Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CBI.V ·

Colibri and Its Option Partner Drills 9 Metres at 2.48 gpt Au plus 56.7 gpt Ag at La Prieta Target

Drill Results

Colibri and Its Option Partner Drills 9 Metres

at 2.48 gpt Au plus 56.7 gpt Ag at La Prieta

Target

Dieppe, New Brunswick--(Newsfile Corp. - September 29, 2022) - Colibri Resource Corporation (TSXV:

CBI) ("Colibri" or the "Company") is pleased to report assay results received its from option partner

Silver Spruce Resources Inc. ("Silver Spruce") from drilling at La Prieta target on the Diamante

Epithermal polymetallic property, southeastern Sonora, Mexico.

Highlights of the results include:

An intersection of 2.48 grams per tonne ("g/t") Au and 56.7 g/t Ag over an intersection

length of 9.0 metres ("m")

An intersection of 1.76% Zn + 38.5 g/t Ag and 0.56 g/t Au over an intersection length of

13.5 m

An intersection of 1.61% Zn + 38.5 g/t Ag and 0.63 g/t Au over an intersection length of

10.5 m

During the period June 16 to July 12, 2022 Colibri's and its option partner Silver Spruce completed a

total of 2,006 metres of reverse circulation ("RC") drilling in 19 holes on the Diamante property.

The

drilling represents the first known drilling on the property.

Two targets were tested; 1,065 m were drilled

in 9 holes at El Pillado and 10 holes totaling 941 m were drilled at La Prieta.

Results from the El Pillado

target have been previously released (see Colibri news release date September 7, 2022) which

included 5.56% Zn, 1.76% Pb, 107.35 g/t Ag, and 0.16 g/t Au over an intersection length of 6 m.

La Prieta and El Pillado targets are interpreted as vein and stockwork style, intermediate sulphidation

epithermal mineralization.

The primary metals of interest are Zn, Pb, Ag, and Au and the mineralized

zones at both La Prieta and El Pillado are associated with elevated As, Sb, Hg, Cd, and Bi abundances,

which is typical of the epithermal style of mineralization.

The drilling at La Prieta targeted a southwest

striking, steeply northwest dipping vein and vein splay structure.

A total of 10 holes were drilled along the

structure (see map).

All holes intersected mineralization with intersection lengths ranging from 1.5 m to

13.5 m and with variable metal abundances and ratios.

The highest-grade samples returned from La

Prieta drilling include 12.75% Zn, 5.6 % Pb, 239 g/t Ag, and 5.62 g/t Au.

Significant intercepts of La

Prieta drilling are summarized in Table 1.

Hole ID

From

To

Length

Au (g/t)

Ag (g/t)

Zn (%)

Pb (%)

Ag Eq (g/t)*

Au Eq (g/t)*

DIA22-10

48.0

54.0

6.0

0.46

56.88

1.06

0.53

165.47

1.86

includes

49.5

51.0

1.5

0.87

125.00

2.82

1.45

383.75

4.31

DIA22-11

54.0

55.5

1.5

0.15

4.50

0.16

0.09

28.25

0.32

DIA22-12

51.0

52.5

1.5

0.18

4.80

0.22

0.08

33.71

0.38

DIA22-13

49.5

51.0

1.5

0.31

53.70

1.49

0.39

165.09

1.85

DIA22-14

52.5

55.5

3.0

0.59

16.50

0.46

0.23

98.14

1.10

DIA22-15

36.0

37.5

1.5

0.54

0.25

0.01

0.00

48.70

0.55

DIA22-16

1.5

10.5

9.0

2.48

56.70

0.28

0.71

312.84

3.51

includes

1.5

6.0

4.5

3.87

75.43

0.08

0.97

453.26

5.09

DIA22-16

18.0

19.5

1.5

0.83

18.80

0.68

0.38

136.90

1.54

DIA22-16

36.0

46.5

10.5

0.63

38.49

1.61

0.64

192.52

2.16

includes

37.5

39.0

1.5

1.36

139.00

8.74

2.88

772.12

8.67

Hole ID

From

To

Length

Au (g/t)

Ag (g/t)

Zn (%)

Pb (%)

Ag Eq (g/t)*

Au Eq (g/t)*

DIA22-17

30.0

43.5

13.5

0.56

38.48

1.76

0.76

196.95

2.21

includes

30.0

34.5

4.5

0.94

103.17

4.96

2.19

494.61

5.56

DIA22-17

54.0

57.0

3.0

0.45

1.35

0.04

0.00

43.14

0.48

DIA22-17

72.0

75.0

3.0

0.26

18.65

0.15

0.07

51.50

0.58

DIA22-18

33.0

42.0

9.0

0.55

15.28

0.38

0.16

87.76

0.99

includes

37.5

40.5

3.0

1.07

38.80

0.63

0.35

175.81

1.98

DIA22-18

48.0

51.0

3.0

0.48

11.35

0.08

0.03

59.14

0.66

DIA22-19

10.5

13.5

3.0

1.36

86.80

1.69

0.91

317.91

3.57

includes

12.0

13.5

1.5

2.11

139.00

2.79

1.24

500.06

5.62

DIA22-19

39.0

45.0

6.0

0.64

11.20

0.31

0.21

89.84

1.01

DIA22-19

48.0

49.5

1.5

0.32

7.60

0.24

0.16

52.76

0.59

*Au and Ag equivalents were calculated using metal prices of US$1660 per ounce Au, US$18.65 per ounce Ag, US$1.32 per pound Zn, and US$0.83

per pound Pb

Lengths are intersection length.

True widths are not known.

Table 1: La Prieta - Select Drilling Results

Ron Goguen, President & CEO of Colibri commented

"We are very pleased with the work

completed and the results of this first ever drill program on the Diamante Property. The results

clearly demonstrate the potential for epithermal mineralization on the property and when

combined with our adjacent Jackie and Mezquite properties provides a very significant regional

scale land package for the exploration and discovery of precious and base metal

mineralization."

Figure 1 - La Prieta Target Area - Diamante Project

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4269/138860_c9c367bd142629c0_001full.jpg

ABOUT THE DIAMANTE PROPERTY

The Diamante property is located within a belt of Epithermal Au-Au mineralization hosted by the Sierra

Madre Occidental Volcanic Complex.

Major gold mining operations in the area of the Diamante property

include Alamos Golds' Los Mulatos Mine and Agnico Eagles' El India and Pinos Altos Mines.

The

Diamante project is located approximately 12km km northeast of

Minera Alamos

' Santana Au

development project which is anticipated to commence commercial production within the next quarter.

The Property is located approximately 170 km southeast of Sonora state capital Hermosillo and

approximately 10 km northwest of the town of Tepoca.

The property is accessed directly from Sonora

state Highway 16.

The 1,057-hectare Diamante property is located adjacent to the Company's Mezquite and Jackie

properties which cover 180 and 1113 hectares respectively providing the company with a total of 2,351

hectares of exploration ground.

Drilling results at El Mezquite in 2021, located approximately 1.5km from

El Pillado, include 0.83 g/t Au over an intersection length of 3.0 m and 2.95% Zn over an intersection

length of 1.5 m. The Diamante property hosts a number of historical showings and combined with

mineralization on the Mezquite and Jackie properties exhibit the geological characteristics of epithermal

low to intermediate sulfidation Ag-Au (Pb-Zn), high sulfidation Au-Cu, and potential transition zones

within and peripheral to porphyry style Au-Cu defined within the system of Sillitoe (2010).

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on

acquiring and exploring prospective gold & silver properties in Mexico. The Company has six exploration

projects of which five currently have exploration programs being executed in 2022. (1) The flagship

Evelyn Gold Project

is 100% owned and explored by Colibri, (2) the

Pilar Gold & Silver Project

(optioned to

Tocvan Ventures- (CSE: TOC

), (3) the

El Mezquite Gold & Silver Project

, (4) the

Jackie

Gold & Silver Project, and (5) the Diamante Gold & Silver Project.

3,4, and 5 are subject to earn-in

agreements by

Silver Spruce Resources - TSXV: SSE

).

For more information about all Company projects please visit:

www.colibriresource.com

.

QUALIFIED PERSON

Jamie Lavigne, P. Geo and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has

reviewed and approved the technical information in this press release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Notice Regarding Forward-Looking Statements:

This news release contains "forward-looking statements". Statements in this press release which are not

purely historical are forward-looking statements and include any statements regarding beliefs, plans,

expectations or intentions regarding the future. Actual results could differ from those projected in any

forward-looking statements due to numerous factors. These forward-looking statements are made as of

the date of this news release, and the Company assumes no obligation to update the forward-looking

statements, or to update the reasons why actual results could differ from those projected in the forward-

looking statements. Although the Company believes that the plans, expectations and intentions

contained in this press release are reasonable, there can be no assurance that they will prove to be

accurate.

For information contact: Ronald J. Goguen, President, Chairperson and Director, Tel: (506) 383-4274,

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/138860