Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CAPT.V ·

Capitan Mining Expands Known Gold Mineralization at the Penoles Gold Project in Durango, Mexico; Drills 45.7 Metres of 0.63 g/t Gold Within Larger Interval of 111.3 Metres of 0.34 g/t Gold

Drill Results

Capitan Mining Expands Known Gold

Mineralization at the Penoles Gold Project in

Durango, Mexico; Drills 45.7 Metres of 0.63 g/t

Gold Within Larger Interval of 111.3 Metres of

0.34 g/t Gold

Vancouver, British Columbia--(Newsfile Corp. - November 30, 2020) -

Capitan Mining Inc.

(TSXV:

CAPT)

("Capitan" or the "Company")

is pleased to report results for the first seven drill holes from the

current and on-going 6,000 metre reverse circulation (RC) drill program at the Peñoles Project (the

"Project") in Durango, Mexico. This initial drill campaign is focused on testing the continuity of known

gold-silver zones at the Capitan Hill Deposit, both along strike and down-dip of the March 2015, 43-101

compliant, inferred resource outline, as well as infill significant gaps within the resource model. The first

seven drill holes of the program are presented herein, all of which intersected Capitan Hill style

mineralization that is consistent in grade and width with previous drilling.

Drill Highlights:

RC Hole (20-CARC-06):

intersected

45.7 m of 0.63 g/t gold

within a larger interval of

111.3 m of

0.34 g/t gold;

RC Hole (20-CARC-05):

intersected

76.2 m of 0.41 g/t gold and 21 g/t silver

including

16.8 m

of 0.68 g/t gold and 28.5 g/t silver;

RC Hole (20-CARC-03):

intersected

68.6 m of 0.4 g/t gold and 11 g/t silver

including

16.8 m of

0.74 g/t gold and 15.9 g/t silver;

RC Hole (20-CARC-02):

intersected

56 m of 0.4 g/t gold

including

25.9 m of 0.53 g/t gold;

New

gold zones discovered

in the hanging wall of Capitan Main zone, that provide an

additional, near surface

opportunity to expand

the March 2015 resource

within the

conceptual, open-pit shell;

Drill results support management's view that there

is significant room to expand

the existing

oxide resource;

Drilling is ongoing and the company anticipates completion of the 6,000 meter RC drill program in

March/April 2021.

Capitan's CEO, Alberto Orozco, stated:

"We are very excited to receive the first batch of drill hole

assays from our program on Capitan Hill at the Peñoles Project. This first batch of drill holes

demonstrates strong continuity of gold-silver mineralization, particularly down- and up-dip; and they

are also showing silver mineralization at depth to be more significant than previously thought. Drill

hole 20-CARC-05 had a wider and richer intercept of silver mineralization than we had anticipated,

demonstrating there is still much more to understand about the potential of the mineralization at

Capitan Hill. It is important for Capitan Mining to be delivering on its program as scheduled; from the

permitting stage to the commencement of our drill program, and to provide steady news flow as

promised. We will continue working through the end of the year to complete the remaining of our

planned 3,000 metres of drilling, which will be followed by an additional 3,000 metres of drilling in

early 2021."

Figure 1: Fall/Winter 2020 Drill Program Map at the Capitan Hill Target

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/7373/69142_1f2f70548410cabc_002full.jpg

Expansion Drilling, Capitan Main Zone

RC holes 20-CARC-01, 03, and 05 located on sections 100, 400, and 250 respectively, tested the

continuity of the gold-silver mineralization down dip of the 2015 Inferred Resource (See drill results in

Table 1

and

Figure 1

for plan map).

All of the RC drill holes above successfully intersected the Capitan Hill Main Zone, with results being

consistent with the grade and width of the previous drilling. These new holes extended the Capitan Hill

Main gold-silver mineralization down-dip between 50 to 120 m. Drill results include 76.2 m of 0.41 g/t

gold in hole 20-CARC-05, 68.58 m of 0.4 g/t gold in hole 20-CARC-03 and 51 m of 0.439 g/t gold in hole

20-CARC-01.

Click here for link to cross-sections

.

RC Hole 20-CARC-01, located on section 100, collared near the eastern edge of the Capitan Hill Main

Zone (see

Figure 1

). The hole was mineralized through its entire length starting from surface and was

ended in mineralization. This hole extended the Capitan Hill Main Zone by 120 m down dip from previous

drilling.

In addition to intersecting the Capitan Hill Main Zone, RC holes 20-CARC-05 and 20-CARC-03, also cut

significant values of silver mineralization, expanding the continuity of silver mineralization at depth. Silver

values in RC hole 20-CARC-05 include 60.96 m of 25.15 g/t silver that includes a higher-grade zone of

33.5 m of 33.67 g/t silver.

All of the expansion holes were oxidized through their entire length, with RC holes 20-CARC-01 and 03

getting into sulphide mineralization at drill hole depths of 173.7 m and 184.4 m respectively.

Infill Drilling, Capitan Main Zone

Infill drilling in the current program was designed to confirm the presence of the Capitan Hill Main zone in

areas where significant gaps (75-100 m ) existed in the 2015 Inferred Resource model. All holes

presented below successfully confirmed the presence of the Capitan Hill Main

Zone.

RC hole 20-CARC-06 was drilled on section 250 and was designed to test a roughly 100-metre wide

gap between previously drilled diamond drill holes CDDH-12-10 and CDDH-08-02 (See

Figure 1

). Hole

20-CARC-06 intersected the main Capitan Hill Zone from 35.1 m to 146 m, with a total drilled width of

111.25 m grading 0.342 g/t gold, including 45.7 m of 0.626 g/t gold. (See

Table 1

)

RC Hole 20-CARC-07 was drilled on section 300, between previously drilled diamond drill holes CDDH-

08-05 and CDDH-12-12 to infill a large >100 m wide gap. The hole cut the main mineralized zone in

three, narrowly separated, intercepts that are bound by anomalous gold mineralization. These include

22.9 m of 0.2 g/t gold, 35.1 m of 0.27 g/t gold and 50.3 m of 0.22 g/t gold. The hole bottomed in

anomalous mineralization and could not be drilled to its completed depth due to technical issues.

RC Hole 20-CARC-02 was drilled on section 000 and designed to test a >100 m wide gap between

CDDH-12-17 and surface. The hole successfully intersected the Capitan Hill Main Zone and confirmed

its presence up-dip, to surface, and was mineralized almost over its entire length. Significant values

include 0.284 g/t gold over 29 m and 56.4 m of 0.398 g/t gold.

New, Near Surface Hanging Wall Gold Zones

Drilling prior to the March 2015 resource statement at Capitan Hill indicated the possibility of additional

zones of oxidized, gold-silver mineralization located in the hanging wall to the

Capitan Hill Main Zone.

However, due to a lack of drilling, the significance of these zones was poorly understood and precluded

from being captured in the March 2015 resource estimate.

In the current program, RC holes 20-CARC-03, 05 and 07 confirmed the presence and continuity of

these "Hanging Wall Zones", highlighting the potential to enhance the existing resource. The most

significant results include 30.5 m of 0.22 g/t gold starting from surface in RC hole 20-CARC-03; 22.9 m

of 0.199 g/t gold in RC hole 20-CARC-07, and 35.05 m of 0.15 g/t gold in RC hole 20-CARC-05.

Figure 2: Cross Section Diagram of Drill Holes 20-CARC-05 & 20-CARC-06

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/7373/69142_1f2f70548410cabc_003full.jpg

Table 1.

Table of drill results

Hole Name

Azimuth

Dip

Section

Zone

From (m)

To (m)

Interval

(m)

True Width

(m)

Au (ppm)

Ag (ppm)

OX-SUL

20-CARC-

01

Interval

28

70°

100

Capitan

Main

0

10.7

10.7

10.5

0.112

0.15

OX

Interval

Capitan

Main

22.9

41.1

18.3

18.0

0.115

0.15

OX

Interval

Capitan

Main

45.7

64

18.3

18.0

0.196

0.2

OX

Interval

Capitan

Main

70.1

97.5

27.4

27.0

0.248

0.26

OX

Interval

Capitan

Main

100.6

115.8

15.2

15.0

0.139

0.25

OX

Interval

Capitan

Main

121.9

173.7

51.8

51.0

0.439

1.64

OX

Including

135.6

173.7

38.1

37.5

0.546

2.01

OX

Interval

Capitan

Main

173.7

201.2

27.4

27.0

0.282

2.13

SUL

20-CARC-

02

Interval

28

40°

000

Capitan

Main

0

42.7

42.7

42.5

0.245

0.18

OX

Interval

Capitan

Main

50.3

79.2

29

28.9

0.284

0.15

OX

Interval

Capitan

Main

83.8

140.2

56.4

56.2

0.398

0.81

OX

Including

112.8

138.7

25.9

25.8

0.526

1.56

OX

Interval

Capitan

Main

144.8

160

15.2

15.1

0.281

1.62

OX

20-CARC-

03

Interval

28

50°

400

Hanging

Wall

0

30.5

30.5

30.5

0.222

0.15

OX

Interval

Hanging

Wall

59.4

67.1

7.6

7.6

0.12

0.15

OX

Interval

Hanging

Wall

77.7

83.8

6.1

6.1

0.12

0.15

OX

Interval

Hanging

Wall

97.5

102.1

4.6

4.6

0.143

0.93

OX

Interval

Capitan

Main

115.8

184.4

68.6

68.6

0.398

11.01

OX

Including

Capitan

Main

117.3

134.1

16.8

16.8

0.741

15.88

OX

Interval

Capitan

Main

184.4

189

4.6

4.6

0.138

3.73

SUL

Interval

Capitan

Main

202.7

207.3

4.6

4.6

0.111

1.57

SUL

20-CARC-

04

Interval

28

60°

400

Hanging

Wall

0

10.7

10.7

10.7

0.132

0.3

OX

Interval

Captian

Main

16.8

22.9

6.1

6.1

0.157

0.31

OX

Interval

Captian

Main

30.5

68.6

38.1

38.1

0.341

1.78

OX

20-CARC-

05

Interval

0

90°

250

Hanging

Wall

0

3

3

2.6

0.133

0.15

OX

Interval

Hanging

Wall

15.2

18.3

3

2.6

0.126

0.15

OX

Interval

Hanging

Wall

47.2

82.3

35.1

30.4

0.146

0.15

OX

Interval

Capitan

Main

135.6

138.7

3

2.6

0.253

0.73

OX

Interval

Capitan

Main

149.4

225.6

76.2

66.0

0.414

21.02

OX

Including

167.6

184.4

16.8

14.5

0.68

28.49

OX

20-CARC-

06

Interval

28

70°

250

Hanging

Wall

18.3

29

10.7

10.7

0.236

0.15

OX

Interval

Capitan

Main

35.1

146.3

111.3

111.3

0.342

1.69

OX

Including

89.9

135.6

45.7

45.7

0.626

2.88

OX

20-CARC-

07

Interval

208

75°

300

Hanging

Wall

6.1

33.5

27.4

19.4

0.114

0.15

OX

Interval

Hanging

Wall

67.1

70.1

3

2.1

0.193

0.15

OX

Interval

Capitan

Main

91.4

114.3

22.9

16.2

0.199

1.35

OX

Interval

Capitan

Main

120.4

155.4

35.1

24.8

0.266

5.2

OX

Interval

Capitan

Main

160

210.3

50.3

35.6

0.216

4.83

OX

Qualified Person & QA/QC:

The scientific and technical data contained in this news release pertaining to the Peñoles Project was

reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining,

who is responsible for ensuring that the technical information provided in this news release is accurate

and who acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for

Mineral Projects.

Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and

verification of control samples including standard reference material, blanks and duplicates consistent

with industry standards.

RC drill samples from the Peñoles Project are collected and split at the drill site using a Gilson Universal

Splitter. The samples

are stored in either plastic bags (dry) or micropore bags (wet) and secured with

plastic zip-ties and then transported to the preparation laboratory of Bureau Veritas in Hermosillo,

Sonora. The sample pulps are then transported to the Bureau Veritas' laboratory in Vancouver, where

they are assayed for gold by fire assay with atomic absorption finish (FA430 assay method code; 0.005

to 10 ppm detection limit). Samples over 10 ppm Au are assayed with gravimetric finish (Assay code

FA530). All samples are also assayed by ICP-ES (code AQ300) for a suite of 33 elements.

All summarized intervals reported in this press release were calculated using a 0.10 ppm Au cut-off

grade. Intervals contain no more than 3 metres of internal dilution.

High grades have not been capped.

About Capitan Mining Inc.:

Capitan Mining is a well-funded junior exploration company focused on its 100% owned gold and silver

Peñoles Project in Durango, Mexico. The company is led by a management team that has successfully

advanced and developed several heap leach operations in Mexico over the past 16 years. More

information for the Company can be found at

www.capitanmining.com

.

ON BEHALF OF CAPITAN MINING INC.

"Alberto Orozco"

Alberto Orozco, CEO

For additional information contact:

Alberto Orozco

CEO

Capitan Mining Inc.

[email protected]

Phone: (778) 327-6671

Fax: (778) 327-6675

Web:

www.capitanmining.com

Raffi Elmajian

Corporate Communications

Capitan Mining Inc.

[email protected]

Phone: (604) 358-2601

Web:

www.capitanmining.com

Certain statements in this press release may be considered forward-looking information. These

statements can be identified by the use of forward-looking terminology (e.g., "expect"," estimates",

"intends", "anticipates", "believes", "plans"). Such information involves known and unknown risks --

including the availability of funds, the results of financing and exploration activities, the interpretation

of exploration results and other geological data, or unanticipated costs and expenses and other risks

identified by Capitan in its public securities filings that may cause actual events to differ materially

from current expectations. Readers are cautioned not to place undue reliance on these forward-

looking statements, which speak only as of the date of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/69142