Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CBI.V ·

Colibri Samples 9.84 g/t Au on the Plomo Property at the EP Project, Caborca Gold Belt, Sonora

Drill Results Sampling & Geoscience Results

Colibri Samples 9.84 g/t Au on the Plomo

Property at the EP Project, Caborca Gold Belt,

Sonora

Dieppe, New Brunswick--(Newsfile Corp. - June 20, 2023) - Colibri Resource Corporation (TSXV: CBI)

(OTC Pink: CRUCF) ("Colibri" or the "Company") is very pleased to report the results of geological

mapping and outcrop sampling at the Pavo Real target on the Plomo property, EP Gold Project,

Caborca Gold Belt ("CGB"), northwestern Sonora.

Results have confirmed and expanded the footprint of

gold ("Au") in tourmaline altered diorite at Pavo Real and include a high of 9.48 grams per tonne ("g/t")

Au.

Ron Goguen, President & CEO of Colibri commented,

"We are very encouraged by the results of

our inaugural exploration work program on the Plomo property, which we acquired in March.

This work represents the first steps in the evaluation of Plomo's large and highly prospective

land position within the EP Gold Project. Colibri will continue to aggressively advance towards

a maiden drill program at Plomo".

PAVO REAL HISTORY & RESULTS

Historical work at the Pavo Real target documents widespread tourmaline alteration including tourmaline

in NW trending structures reported to be traced over a 600 m strike length and containing anomalous

gold values including 5.82 g/t Au.

Due diligence reconnaissance field work, conducted earlier in year,

confirmed the presence of tourmaline-quartz alteration (commonly forming overprinting stock work and

breccia textures) and sampling confirmed the presence of Au with several grab samples greater than 1

g/t Au and a high-grade grab sample of 9.94 g/t Au.

A selected area at Pavo Real, approximately ½ km x ½ km, was mapped and 90 grab samples were

collected for Au analyses (see Map 1).

Au was detected in all but 11 of the samples, 38 of the samples

returned values greater than 0.1 g/t Au, 13 samples returned values greater than 1.0 g/t Au with the

highest grade sample being 9.84 g/t Au.

Mineralized samples (> 0.1 g/t Au) are characterized by quartz-

tourmaline breccia matrix and stockwork overprinting a quartz, sericite, tourmaline, pyrite (Fe-oxide)

altered felsic host rock.

The higher-grade samples also commonly include veinlets mapped as jasperoid

which in thin section was determined to be a very fine grained assemblage of limonite and hematite and

interpreted to possibly be derived from a primary Fe-carbonate bearing vein assemblage.

The

mineralized tourmaline bearing breccia and stock work samples are massive to strongly foliated where

foliation consistently has a north-northwest strike and moderate northeast dip.

Northwest and northeast

trending structures and associated apparent grade directional trends are evident on the Plomo property

(as well as Evelyn).

These structural orientations are important in the regional geological evolution and

control the occurrence of major gold deposits in the Caborca Gold Belt.

Illustration 1: Grab samples and geology on topo contour map, Pavo Real Target area

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/170682_fc47a144841dbaea_001full.jpg

EP PROJECT NEXT STEPS

The Company continues to evaluate both the Evelyn and Plomo properties of the EP Gold Project with

the objective of advancing prospects and prioritizing drill targets.

The Company will continue to evaluate

mineralized domains at the Pavo Real target, as indicated by mapping and sampling to date, and

anticipates continued exploration to include geological mapping as well as trenching with a mechanical

shovel.

Assays are pending from geological mapping and sampling also recently completed at the

Banco de Oro and La Bonancita targets.

On the Evelyn side, the Company is currently planning a RC

drilling program to follow up on positive soil geochemistry results north and south of the Main Zone a well

as west of El Sahuaro

ABOUT PLOMO

The newly acquired Plomo property is contiguous with the Company's Evelyn Property and collectively

they comprise the Company's EP Gold Project covering a total area of 4,766 Ha.

The EP Gold Project is

located in the 500 km long, northwest trending Caborca Gold belt which includes the > 15 million ounce

La Herradura Mine, located 30 km west of Plomo, the > 2-million-ounce Noche Buena Mine located

approximately 8 km southwest of Plomo, and the past producing Soledad-Dipolos Mine (> 3 Moz Au)

located approximately 32 km to the northwest (see attached map 2).

Highlights of the Plomo Property include:

The historical database, totaling 1,853 surface rock samples, includes 524 samples greater than

0.1 grams per tonne ("g/t") Au, 132 samples greater than 1.0 g/t Au, and 15 high grade samples

greater than 10 g/t Au. Surface exploration including prospecting, mapping, and rock sampling

since 2007 has resulted in the identification of 9 target areas on the Plomo property (see Map 3)

Underground sampling completed in the adit at the Banco de Oro prospect in 2008 are reported to

have included 298.0 g/t Au over a chip length of 2.4 metres

The Plomo property has been the subject of only very limited exploration drilling, completed in

2008, with a total of 1,570 meters completed in 10 holes.

Highlights of the drilling are 0.66 g/t Au

over an intersection length of 11.65 metres ("m") and 0.92 g/t Au over an intersection length of 4 m.

The Plomo property has had small scale artisanal mining including pits, adits, and placer mining

dating back to the 18th century.

The first recorded exploration was in 2006 and the property has

been the subject of only episodic exploration since that time.

Mapping completed by Colibri geologists confirmed vein style mineralization consisting of veins,

veinlets, and vein stockworks, altered host rocks that include intense silicification, sericite,

disseminated pyrite, and locally tourmaline bearing stockworks and breccias.

Sampling by Colibri completed during its due diligence evaluation confirmed the historical

distribution of high-grade samples at Plomo and included twenty-five grab samples with values >

1.0 g/t Au, including 6 samples with values > 5 g/t Au. A total of 62 grab samples taken by Colibri

during due diligence sampling returned Au assay values > 0.1 g/t Au.

Illustration 2:

Location of the Evelyn & Plomo ("EP") properties within Caborca Gold Belt

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/170682_fc47a144841dbaea_002full.jpg

Illustration 3: Evelyn & Plomo Outcrop & Trench Grab Samples

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/170682_fc47a144841dbaea_003full.jpg

QAQC

Assays for the Plomo mapping and sampling program have been completed at ALS Laboratories (ALS)

with sample preparation completed in Hermosillo, Sonora and Atomic Absorption and Fire Assay

analyses completed in Vancouver, Canada. Colibri employs industry standard QAQC protocol including

the use of control samples (Certified Standards and Blanks) and check assays.

Jamie Lavigne, P. Geo

has supervised the drilling program at Evelyn.

QUALIFIED PERSON

Jamie Lavigne, P. Geo and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has

reviewed and approved the technical information in this press release.

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on

acquiring and exploring prospective gold & silver properties in Mexico. The Company holds seven high

potential precious metal projects of which six have planned exploration programs for calendar 2023.

For more information about all Company projects please visit:

www.colibriresource.com

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Notice Regarding Forward-Looking Statements:

This news release contains "forward-looking statements". Statements in this press release which are not

purely historical are forward-looking statements and include any statements regarding beliefs, plans,

expectations or intentions regarding the future. Actual results could differ from those projected in any

forward-looking statements due to numerous factors. These forward-looking statements are made as of

the date of this news release, and the Company assumes no obligation to update the forward-looking

statements, or to update the reasons why actual results could differ from those projected in the forward-

looking statements. Although the Company believes that the plans, expectations, and intentions

contained in this press release are reasonable, there can be no assurance that they will prove to be

accurate.

For information contact: Ronald J. Goguen, President, Chairperson and Director, Tel: (506) 383-4274,

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/170682