Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CAT.CN ·

Metallurgical Test Work From Kamativi Tailings Project

Metallurgy & Processing

202 – 905 West Broadway, Vancouver, BC V5Z 4M3

CSE – CAT

FOR IMMEDIATE RELEASE

CHIMATA GOLD CORP COMMENCES DENSE MEDIA SEPARATION

METALLURGICAL TESTWORK ON BULK SAMPLE FROM KAMATIVI TAILINGS

LITHIUM PROJECT

Vancouver, BC September 18, 2018 – Canadian strategic metals company Chimata Gold Corp.

(CSE: CAT) (“Chimata” or the “ Company”) announces that it has commenced a Dense Media

Separation Metallurgical Test Work scoping program on a 7.5 tonne bulk sample grading 0,88%

Li2O generated from its flagship Kamativi Tailings Lithium Project.

Chimata is pleased to announce the appointment of Mintek (Pty) Ltd, South Africa’s national

mineral research organisation, to conduct Dense Media Separation (“DMS”) test work on a 7.5

tonne bulk sample of tailings collected from its Kamativi Lithium Tailings Project (the “Project”) in

Zimbabwe. The sample was collected from a series of 10 pits excavated from an area within the

eastern portion of the historical Tailings Storage Facility. Composite assays indicate a head feed

grade for the bulk sample of 0,88% Li2O.

The testwork program will consist of the following stages:

• Head Feed ClassificationBulk Feed

Screening

• Cross Flow Classifier Test Work

• Pilot Scale DMS Test Work

• Magnetic Separation Test Work • Concentrate Production

Figure 1 - Dense Media Pilot Plant at Mintek Laboratories

202 – 905 West Broadway, Vancouver, BC V5Z 4M3

CSE – CAT

As part of the bulk test work program CAT is pleased to announce the appointment of MinMet

Projects (Pty) Ltd (“ MinMet”) and Cronimet Mining Processing SA (Pty) Ltd (“ CMPSA”) as

Metallurgical and Mineral Processing consultants to provide advisory services and oversight

during the test work program. Results from the program are expected to be finalised during

October.

MinMet have been appointed as expert consultants for the ongoing test work with a view, upon

success of the test work, to engaging with MinMet for the design, engineering and construction of

a Phase 1 DMS Plant. MinMet have completed work on the design and upgrade of Galaxy

Resources Limited’s Mt Cattlin DMS. MinMet has recently secured an agreement with the Primero

Group (Pty) Ltd to supply D MS Processing plants and equipment into Australia and America.

MinMet have also successfully designed, supplied and completed, for the Primero Group in

Australia, two spodumene DMS Plants, Tawana Resources NL’s Bald Hill Project and Pilbara

Minerals (Ltd) Pilgangoora Project.

MinMet have completed work in Zimbabwe for Bikita Minerals, a long time Zimbabwean lithium

concentrate producer. MinMet are aware of the local requirements for Zimbabwe and have a good

understanding of the Zimbabwe operating environment.

Chimata and its local partners are looking forward to further developing this relationship with an

experienced and professional team that have been actively involved in the development of DMS

processing plants for world class projects. More informati on on MinMet can be found on their

website: http://minmetprojects.co.za/

CRONIMET Mining Processing SA (Pty) Ltd (“ CMPSA”) is a company that focuses on the

processing of tailings and low-grade stockpiles around the world using a combination of classic

and niche mineral processing technologies. CMPSA forms part of the CRONIMET Mining Group,

a multi-national corporation. CMPSA will be providing technical and metallurgical consultancy

services to this project and will work as client representatives in South Africa with a view to

streamlining the development of this project and interacting with the various contractors,

consultants and engineering service providers based in South Africa. For more information on

CMPSA, please see the link to their website: http://www.cronimet-

mining.com/en/processing/who-we-are/

Mintek is the national mineral research organisation for South Africa and is one of the world

leading technology organisations that specialises in mineral processing, extractive metallurgy and

other related areas. For more information on Mintek, please see their website at:

http://www.mintek.co.za/

John McTaggart, Managing Director of Jimbata (Pvt) Ltd (“ Jimbata”) commented “the

appointments of Mintek , Min Met and CPMSA demonstrates our commitment to ensuring the

successful implementation of this project. It is pleasing to note that both MinMet and CMPSA have

operated in various capacities in Zimbabwe.”

Alain Moreau, a “qualified person” as defined by NI 43-101 – Standards of Disclosure for Mineral

Projects has approved the scientific and technical disclosure in this press release.

202 – 905 West Broadway, Vancouver, BC V5Z 4M3

CSE – CAT

ON BEHALF OF THE BOARD

Richard Groome

Chairman and Interim President and CEO

Further information regarding the Company can be found on SEDAR at www.SEDAR.com, or by

contacting the Company directly at (604) 674-3145.

This news release may contain forward looking statements. Forward Looking statements address

future events and conditions and therefore involve inherent risks and uncertainties. Actual results

may differ materially from those currently anticipated in such statements. Particular risks

applicable to this press release include risks associated with planned production, including the

ability of the company to achieve its targeted production outline due to regulatory, technical or

economic factors. In addition, there are risks associated with estimates of resources, and there is

no guarantee that a resource will have demonstrated economic viability as necessary to be

classified as a reserve. There is no guarantee that additional exploration work will result in

significant increases to resource estimates

Neither THE CSE nor its Regulation Services Provider accepts responsibility for the adequacy or

accuracy of this release.

We seek safe harbour