Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CBI.V ·

Colibri Partner Reports Drill Results from Five Holes at the Pilar Gold and Silver Project in Sonora

Drill Results

Colibri Partner Reports Drill Results from Five

Holes at the Pilar Gold and Silver Project in

Sonora

Dieppe, New Brunswick--(Newsfile Corp. - July 16, 2024) -

Colibri Resource Corporation (TSXV: CBI)

("Colibri" or the "Company") is pleased to report that the co-owner of its Pilar Gold & Silver Project in

Sonora, Mexico, Tocvan Ventures (51% interest) has announced the results from five holes drilled in the

ongoing Phase 4, RC drill program. Colibri owns a 49% interest of the Pilar Gold & Silver Project.

Tocvan Pilar News Release - July 16

th

, 2024

:

Highlights:

North Hill Trend Drilling Hits Broad Zone of Mineralization Starting from Surface with a

High-Grade Zinc Centre

300-meters East of the Main Zone

JES-24-95, 76.3 meters of 0.2 g/t Au, 1 g/t Ag and 0.4% Zn from 1.5 meters depth

Including, 7.6 meters of 0.2 g/t Au, 3 g/t Ag and 2.8% Zn

And 5.1 meters of 0.8 g/t

Main Zone Eastern Infill Hits Broad Mineralization with Elevated Silver and Zinc

JES-24-94, 24.4 meters of 0.2 g/t Au and 5 g/t Ag from 38.1 meters depth

Including, 1.5 meters of 1.3 g/t Au, 37 g/t Ag, 1.2% Zn and 0.5% Pb

And 1.5 meters of 0.5 g/t Au, 26 g/t Ag and 0.5% Zn

Also 3.1 meters of 0.4 g/t Au, 5 g/t Ag and 0.6% Zn

Five holes Released, All Five Intersect Mineralization

Results Pending for Three (3) Drillholes

Calgary, Alberta – July 16, 2024 –

Tocvan Ventures Corp. (the "

Company

") is pleased to announce

drill results from its 2024 Reverse Circulation (RC) drill program at its road accessible Pilar Gold-Silver

project in mine-friendly Sonora, Mexico.

To date, the 2024 drill program has completed 3,268 meters across 26 drill holes.

Results for three drill

holes are currently pending analysis (green squares on Figure 1).

"Drill results are continuing to show the broad scale of mineralization at Pilar as we push out

the edges of the known deposit." commented Brodie Sutherland, CEO. "The infill drilling looks

to connect each of the three known trends to date, the results tell us that mineralization does

connect across these corridors. Most of the area has never seen detailed drilling and to see

mineralization and alteration in all holes showcases the robust system we have. We are also

seeing areas with elevated base metals indicating multiple phases of gold and silver deposition,

an excellent advantage when expanding and exploring across the greater Pilar area." "The

results today are supporting the case that we are just scratching the surface of the potential at

Pilar. Results for exploration drilling 600 meters south of the Main Zone are still pending and

surface work is ongoing. We look forward to updating our shareholders as more results

become available."

Figure 1. Summary map of drill highlights and surrounding surface results.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/216628_6a5c4adb24859985_001full.jpg

Hole ID

From (m)

To (m)

Width (m)

Precious Metals

Base Metals

Pathfinders

Au (g/t)

Ag (g/t)

Cu (ppm)

Pb (ppm)

Zn (ppm)

As

(ppm)

Mo (ppm)

Sb (ppm)

JES-24-91

3.05

35.08

32.03

0.06

1.19

35

68

591

314

NSV

10

including

3.05

6.10

3.05

0.27

0.43

56

27

654

316

NSV

15

also

32.03

35.08

3.05

0.12

7.15

91

255

1,259

1,307

NSV

19

JES-24-92

21.35

70.15

48.80

0.05

0.85

81

143

431

11

2

NSV

JES-24-93

21.35

111.33

89.98

0.03

2.95

49

43

230

10

2

NSV

including

61.00

91.50

30.50

0.04

5.57

41

26

178

17

2

NSV

including

61.00

74.73

13.73

0.03

9.87

28

41

242

20

NSV

NSV

JES-24-94

38.13

158.60

120.48

0.06

1.72

79

178

877

11

3

NSV

including

38.13

102.18

64.05

0.09

2.89

80

307

1,492

11

4

NSV

including

47.28

71.68

24.40

0.17

5.26

91

691

2,211

15

8

NSV

including

54.90

56.43

1.53

1.26

37.02

566

5,538

11,588

87

109

21

and

70.15

71.68

1.52

0.46

25.82

135

1,291

5,661

NSV

NSV

NSV

and

99.13

102.18

3.05

0.37

4.66

271

80

6,002

36

10

NSV

JES-24-95

1.53

77.78

76.25

0.15

0.88

144

24

4,032

28

15

NSV

including

42.70

59.48

16.78

0.19

1.99

269

31

14,909

47

49

NSV

including

42.70

50.33

7.63

0.16

2.72

400

28

27,879

79

17

NSV

and

65.06

70.15

5.09

0.83

1.38

424

19

1,207

33

NSV

NSV

Table 1. Summary of Drill Results Released Today from Pilar Project.

All interval lengths are drilled widths. 10,000 ppm = 1%. Includes Pathfinder Geochemistry.

Hole ID

Azimuth

Dip

Depth (m)

Easting

Northing

Elevation (m)

JES-24-91

0

-90

100.65

617874

3144532

435

JES-24-92

360

-45

91.50

617526

3144601

436

JES-24-93

0

-90

118.95

617526

3144599

436

JES-24-94

0

-90

170.80

617503

3144502

444

JES-24-95

0

-90

96.08

617731

3144510

430

Table 2. Drillhole locations released today.

Results today highlight five infill drill holes on the Main Zone, North Hill and 4-T trends with the primary

objective to connect each corridor. Detailed results with pathfinder elements are summarized in Table 1.

Discussion of Results

4-T Trend

JES-24-91

JES-24-91 tested within the 4-T trend along the southwestern edge leading towards the North

Hill trend

. The hole was vertical, drilled to a depth of 100.7 meters. Moderate zones of mineralization

were encountered with

elevated zinc and arsenic indicating proximity to higher-grade

mineralization.

The hole returned 32.0 meters of 591 ppm zinc and 314 ppm arsenic with elevated gold

and silver values. As a comparison the bulk sample completed in 2023, returned an average of 400 ppm

zinc. Much of the 4-T trend has only seen wide spaced drill testing to date and remains open.

Main Zone East Infill

JES-24-92, JES-24-93 and JES-24-94

Infill holes JES 24-92 and 93 were drilled off the same pad testing the eastern flank of the Main Zone

trend to see if the neighboring North Hill trend connects. JES-24-92 was drilled to the north at a 45-

degree angle and to depth of 91.5 meters. JES-24-93 was a vertical hole drilled to 119.0 meters.

Anomalous silver and zinc values were recorded along with

alteration and veining indicative of

mineralization within the Main Zone, further evaluation of the eastern flank and its relationship

connecting the North Hill Trend is warranted

. Infill hole JES-24-94 tested a space along the eastern

edge of the Main Zone, a broad anomalous zone of mineralization was recorded along with elevated

silver values. JES-24-94 was a vertical hole drilled to a depth of 170.8 meters.

A 120.5-meter zone of

anomalous gold, silver and zinc was recorded expanding out the eastern side of the Main

Zone.

North Hill Trend

JES-24-95

Infill hole JES-24-95 tested the southern extent of the North Hill Trend. Broad anomalous mineralization

was recorded with high-grade zinc intervals. The hole was vertical and drilled to a depth of 96.1 meters,

with

mineralization recorded over 76.3 meters starting at a depth of 1.5 meters

. A 16.8-meter

zone of higher-grade zinc was recorded, returning

0.2 g/t Au, 2 g/t Ag and 1.5% Zn

. A deeper zone of

gold mineralization returned

5.1 meters of 0.8 g/t Au

. Pathfinder elements arsenic and molybdenite

were also elevated across the hole. The hole is located

65-meters south-southeast of JES-22-63

which returned 67.1 meters of 0.2 g/t Au and 4 g/t Ag, including 13.7-meters of 0.6 g/t Au and 13

g/t Ag and 9.2-meters of 0.6 g/t Au, 3 g/t Ag and 0.6% Zn

. JES-24-95 is also located

65-meters

northwest of JES-22-72 which returned 157.1-meters of 0.1 g/t Au and 4 g/t Ag including 10.7-

meters of 0.6 g/t Au, 40 g/t Ag and 1.7% Zn

. This area of the trend is developing into a sizable

domain with known elevated gold, silver and zinc values.

About the Pilar Property

The Pilar Gold-Silver property has returned some of the regions best drill results. Coupled with

encouraging gold and silver recovery results from metallurgical test work, Pilar is primed to be a

potential near-term producer. Pilar is interpreted as a structurally controlled low-sulphidation epithermal

system hosted in andesite rocks. Initially three primary zones of mineralization were identified on the

original property from historic surface work and drilling and are referred to as the Main Zone, North Hill

and 4-T. Each trend remains open to the southeast and north and new parallel zones have been

discovered. Structural features and zones of mineralization within the structures follow an overall NW-SE

trend of mineralization. Mineralization extends along a 1.2-km trend, only half of that trend has been drill

tested so far.

Pilar Drill Highlights:

2022 Phase III Diamond Drilling Highlights include (

all lengths are drilled thicknesses

):

116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag

108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag

63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag

2021 Phase II RC Drilling Highlights include (

all lengths are drilled thicknesses

):

39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au

47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag

29m @ 0.7 g/t Au

35.1m @ 0.7 g/t Au

2020 Phase I RC Drilling Highlights include (

all lengths are drilled thicknesses

):

94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;

41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;

24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag

15,000m of Historic Core & RC drilling. Highlights include:

61.0m @ 0.8 g/t Au

21.0m @ 38.3 g/t Au and 38 g/t Ag

13.0m @ 9.6 g/t Au

9.0m @ 10.2 g/t Au and 46 g/t Ag

Pilar Bulk Sample Summary:

62% Recovery of Gold Achieved Over 46-day Leaching Period

Head Grade Calculated at

1.9 g/t Au and 7 g/t Ag;

Extracted Grade Calculated at

1.2 g/t Au and

3 g/t Ag

Bulk Sample

Only Included Coarse Fraction

of Material (+3/4" to +1/8")

Fine Fraction (-1/8") Indicates Rapid Recovery with Agitated Leach

Agitated Bottle Roll Test Returned Rapid and High Recovery Results:

80% Recovery of

Gold and 94% Recovery of Silver after Rapid 24-hour Retention Time

Additional Metallurgical Studies:

Gravity Recovery with Agitated Leach Results of Five Composite Samples Returned

95 to 99% Recovery of Gold

73 to 97% Recovery of Silver

Includes the Recovery of

99% Au and 73% Ag from Drill Core Composite at 120-meter

depth.

Quality Assurance / Quality Control

Samples were shipped for sample preparation to ALS Limited in Hermosillo, Sonora, Mexico and for

analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North Vancouver facilities

are ISO 9001 and ISO/IEC 17025 certified. Gold was analyzed using 50-gram nominal weight fire assay

with atomic absorption spectroscopy finish. Over limits for gold (>10 g/t), were analyzed using fire assay

with a gravimetric finish. Silver and other elements were analyzed using a four-acid digestion with an ICP

finish. Over limit analyses for silver (>100 g/t) were re-assayed using an ore-grade four-acid digestion

with ICP-AES finish. Control samples comprising certified reference samples and blank samples were

systematically inserted into the sample stream and analyzed as part of the Company's robust quality

assurance / quality control protocol.

Brodie A. Sutherland, CEO for Tocvan Ventures Corp. and a qualified person ("

QP

") as defined by

Canadian National Instrument 43-101, has reviewed and approved the technical information contained in

this release.

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on

acquiring, exploring, and developing prospective gold & silver properties in Mexico. The Company holds

four high potential precious metal projects: 1) 100% of EP Gold Project in the significant Caborca Gold

Belt which has delivered highly encouraging exploration results and is surround by Mexico's second

largest major producer of gold on four sides, 2) 49% Ownership of the Pilar Gold & Silver Project which

is believed to hold the potential to be a near term producing mine, and 3) two highly prospective interests

in the Sierra Madre (Diamante Gold & Silver Project and Jackie Gold & Silver Project.

For more information about all Company projects please visit:

www.colibriresource.com

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Notice Regarding Forward-Looking Statements:

This news release contains "forward-looking statements". Statements in this press release which are not

purely historical are forward-looking statements and include any statements regarding beliefs, plans,

expectations or intentions regarding the future. Actual results could differ from those projected in any

forward-looking statements due to numerous factors. These forward-looking statements are made as of

the date of this news release, and the Company assumes no obligation to update the forward-looking

statements, or to update the reasons why actual results could differ from those projected in the forward-

looking statements. Although the Company believes that the plans, expectations, and intentions

contained in this press release are reasonable, there can be no assurance that they will prove to be

accurate.

For information contact: Ian McGavney, President, CEO and Director, Tel: (506) 383-4274,

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/216628