Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CBI.V ·

Colibri & Partner Drill 83.5 metres at 1.3 grams per tonne Gold (including 10.3 grams per tonne Gold over 9.7 metres) at El Pilar Gold & Silver Project in Sonora Mexico

Drill Results

Colibri & Partner Drill 83.5 metres at 1.3 grams

per tonne Gold (including 10.3 grams per

tonne Gold over 9.7 metres) at El Pilar Gold &

Silver Project in Sonora Mexico

Dieppe, New Brunswick--(Newsfile Corp. - March 11, 2025) - Colibri Resource Corporation (TSXV: CBI)

("Colibri" or the "Company") is pleased to share the assay results from the first two holes drilled in its

recent 10 hole diamond drilling program (1,167.5 metres) at the El Pilar Gold & Silver Project in Sonora

Mexico. Colibri holds 49% interest of the El Pilar along side its partner Tocvan Ventures, which holds a

51% ownership in this advanced stage exploration project. Tocvan is the operator of the El Pilar.

"We are very pleased with the results from these first two drill holes. The near surface nature of

this additional higher-grade mineralization only strengthens our belief that the El Pilar could

become a profitable near-term gold and silver production asset for Colibri. The work programs

planned for Pilar this year, which includes an up to 50,000 tonne bulk sample/test mine and a

maiden resource estimate, should further demonstrate this theory. We look forward to releasing

the results from the additional 8 holes of this program in due course as data is received from the

operator."

commented, Colibri President & CEO Ian McGavney.

Figure 1: Planview of Main Zone Area - today's results highlighted in red. Intervals reported are drilled

lengths, the Company will update on estimated true thickness once all new drill data has been

processed.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/244087_6a252dcde4829ad0_001full.jpg

Photo 1: High-grade core from hole JES-25-104 (1.6m of 60.6 g/t Au + 13 g/t Ag - from 87.8m). Local

faulting and associated intense hematite and silica alteration have replaced the original andesite.

This style of mineralization has been recorded across the Main Zone at surface and in drill core.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/244087_6a252dcde4829ad0_002full.jpg

Tocvan - News Release - March 11

th

, 2025

Highlights:

Highest Gold Grade Result Since Prospect Discovery in 1996

10.3 g/t Au Over 9.7m, including 1.6m of 60.6 g/t Au (Hole JES-25-104)

Only surpassed by Historic Drill Hole S-10, 16.5 meters of 53 g/t Au (1996

Discovery) *

Anomalous Mineralization from

14.1 to 97.6 meters averaging 1.3 g/t Au

Next to Trench Opened in 2023 for Bulk Sample Material

Surface Channels Averaged, 1.9 g/t Au and 9 g/t Ag over 14m (TR-2023-03)

Northwestern Hole JES-25-103, returns 3.7 meters of 0.4 g/t Au, 39 g/t Ag and 2.6% Cu

Anomalous Mineralization from 19.7 to 54.4 meters averaging 0.1 g/t Au, 8 g/t Ag and

0.54% Cu

Tocvan Ventures Corp. (CSE: TOC) (OTCQB: TCVNF) (WKN: TV3/A2PE64)

(the "

Company

"), is

pleased to announce results from the first two core holes recently drilled at the Gran Pilar Gold Silver

Project in mine-friendly Sonora, Mexico. Ten core drillholes totalling 1,167.5 meters were completed

earlier this year within the majority owned (51%) Main Zone held in partnership with Colibri Resource

Corp. Results are highlighted by

10.3 g/t Au over 9.7m, including 60.6 g/t Au over 1.6 meters

starting at 87.8 meters vertical depth

(JES-25-104). The high-grade mineralization

correlates with

at surface mineralization

and lies within a broader anomalous zone drilled that

averages 1.3 g/t Au

over 83.5 meters from 14.1 meters below surface

. In 2023, a trench exposed material adjacent to the

drill hole that

averaged 1.9 g/t Au and 9 g/t Ag over 14m

. Material from the trench was used in the

2023 Bulk Sample completed by Tocvan. JES-25-104 is also on the same section as RC hole, JES-20-

36 (

24.4m of 2.5 g/t Au and 73 g/t Ag, including 1.5 m of 33.4 g/t Au and 1,090 g/t Ag

) and later

core hole JES-22-58 (

21.7m of 0.9 g/t Au, including 4.0m of 4.2 g/t Au

). The highest-grade

mineralization intersected is related to a fault structure known to host high grade gold and silver. The

result is the

highest gold value recorded since initial discovery drilling was completed in 1996

by

Lundin controlled company, Santa Catalina Mining Corp., where

historic hole S-10 returned 53 g/t Au

over 16.5 meters

(*as reported July 30, 1996 by Santa Catalina Ming Corp.). Further to the northwest,

145 meters, core hole JES-25-103, returned anomalous gold, silver and copper averaging

0.1 g/t Au, 8

g/t Ag and 0.54% Cu over 34.7 meters

starting from 19.7 meters downhole. A higher grade zone

averages

3.7 meters of 0.4 g/t Au, 39 g/t Ag and 2.6% Cu

. Elevated copper values are consistent with

results recorded in the North Hill area and seen in trench exposures that may be related to granitoid

intrusive rocks first recorded in recent RC drilling further north.

"These near-surface high-grade results showcase the rapid development potential of Pilar."

commented, CEO Brodie Sutherland. "Core drilling has again yielded some of the best results

ever from the property. Results are in line with our initial observations of key styles of

significant mineralization. The very high-grade interval in JES-25-104 coincides with a fault and

adjacent intense, texture destructive hematite and silica alteration. Understanding these high-

grade structures is essential for upgrading resource potential and identifying areas of focus for

initial mining. Further to the north, hole JES-25-103 has yielded some of the best results to date

on the northwestern edge of the Main Zone where surface mapping has outlined key controlling

structures with elevated copper and silver. We look forward to sharing the remaining drill results

as they become available."

Hole ID

From (m)

To (m)

Interval (m)

Au (g/t)

Ag (g/t)

Cu (%)

JES-25-103

19.70

29.30

9.60

0.15

11.64

0.90

and

50.70

54.40

3.70

0.40

38.80

2.56

within

19.70

54.40

34.70

0.09

7.73

0.54

JES-25-104

87.83

97.55

9.72

10.31

4.85

NSV

Including

87.83

89.45

1.62

60.6

13.30

NSV

and

23.25

54.00

30.75

0.14

1.21

NSV

within

14.10

97.55

83.45

1.27

1.24

NSV

Table 1: Summary of Drill Results in this release

Hole ID

Easting

Northing

Elevation (m)

Depth (m)

Azimuth

Dip

JES-25-103

617328

3144754

388.55

80.50

055

-70

JES-25-104

617414

3144638

399.75

103.60

-

-90

Table 2. Summary of drill collar locations and orientations. Coordinates are in UTM NAD 27, Zone

12N

Pilar Drill Highlights:

2024 RC Drilling Highlights include (

all lengths are drilled thicknesses

):

42.7m @ 1.0 g/t Au, including 3.1m @ 10.9 g/t Au

56.4m @ 1.0 g/t Au, including 3.1m @ 14.7 g/t Au

16.8m @ 0.8 g/t Au and 19 g/t Ag

2022 Phase III Diamond Drilling Highlights include (

all lengths are drilled thicknesses

):

116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag

108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag

63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag

2021 Phase II RC Drilling Highlights include (

all lengths are drilled thicknesses

):

39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au

47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag

29m @ 0.7 g/t Au

35.1m @ 0.7 g/t Au

2020 Phase I RC Drilling Highlights include (

all lengths are drilled thicknesses

):

94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;

41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;

24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag

15,000m of Historic Core & RC drilling. Highlights include:

61.0m @ 0.8 g/t Au

21.0m @ 38.3 g/t Au and 38 g/t Ag

13.0m @ 9.6 g/t Au

9.0m @ 10.2 g/t Au and 46 g/t Ag

Pilar Bulk Sample Summary:

62% Recovery of Gold Achieved Over 46-day Leaching Period

Head Grade Calculated at

1.9 g/t Au and 7 g/t Ag;

Extracted Grade Calculated at

1.2 g/t Au and

3 g/t Ag

Bulk Sample

Only Included Coarse Fraction

of Material (+3/4" to +1/8")

Fine Fraction (-1/8") Indicates Rapid Recovery with Agitated Leach

Agitated Bottle Roll Test Returned Rapid and High Recovery Results:

80% Recovery of

Gold and 94% Recovery of Silver after Rapid 24-hour Retention Time

Additional Metallurgical Studies:

Gravity Recovery with Agitated Leach Results of Five Composite Samples Returned

95 to 99% Recovery of Gold

73 to 97% Recovery of Silver

Includes the Recovery of

99% Au and 73% Ag from Drill Core Composite at 120-meter

depth.

Based on management's strong belief in the project's potential, the Company is outlining a permitting

and operations strategy for a pilot facility at Pilar. The facility would underpin a robust test mine scenario

with aims to process up to 50,000 tonnes of material. Timelines and budget are being prepared with the

aim of moving forward with the development early in 2025. With gold prices hitting all-time highs, the

Company believes the onsite test mine will provide key economic parameters and showcase the mineral

potential of the area. In 2023, the Company completed an offsite bulk sample that produced important

data showcasing the potential to recover both gold and silver through a variety of methods including

heap leach, gravity and agitated leach (see August 22, 2023, news release for more details).

Quality Assurance / Quality Control

Rock and Drill samples were shipped for sample preparation to ALS Limited in Hermosillo, Sonora,

Mexico and for analysis at the ALS laboratory in North Vancouver. The ALS Hermosillo and North

Vancouver facilities are ISO 9001 and ISO/IEC 17025 certified. Gold was analyzed using 50-gram

nominal weight fire assay with atomic absorption spectroscopy finish. Over limits for gold (>10 g/t), were

analyzed using fire assay with a gravimetric finish. Silver and other elements were analyzed using a four-

acid digestion with an ICP finish. Over limit analyses for silver (>100 g/t) were re-assayed using an ore-

grade four-acid digestion with ICP-AES finish. Control samples comprising certified reference samples

and blank samples were systematically inserted into the sample stream and analyzed as part of the

Company's robust quality assurance / quality control protocol.

Brodie A. Sutherland, CEO for Tocvan Ventures Corp. and a qualified person ("

QP

") as defined by

Canadian National Instrument 43-101, has reviewed and approved the technical information contained in

this release.

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on

acquiring, exploring, and developing prospective gold & silver properties in Mexico. The Company holds

four high potential precious metal projects: 1) 49% Ownership of the Pilar Gold & Silver Project which is

believed to hold the potential to be a near term producing mine, 2) 100% of EP Gold Project in the

significant Caborca Gold Belt which has delivered highly encouraging exploration results and is surround

by Mexico's second largest major producer of gold on four sides, and 3) two highly prospective interests

in the Sierra Madre (Diamante Gold & Silver Project and Jackie Gold & Silver Project.

For more information about all Company projects please visit:

www.colibriresource.com

.

Contact

:

Ian McGavney, President, CEO and Director

Tel: (506) 383-4274

[email protected]

Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this news release.

No stock exchange, securities commission or other regulatory authority has approved or disapproved

the information contained herein. This news release includes certain "forward-looking statements".

These statements are based on information currently available to the Company and the Company

provides no assurance that actual results will meet management's expectations. Forward- looking

statements include estimates and statements that describe the Company's future plans, objectives or

goals, including words to the effect that the Company or management expects a stated condition or

result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates",

"expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are

based on assumptions and address future events and conditions, by their very nature they involve

inherent risks and uncertainties. Actual results relating to, among other things, results of exploration,

project development, reclamation and capital costs of the Company's mineral properties, and the

Company's financial condition and prospects, could differ materially from those currently anticipated in

such statements for many reasons such as: changes in general economic conditions and conditions in

the financial markets; changes in demand and prices for minerals; litigation, legislative, environmental

and other judicial, regulatory, political and competitive developments; technological and operational

difficulties encountered in connection with the activities of the Company; and other matters discussed in

this news release. This list is not exhaustive of the factors that may affect any of the Company's forward-

looking statements. These and other factors should be considered carefully, and readers should not

place undue reliance on the Company's forward-looking statements. The Company does not undertake

to update any forward-looking statement that may be made from time to time by the Company or on its

behalf, except in accordance with applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/244087