a high priority coincident magnetic and IP anomaly at

Cresta

Verde

, 1.8km north-northwest of Line JAS2600 (Figure 1).

The current hole (JAS4350-02) has

intersected significant intervals of pervasive skarn alteration with semi-massive to massive sulphides

and visible copper sulphide mineralization.

This hole is collared approximately 700 metres northwest of

historic drill hole JADD11-20 that clipped the southeastern edge of the same coincident geophysical

anomaly and intersected

23.5m at 1.86% Cu

1

from 19m.

Drilling Highlights:

Strong copper-gold mineralization intersected over broad intervals on section JAS2700 includes:

JAS2700-06

235.18m @ 0.67% Cu and 0.34 g/t Au

from 21.5m

including 100.4m @ 0.84% Cu and 0.32 g/t Au

from 64.4m

JAS2700-07

43.45m @ 2.21% Cu and 0.49 g/t Au

from 85.85m

including 15.00m @ 5.44% Cu and 0.39 g/t Au

from 113.5m

JAS2700-08

87.30m @ 0.97% Cu and 0.35 g/t Au

from 21.30m

including 24.8m @ 2.00% Cu and 0.61 g/t Au

from 83.8m

High grade gold in JAS2700-06 assayed

1.2m @ 47.7g/t Au, 12.7g/t Ag, 0.58% Cu

from

232.4m

High sulphidation style feeder structures confirmed in JAS2700-04 and 05.

Better assays included:

JAS2700-05

26.5m @ 0.41g/t Au and 30g/t Ag

from 89.1m

Assay results are pending for a further 15 drill holes

Drilling is ongoing at Cresta Verde Zone on section line JAS4350

Kevin Tomlinson, President & CEO of C3 Metals, commented,

"We are very encouraged by the broad extent and continuity of the shallow high-grade copper and

gold mineralization being intersected at Jasperoide.

Significantly, primary copper sulphides have

been intersected below the oxide zone in drill hole JAS2700-05 and high-sulphidation feeder

structures hosting gold and silver mineralization are confirmed.

These important observations

combined with other geological vectors strongly suggest a well-developed concealed copper-gold

porphyry system is driving the extensive mineralized skarn development we are currently drilling.

"Given the coincidence of high-grade copper-gold mineralization with strong magnetite alteration, the

Company recently flew airborne magnetics over its entire tenement holdings.

This was followed by

ground IP surveys on key target areas.

Multiple large discrete magnetic anomalies with coincident

chargeability anomalies are evident in the recently processed data.

The drill rig was mobilized to a

high priority geophysical target at the Cresta Verde prospect, 1.8km to the north of where three holes

were recently completed at Montaña de Cobre.

C3 Metals' geologists in Peru are excited by initial drill

observations, reporting significant intervals of pervasive skarn alteration with visible copper sulphide

mineralization.

This drill hole proves the Company's exploration strategy is working and we look

forward to drill testing multiple other high priority coincident geophysical anomalies and geochemical

targets."

A total of 32 drill holes have been completed to date with drilling now progressing on Line JAS4350

(Figure 1).

Copper mineralization has been intersected in all holes drilled to date.

Montaña de Cobre Drill Results

Two drill fans in eight holes were completed on Line JAS2700 for 1,552.9m, defining a strongly

mineralized skarn body with a shallow westerly dip that is contiguous for over +500m laterally (Figure 2).

Results from the first three holes on this section were reported on July 27, 2021 and include

118.71m @

1.15% Cu and 0.37 g/t Au from 87.3m

with an internal high-grade section of

29.95m @ 2.57% Cu

and 0.50 g/t Au

in drill hole JAS2700-03.

Drill holes JAS2700-06, 07 and 08 covered in this release intersected oxidized garnet diopside and

magnetite skarn consistent with geological observations in drill holes JAS2700-01, 02 and 03.

Secondary copper species comprise malachite, chrysocolla and azurite filling open spaces, as

disseminated grains and in veins.

A total of 57 core samples have been sent for petrographic analysis to

confirm skarn alteration mineralogy and copper speciation.

Similar to Line JAS2650, high-grade gold

mineralization is locally associated with metre-scale breccia zones, particularly in drill hole JAS2700-06,

which intersected

1.2m @ 47.7g/t Au, 12.7g/t Ag and 0.58% Cu

(Figure 3).

Drill holes JAS2700-04 and 05 intersected intensely silicified, brecciated and locally strongly sheared

zones interpreted as "feeder structures" to high-sulphidation style epithermal mineralization, which

bisects the skarn.

Assays from this zone confirm strong gold and silver geochemistry, which is typical of

high-sulphidation epithermal style feeder structures.

As previously reported, primary copper sulphide and

pyrite mineralization was intersected below the extensive copper oxide zone in drill hole JAS2700-05

and this sulphide zone assayed

41.5m @ 0.31% Cu and 0.11g/t Au.

The pyrite to chalcopyrite ratio in

the sulphide zone is approximately 3:1, suggesting this zone is distal to the central skarn where

significant bornite and chalcopyrite and lesser pyrite are expected.

Summary

Drilling on section line JAS2700 at Montaña de Cobre demonstrates that skarn hosted copper-gold

mineralization is pervasive and laterally extensive for over 500 metres and remains open in multiple

directions and to depth.

An 1,800 line km helicopter-borne magnetic and radiometric survey and a 43 line km ground Induced

Polarisation (IP) survey were recently completed, identifying several strongly coincident magnetic and IP

chargeability anomalies.

Consequently, the drill rig was recently moved to Cresta Verde Zone to test one

of the high priority coincident geophysical targets generated.

Drilling on Line JAS4350 intersected

significant skarn alteration with sections of visible copper mineralization (Figure 4).

Surface mapping and grid soil sampling programs have also recently been completed.

Geological,

geochemical and geophysical data will be reviewed and employed to design deeper drill holes to test for

additional mineralized skarn horizons and a concealed porphyry system interpreted at depth.

As the drill program progresses, additional results will be released as they become available.

Significant

assays from drill holes JAS2700-04 to 08 are included in the table below.

Hole

From

To

Length

Cu

(%)

Au

(g/t)

Ag

(g/t)

Mineralization

Style

JAS2700-04

52.80

65.85

13.05

0.50

NSA

1.20

Skarn

JAS2700-04

70.31

99.98

29.67

0.13

0.17

2.44

Epithermal

JAS2700-04

109.85

165.00

55.15

NSA

0.27

2.96

Epithermal

JAS2700-04

165.00

205.20

40.20

0.73

0.23

1.35

Skarn

JAS2700-05

56.50

64.70

8.20

0.25

NSA

0.89

Skarn

JAS2700-05

70.60

88.00

17.40

0.32

0.15

1.79

Skarn

JAS2700-05

89.10

115.60

26.50

NSA

0.41

30.10

Epithermal

JAS2700-05

119.80

206.60

86.80

0.42

0.32

1.18

Skarn

JAS2700-05

226.00

267.50

41.50

0.31

0.12

4.82

Skarn

JAS2700-06

21.52

256.70

235.18

0.67

0.34

2.19

Skarn

Includes

64.40

164.80

100.40

0.84

0.32

2.72

Skarn

JAS2700-07

0.45

21.40

20.95

0.28

0.13

1.69

Skarn

JAS2700-07

28.45

79.40

50.95

0.48

0.17

1.54

Skarn

JAS2700-07

85.85

129.30

43.45

2.21

0.49

3.27

Skarn

Includes

113.50

128.50

15.00

5.44

0.39

6.65

Skarn

JAS2700-08

4.10

15.30

11.20

0.25

0.12

2.83

Skarn

JAS2700-08

21.30

108.60

87.30

0.97

0.35

1.90

Skarn

Includes

62.10

68.35

6.25

1.44

0.56

1.84

Skarn

Includes

83.79

108.60

24.81

2.00

0.61

2.10

Skarn

Notes:

1

.

Significant intercepts are reported as length-weighted averages exceeding 0.20% Cu, with less than 5m of consecutive internal dilution.

2

.

Arbitrary top cut of 5g/t on gold assays has been used, copper is uncut.

3

.

True width of down-hole intersections reported are estimated to be approximately 60-90% of the down-hole lengths.

Figure 1: Ground magnetic analytical signal image and current drill hole locations.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/2661/95833_eaa76f91c4e7c9b2_001full.jpg

Figure 2: Jasperoide Cross Section JAS2700 (50m window).

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/2661/95833_eaa76f91c4e7c9b2_002full.jpg

Figure 3: JAS2700-06 (231.8 - 235.2m) showing an oxidized breccia cut by quartz-magnetite vein,

interval 232.4 - 233.6m assayed 1.2m @ 47.7g/t Au, 12.7g/t Ag and 0.58% Cu.

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/2661/95833_eaa76f91c4e7c9b2_003full.jpg

Figure 4: (Top Left) JAS4350-02 (223.6m) Garnet-Diopside Skarn cut by epithermal quartz-carbonate-

pyrite vein (Top Right) JAS4350-02 (284.3m) Garnet-Magnetite Skarn with chalcopyrite mineralization.

(Bottom Left) JAS4350-02 (315.0m) Endoskarn altered diorite with chalcopyrite disseminations

.

(Bottom Right) JAS4350-02 (359.0m) showing pyrrhotite-chalcopyrite-pyrite veins cutting hornblende

diorite.

To view an enhanced version of Figure 4, please visit:

https://orders.newsfilecorp.com/files/2661/95833_c3figure4.jpg

References for Historic Data

1

Data retrieved from Hochschild Mining's database and internal reports.

Hochschild was operator of the

Jasperoide Project from 2011 to 2012 and completed two drill programs.

C3 Metals has access to the

entire drill database and believes that reporting of the information was to industry standard practice.

For additional information, contact:

Kevin Tomlinson

President & CEO

[email protected]

Alec Rowlands

Vice President, Investor Relations

+1 416 572 2512

[email protected]

ABOUT C3 METALS INC.

C3 Metals Inc. is a junior minerals exploration company focused on creating substantive value for its

shareholders through the discovery and development of large copper and gold deposits.

The Company's

flagship project is the 57km

2

Jasperoide high-grade copper-gold skarn and porphyry system located in

the prolific Andahuaylas-Yauri Porphyry-Skarn belt of Southern Peru.

Mineralization at Jasperoide is

hosted in a similar geological setting to the nearby major mining operations at Las Bambas (MMG),

Constancia (Hudbay) and Antapaccay (Glencore).

C3 Metals also holds a 100% interest in five licenses

covering 207 km

2

of highly prospective copper-gold terrain in Jamaica, and a 100% interest in two

porphyry copper-gold properties, with one under option to Tocvan Ventures, covering 304 km

2

within the

Cascade Magmatic Arc in southwestern British Columbia.

Related Link:

www.c3metals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

QP Statement

Stephen Hughes, P.Geo. is Vice President Exploration and a Director for C3 Metals and is a Qualified

Person as defined by National Instrument 43-101.

Mr. Hughes has reviewed the technical information in

this news release and approves the written disclosure contained herein.

Technical Program

Half core samples are analysed by 4-Acid digest ICP-MS finish for 60 elements, including pathfinder

REE elements with pulps from samples reporting greater than 1.0% copper being re-assayed by the ore

grade method.

Gold is analysed by 30g Fire Assay AAS finish, with pulps from samples reporting

greater than 5ppm re-assayed by 1kg Screen Fire Assay.

COVID-19 Protocols

The Company continues to implement its COVID-19 safety protocols at site to ensure the safety of

employees and the communities surrounding the Jasperoide project area.

Caution Regarding Forward Looking Statements

Certain statements contained in this press release constitute forward-looking information. These

statements relate to future events or future performance. The use of any of the words "could", "intend",

"expect", "believe", "will", "projected", "estimated" and similar expressions and statements relating to

matters that are not historical facts are intended to identify forward-looking information and are based on

the Company's current belief or assumptions as to the outcome and timing of such future events. Actual

future results may differ materially. In particular, this release contains forward-looking information relating

to, among other things, the exploration operations of the Company and the timing which could be

affected by the current global COVID-19 pandemic. Those assumptions and factors are based on

information currently available to the Company.

Although such statements are based on reasonable

assumptions of the Company's management, there can be no assurance that any conclusions or

forecasts will prove to be accurate.

While the Company considers these assumptions to be reasonable based on information currently

available, they may prove to be incorrect. Forward looking information involves known and unknown

risks, uncertainties and other factors which may cause the actual results, performance or achievements

to be materially different from any future results, performance or achievements expressed or implied by

the forward-looking information. Such factors include risks inherent in the exploration and development of

mineral deposits, including risks relating to changes in project parameters as plans continue to be

redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral

prices and the worldwide demand for and supply of minerals, risks related to increased competition and

current global financial conditions and the COVID-19 pandemic, access and supply risks, reliance on

key personnel, operational risks, and regulatory risks, including risks relating to the acquisition of the

necessary licenses and permits, financing, capitalization and liquidity risks.

The forward-looking information contained in this release is made as of the date hereof, and the

Company is not obligated to update or revise any forward-looking information, whether as a result of new

information, future events or otherwise, except as required by applicable securities laws. Because of the

risks, uncertainties and assumptions contained herein, investors should not place undue reliance on

forward-looking information. The foregoing statements expressly qualify any forward-looking information

contained herein.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/95833