Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CATX.V ·

Smooth Rock Reports Initial Prospecting Results from the Chucker Project

Sampling & Geoscience Results

Smooth Rock Reports Initial Prospecting Results from

the Chucker Project

Vancouver, British Columbia--(Newsfile Corp. - August 8, 2019) -

Smooth Rock Ventures Corp

.

(

TSXV

: SOCK)

("

Smooth

Rock

" or the "

Company

") is pleased to announce initial prospecting results from Phase 1 of the Chucker Project's summer

exploration program. The Chucker Project is located in the Silver Star Mining District, within Mineral County, Nevada, in the

Walker Lane gold trend.

Initial prospecting of the Chucker Project by the Company returned up to 44.6 g/t Au from a mine dump. A total of 10 samples

were collected from outcrops and mine dumps. These samples focused on mineralized shear zones and associated quartz

veins, the results are detailed in Table 1.

Table 1.

Preliminary Prospecting Results.

Sample

Number

Material

Au

g/t

Ag

g/t

Cu

ppm

Zn

ppm

Pb

ppm

U

ppm

CH-1

Outcrop

5.630

7.3

169

723

1494

103

CH-2

Outcrop

0.117

2.6

20

302

691

37

CH-3

Outcrop

0.183

1.4

12

311

207

30

CH-4

Outcrop

0.196

0.7

15

185

60

30

CH-5

Outcrop

0.313

0.0

7

29

29

29

CH-6

Outcrop

0.097

0.7

12

63

48

44

CH-7

Mine Dump

44.600

>100

2544

2470

25800

480

CH-8

Mine Dump

0.193

5.4

97

297

764

33

CH-9

Outcrop

0.205

2.0

61

205

235

75

CH-10

Outcrop

0.118

0.6

13

300

305

30

The initial pass of sampling and mapping was conducted in early July 2019 to confirmed previous rock chip assays taken in

2011 by an previous lease holder. As shown in the table above high-grade gold and associated metals exist on the Chucker

property. In addition, past exploration is limited to several very old historical 2-inch diameter drill holes evidenced by drill casing

sticking out of the ground, no drill hole assays have been found. Significant historical mining consists of shafts, drifts, open cuts

and prospect pits. Further results will be released as they become available.

Phase I of the exploration program on the Chucker Project consists of reconnaissance prospecting, geological mapping, surface

trenching, sampling and relocating historical workings. This reconnaissance program will provide accurate modern data to

assist in the planning of the Phase II drill program. Phase I is expected to be completed shortly. The Phase II drill program is

expected to begin in September, following the compilation of the Phase I results and pending receipt of an exploration drilling

permit from the U.S. Bureau of Land Management (the "BLM").

The 100% owned Chucker Project is located in the Silver Star Mining District, within Mineral County, Nevada, in the Walker Lane

gold trend. The Project consists of 28 unpatented mining claims with a combined area of 226 hectares (560 acres) that covers

numerous prospect pits and past producing small scale high grade gold mines. Several altered and mineralized shear zones

with metal rich quartz veins are exposed on the surface.

The property also contains a surface exposure of the range front fault which was historically mined from a shaft. The Chucker

Project is located within the intersection of the Walker Lane shear zone and associated Mina Deflection of the Walker Lane. This

combination creates major fault zones or conduits for ascending mineralized solutions. From observation and historic assay

values, gold, silver, lead, zinc and copper are found in amounts that demonstrate significant potential for exploration. There is no

evidence of modern-day exploration or drilling on the property.

The Chucker Project is located 60 miles southeast of Hawthorne, Nevada or 5 miles southwest of Marietta, Nevada, easily

accessible via state and secondary roads with year-round access. The Chucker Project is located in close proximity to past

producing mines such as Marietta Mines, Moho, and Camp Douglas. The core portion of the property has been held by private

interests for over 40 years.

The scientific and technical content and interpretations contained in this news release have been reviewed, verified and

approved by E. Gauthier, geol., Eng (OIQ), a consultant of the Company, and an independent Qualified Person as defined by NI

43-101, Standards of Disclosure for Mineral Projects.

ON BEHALF OF THE BOARD

"Jeffrey Cocks"

Jeffrey Cocks

President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT

: Smooth Rock Ventures Corp.

(TEL)- (888) 909-5548, (FAX)-(888) 909-1033

Email:

[email protected]

Website:

www.smoothrockventures.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/46786