Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CBI.V ·

Colibri's Option Partner Reports Trench Sample Results Including 19.8 Metres of 0.73 g/t Au and 19.5 Metres of 0.61 g/t Au at Pilar Gold & Silver Project in Sonora, Mexico

Drill Results Sampling & Geoscience Results

Colibri's Option Partner Reports Trench

Sample Results Including 19.8 Metres of 0.73

g/t Au and 19.5 Metres of 0.61 g/t Au at Pilar

Gold & Silver Project in Sonora, Mexico

Dieppe, New Brunswick--(Newsfile Corp. - January 18, 2022) - Colibri Resource Corporation (TSXV:

CBI) ("Colibri" or the "Company") is pleased to announce that its partner Tocvan Ventures Corp.

("Tocvan") has reported four trench sample results at the Pilar Gold & Silver Project.

Tocvan is currently in its 3

rd

year of a 5 year agreement to earn an initial 51% of Colibri's Pilar Gold &

Silver Project located in the prolific gold producing state of Sonora in Mexico. For full details of Colibri's

agreement with Tocvan please see the Company's news release dated

September 24th, 2019

.

Tocvan reports

A total of four trenches were completed in December, 2021 totalling 80 meters length. All four trenches

intersected mineralization with two trenches yielding consistent mineralization across the entire length of

the trench. T-21-2, intersected

19.5 meters of 0.61 g/t Au

across the entire length of the trench in an

area along the developing 4-Trench Trend. T-21-3, yielded

19.8 meters of 0.73 g/t Au

and was targeted

to provide key geochemical information across the Main Zone where mineralization outcrops at surface.

Initial bulk-sample material from T-21-3 will be submitted to SGS Laboratories in Durango, Mexico and

used for column leach studies. Follow-up metallurgical studies will utilize the surface material extracted

from the other three trenches.

Trench Results Highlights

T-21-1 - 4.9m at 0.55 g/t Au and 11 g/t Ag

T-21-2 - 19.5m at 0.61 g/t Au and 6 g/t Ag

Including, 11.5m at 0.87 g/t Au and 7 g/t Ag

Including, 2.7m at 3.01 g/t Au and 20 g/t Ag

T-21-3 - 19.8m at 0.73 g/t Au and 8 g/t Ag

Including 8.6m at 1.27 g/t Au and 12 g/t Ag

T-21-4 - 7m at 0.54 g/t Au and 5 g/t Ag

"The results from our trench program are very encouraging, especially in regard to defining key

material for advanced metallurgical studies and showcasing the surface continuity of gold

values"

commented CEO, Brodie Sutherland

. "Material from these trenches will be utilized for

advanced column leach studies to build off our encouraging bottle roll results from 2021 that yielded

over 90% recovery of gold. Trench T-21-2 has yielded promising results in our developing 4-Trench

Trend which we will follow up with systematic drill targeting."

Discussion of Trench Results

Trenches completed were 20 meters long, up to 5 meters wide and up to 2 meters deep. Samples were

collected as channel samples perpendicular to structures over intervals up to 2 meters in length and

adjusted to match changes in lithology or alteration.

T-21-1:

This trench was completed to test a broad mineralized zone with visible copper oxide

mineralization along the northwestern most extent of the Pilar main vein trend. The trench totalled 21.5

meters in length and intersected

4.9 meters of 0.55 g/t Au and 11 g/t Ag

. Weak anomalous copper

values averaged 0.1% across the entire length of the trench. Copper mineralization is a unique

characteristic to this northwestern area of the property.

T-21-2:

This trench was completed to better understand the controls of mineralization along the 4-Trench

Trend. The trench returned significant mineralization across the entire length of the trench, intersecting

19.5 meters of 0.61 g/t Au and 6 g/t Ag.

A mineralized fault structure returned higher grades across

2.7 meters with 3 g/t Au and 20 g/t Ag

.

The results from this trench further confirms the prospectivity of

the 4-Trench target and the importance of continuing systematic exploration across the trend. Material

from this trench will be selected for later metallurgical test work.

T-21-3:

This trench was completed to collect fresh channel samples across the surface expression of the

Main Zone showing. Significant mineralization was intersected across the entire length of the trench,

returning

19.8 meters of 0.73 g/t Au and 8 g/t Ag, including 8.6 meters of 1.3 g/t Au and 12 g/t Ag

.

Historic sampling suggests the mineralized zone extends on either side of the trench. Material from this

trench will be bulk sampled for detailed column leach metallurgical test work.

T-21-4:

This trench was completed to test the northwestern extent of the Main Zone surface expression

where a historic artisanal adit is located along the mineralized trend. The trench totalled 21 meters in

length and intersected

7 meters of 0.54 g/t Au and 5 g/t Ag

. Material from this trench will be selected

for later metallurgical test work.

Table 1. Summary of Trench Program Results.

Trench

Cutoff (Au

g/t)

From

To

Length(m)

Au (g/t)

Ag (g/t)

Cu (ppm)

Pb

(ppm)

Zn(ppm)

T-21-1

None

0.0

21.5

21.5

0.18

5

1219.86

49.96

256.25

T-21-1

0.1

3.5

15.8

12.3

0.28

7

1136.35

60.97

279.73

T-21-1

0.5

4.6

9.5

4.9

0.55

11

1162.16

109.27

235.12

T-21-2

None

0.0

21.5

21.5

0.57

6

457.73

512.09

5816.81

T-21-2

0.1

2.0

21.5

19.5

0.61

6

498.12

497.84

6140.59

T-21-2

0.5

6.0

17.5

11.5

0.87

7

578.20

491.47

6558.39

T-21-2

1

6.0

8.7

2.7

3.01

20

1979.44

1404.44

11827.78

T-21-3

0.1

0.0

19.8

19.8

0.73

8

268.53

112.09

3336.15

T-21-3

0.5

1.2

13.8

12.6

1.02

9

344.22

147.86

4259.03

T-21-3

1

1.2

9.8

8.6

1.27

12

279.67

198.72

5739.51

T-21-4

None

0.0

21.0

21.0

0.24

2

246.90

39.07

1597.48

T-21-4

0.1

10.0

21.0

11.0

0.43

4

359.36

51.50

2613.18

T-21-4

0.5

12.0

19.0

7.0

0.54

5

401.57

56.36

3110.71

Figure 1. Plan Map of Highlighting Trench Program.

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/4269/110632_7df020e024285ae4_001full.jpg

Figure 2. Schematic Cross-Section along trench T-21-3

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/4269/110632_7df020e024285ae4_002full.jpg

About the Pilar Property

The Pilar Gold-Silver property is interpreted as a structurally controlled low-sulphidation epithermal

project hosted in andesite rocks. Three zones of mineralization have been identified in the north-west

part of the property from historic surface work and drilling and are referred to as the Main Zone, North Hill

and 4-Trench. Structural features and zones of mineralization within the structures follow an overall NW-

SE trend of mineralization. Over 22,700 m of drilling have been completed to date. Significant results are

highlighted below:

2021 Phase II RC Drilling Highlights include (

all lengths are drilled thicknesses

):

39.7m @ 0.96 g/t Au, including 1.5m @ 14. g/t Au

47.7m @ 0.70 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag

29m @ 0.71g/t Au

35.1m @ 0.66 g/t Au

2020 Phase I RC Drilling Highlights include (

all lengths are drilled thicknesses

):

94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;

41.2m @ 1.1 g/t Au, including 3.1m @ 6.0g/t Au and 12 g/t Ag ;

24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag

17,700m of Historic Core & RC drilling. Highlights include:

61.0m @ 0.8 g/t Au

16.5m @ 53.5g/t Au and 53 g/t Ag

13.0m @ 9.6 g/t Au

9.0m @ 10.2 g/t Au and 46 g/t Ag

Soil and Rock sampling results from undrilled areas indicate mineralization extends towards

the southeast from the Main Zone and 4-Trench Zone. Recent Surface exploration has defined

three new target areas: Triple Vein Zone, SE Vein Zone and 4 Trench Extension.

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on

acquiring and exploring prospective gold & silver properties in Mexico. The Company has six exploration

projects of which five currently have exploration programs being executed in 2022. (1) The flagship

Evelyn Gold Project

is 100% owned and explored by Colibri, (2) the

Pilar Gold & Silver Project

(optioned to

Tocvan Ventures- (CSE: TOC))

, (3) the

El Mezquite Gold & Silver Project

, (4) the

Jackie

Gold & Silver Project, and (5) the Diamante Gold & Silver Project.

3,4,and 5 are subject to earn-in

agreements by

Silver Spruce Resources - (TSXV: SSE)

.

For more information about all Company projects please visit:

www.colibriresource.com

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Notice Regarding Forward-Looking Statements:

This news release contains "forward-looking statements". Statements in this press release which are not

purely historical are forward-looking statements and include any statements regarding beliefs, plans,

expectations or intentions regarding the future. Actual results could differ from those projected in any

forward-looking statements due to numerous factors. These forward-looking statements are made as of

the date of this news release, and the Company assumes no obligation to update the forward-looking

statements, or to update the reasons why actual results could differ from those projected in the forward-

looking statements. Although the Company believes that the plans, expectations and intentions

contained in this press release are reasonable, there can be no assurance that they will prove to be

accurate.

For information contact: Ronald J. Goguen, President, Chairperson and Director, Tel: (506) 383-4274,

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/110632