Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CAPT.V ·

Capitan Mining Drills Best Intersection To Date: 1.5m Of 2,406 G/T Silver Equivalent Within 16.8m of 332 G/T Silver Equivalent At The Jesus Maria Silver Zone In Durango, Mexico

Drill Results

Capitan Mining Drills Best Intersection To

Date: 1.5m Of 2,406 G/T Silver Equivalent

Within 16.8m of 332 G/T Silver Equivalent At

The Jesus Maria Silver Zone In Durango,

Mexico

Vancouver, British Columbia--(Newsfile Corp. - May 2, 2022) -

Capitan Mining Inc.

(TSXV: CAPT)

("Capitan" or the "Company")

is pleased to report continued exploration results from five (5) reverse

circulation drillholes at its 100% owned Jesús María Silver Zone, at the Cruz de Plata Project (Formerly

referred to as Peñoles), Durango, Mexico.

Highlights:

Hole 21-JMRC-10 (Upper Zone

): returned

16.8m of 332 g/t AgEq

beginning at 22m from surface

and included:

9.1m 538.7 g/t AgEq

including;

1.5m of 2,406.3 g/t AgEq

-

Best Intersection to date at Jesus Maria

Hole 21-JMRC-10 (Lower Zone)

: returned

13.7m of 186.3 g/t AgEq

beginning at 58m from

surface and included:

7.6m of 308.8 g/t AgEq

Hole 21-JMRC-06 (Upper Zone)

: returned

13.7m of 146.4 g/t AgEq

including

3.0m of 271.45 g/t

AgEq

Hole 21-JMRC-06

(

Lower Zone)

: returned

4.6m of 188.9 g/t AgEq

including

1.5m of 448.16 g/t

AgEq

Hole 21-JMRC-08

returned

1.5m of 349.7 g/t AgEq

within

7.6m of 149.3 AgEq

All five (5) drillholes being reported successfully intersected Jesus Maria style mineralization

Assays are pending for 14 holes with drilling ongoing at the Cruz de Plata Project

Step-out drilling Confirms Continuity of Jesus Maria Silver Mineralization at Depth

Infill holes Confirm Continuity of High-grade Mineralization

The current drilling campaign has completed 21 holes at the Jesus María zone. The drillholes reported

herein were all step-out holes, except for hole 21-JMRC-06 and 21-JMRC-10 and were designed to

extend mineralization down-dip along section, with three holes targeting the eastern portion of the Jesus

Maria zone, and two targeting the west-central portion, and one targeting the high-grade shoot in the

central portion of the deposit.

Jesus Maria High-Grade Silver Shoot: Best Intersection at Jesus Maria to date

Hole 21-JMRC-10 was designed as a strategic infill hole that targeted a 60m wide gap in the high-grade

mineralized shoot that occurs at the approximate intersection of the steeply dipping Gully Fault and

shallowly dipping Jesus Maria structure. These holes play an important role in understanding the overall

distribution and boundaries of high-grade mineralization at Jesus Maria and provide valuable

information that help to increase the confidence in the continuity of the overall mineralization model.

Hole 21-JMRC-10 was successful in confirming the continuity of the high-grade shoot between drillholes

JM_DDH_14_26 and JM_DDH_14_27 which returned 602.02 g/t AgEq over 3m and 522.34 g/t AgEq

over 4.7m respectively. Additionally, Hole 21-JMRC-10 returned the best intersection to date at Jesus

Maria returning

1.5m of 2,406.29 g/t AgEq

within a wider interval of

16.8m of 332.4 g/t AgEq.

Step-Out and Infill Holes at Jesus Maria East

Drillhole 21-JMRC-05 located on section 700, was a 54m step-out hole that targeted the potential down-

dip extension of the Jesus Maria zone. The hole intersected Jesus Maria style, polymetallic

mineralization over broad widths ranging from 1.5m to 21.3m and successfully extended the zone down-

dip between 25 and 60m respectively. Best results include 21.3m of 66.87 g/t AgEq including

1.5m of

185.38 g/t AgEq

from 21-JMRC-05.

Hole 21-JMRC-06 was an infill hole designed to test the continuity of higher-grade mineralization that

was reported in two historic holes (JM_DDH_13_ 02 and 03), where there appeared to be either an

offset or apparent change in dip of the main Jesus Maria mineralized zone. The hole returned two

mineralized intervals (Upper and Lower) that correlated well with the zones reported in both historic

drillholes, suggesting that either the main zone has been offset by a small fault or that the Upper zone

pinches out the Lower one is developing and continuing down-dip beneath it. Results from the upper

zone include

13.7m of 146.46 g/t AgEq

, including

3.0m of 271.45 g/t AgEq.

The lower zone returned a

narrower interval of

1.5m of 448.16 g/t AgEq (lower zone).

Step-Out Drilling at Jesus Maria West

Holes 21-JMRC-08 and -09 were step-outs from drillholes 21-JMRC-04 and JM_DDH_16 respectively

and were designed to extend to Jesus Maria zone down-dip to the south, while also exploring for new

higher-grade mineralization at depth. Both holes intersected the Jesus Maria zone returning zones of

mineralization of similar size and grade to those found up-dip, with generally higher base metal contents

compared to the central and eastern portions of the deposit.

The best results include

7.6m of 149.3 g/t

AgEq

including

1.5m of 349.72 g/t AgEq

in hole 21-JMRC-08.

Capitan's CEO, Alberto Orozco, stated:

"

I am very excited with the first drill results from the Jesus Maria silver zone. The grades reported have

been quite impressive and have broadened the existing zones of silver mineralization at Cruz de

Plata.

"

With only 9 holes reported to date, assay results are showing excellent continuity of the Jesus María

vein and further definition of the Gully Fault zone.

We have also identified new veins and mineralized

zones in the footwall of the Jesús María vein, which we feel, demonstrates the significant potential to

expanding this compelling silver opportunity at our Cruz de Plata project."

Figure 1. Plan map of Jesus Maria Zone showing Drillhole locations

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/7373/122354_f5e0a14e94e14ac9_002full.jpg

Figure 2. Cross section of hole 21-JMRC-10

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/7373/122354_f5e0a14e94e14ac9_003full.jpg

Figure 3. Cross section of hole 21-JMRC-06

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/7373/122354_f5e0a14e94e14ac9_004full.jpg

Figure 4. Cross section of hole 21-JMRC-08

To view an enhanced version of Figure 4, please visit:

https://orders.newsfilecorp.com/files/7373/122354_f5e0a14e94e14ac9_005full.jpg

Table 1. Table of drill results for hole 21-JMRC-05, 06, 08, 09 and 10

21-JMRC-05

From (m)

To (m)

Interval (m)

AgEq (g/t)*

Ag (g/t)

Au (g/t)

Pb (%)

Zn (%)

Interval

36.6

38.1

1.5

56.12

44.90

0.13

0.00

0.014

Interval

44.2

45.7

1.5

69.14

64.80

0.05

0.00

0.005

Interval

88.4

109.7

21.3

66.87

34.62

0.22

0.14

0.274

including

91.4

93.0

1.5

116.59

86.00

0.33

0.05

0.075

including

100.6

102.1

1.5

185.38

52.90

1.36

0.48

0.258

Interval

187.5

189.0

1.5

27.66

16.90

0.08

0.06

0.072

21-JMRC-06

From (m)

To (m)

Interval (m)

AgEq (g/t)*

Ag (g/t)

Au (g/t)

Pb (%)

Zn (%)

Interval

24.4

25.9

1.5

31.95

8.10

0.29

0.00

0.008

Interval

62.5

65.5

3.0

49.14

14.90

0.43

0.00

0.006

Interval

117.3

131.1

13.7

146.46

100.53

0.12

0.24

0.786

including

118.9

121.9

3.0

271.45

152.50

0.17

0.51

2.445

And including

118.9

120.4

1.5

319.15

154.00

0.17

0.61

3.610

including

125.0

126.5

1.5

266.12

225.00

0.17

0.34

0.476

including

129.5

131.1

1.5

209.05

186.00

0.10

0.17

0.277

Interval

146.3

150.9

4.6

188.92

144.90

0.14

0.29

0.659

including

146.3

147.8

1.5

448.16

380.00

0.28

0.47

0.856

Interval

211.8

213.4

1.5

64.82

56.40

0.10

0.00

0.010

21-JMRC-08

From (m)

To (m)

Interval (m)

AgEq (g/t)*

Ag (g/t)

Au (g/t)

Pb (%)

Zn (%)

Interval

44.2

47.2

3.0

52.15

32.05

0.24

0.00

0.012

Interval

79.2

80.8

1.5

29.68

16.40

0.11

0.05

0.084

Interval

88.4

89.9

1.5

25.56

14.90

0.02

0.05

0.208

Interval

106.7

114.3

7.6

149.30

44.10

0.36

0.88

1.358

including

108.2

112.8

4.6

218.30

61.83

0.48

1.38

2.067

And including

108.2

109.7

1.5

349.72

92.00

0.05

2.88

4.520

Interval

152.4

155.4

3.0

59.48

17.55

0.37

0.16

0.193

21-JMRC-09

From (m)

To (m)

Interval (m)

AgEq (g/t)*

Ag (g/t)

Au (g/t)

Pb (%)

Zn (%)

Interval

85.3

86.9

1.5

54.37

52.40

0.01

0.03

0.013

Interval

96.0

105.2

9.1

34.13

18.117

0.058

0.131

0.202

Interval

149.4

152.4

3.0

85.52

24.70

0.16

0.47

0.908

21-JMRC-10

From (m)

To (m)

Interval (m)

AgEq (g/t)*

Ag (g/t)

Au (g/t)

Pb (%)

Zn (%)

Interval

10.7

12.2

1.5

56.42

51.80

0.05

0.00

0.011

Interval

16.8

33.5

16.8

332.36

291.20

0.152

0.079

0.079

including

16.8

25.9

9.1

538.73

477.97

0.56

0.258

0.229

and including

19.8

21.3

1.5

2,406.29

2,217.00

1.77

1.06

0.438

Interval

57.9

71.6

13.7

186.38

70.68

0.40

0.80

1.613

including

61.0

68.6

7.6

308.87

114.16

0.67

1.33

2.742

Interval

94.5

96.0

1.5

32.26

12.20

0.12

0.12

0.187

Interval

103.6

105.2

1.5

27.60

10.20

0.09

0.13

0.164

Interval

134.1

144.8

10.7

39.10

15.37

0.18

0.116

0.158

including

134.1

135.6

1.5

128.83

49.40

0.72

0.199

0.429

Interval

147.8

158.5

10.7

39.07

11.30

0.26

0.061

0.129

Interval

163.1

172.2

9.1

27.36

7.47

0.19

0.053

0.089

Interval

176.8

178.3

1.5

30.60

11.90

0.09

0.190

0.165

Note: Only drill intercept lengths are reported in the table. Drill holes are designed to cut the mineralized zones as close to true width as possible,

with true widths ranging from 70-95% of the reported drilled length.

* Silver equivalent calculated using the following equation AgEq = Ag g/t + (80 x Au g/t) + (0.003 x Pb g/t) + (0.0037 x Zn g/t)

About the Jesus María Silver Project

The Jesus Maria (JM) Silver Project is located approximately 280m to the northeast of the Capitan's

Oxide Gold deposit on its 100% owned Cruz de Plata property. It has been traced by surface trenching

and diamond drilling over a strike length of 750m and to a depth of 150m, with the majority of drilling

focused over 250m strike length and less than 100m below surface.

The Jesus Maria Silver Project has a long mining history going back to the late 1800's, when the

Penoles Mining company constructed several shafts and drifts to exploit the high-grade silver veins in the

area. In recent years, work programs conducted by previous operators has demonstrated significant

potential at the Jesus Maria silver deposit. The work to date has identified Two (2) distinct styles of silver

mineralization:

1

.

High-grade silver polymetallic veins (Silver gold lead-Zinc)

2

.

High-grade silver with gold veins

Highlights of trenching and diamond drilling by previous operators are presented below:

Prior Trenching Highlights - Jesus Maria (2011-2013)

22m of 224g/t Ag, 1.08 g/t Au, 2.5% Pb and 1.7% Zn (2011)

8.3m of 144 g/t Ag, 1.68 g/t Au, 2.4% Pb and 2.2% Zn (2011)

13.4m of 309 g/t Ag, 1.7 g/t Au. 2.4% Pb and 0.6% Zn (2011)

2m of 2,152.2 g/t Ag and 0.48 g/t Au, within a wider interval of 15.4m of 420.8 g/t Ag, 0.15 Au

(2013)

2m of 378.9 g/t Ag and 0.97 g/t Au,within a wider interval of 15.8m of 129.8 g/t Ag and 0.16 g/t Au

(2013)

Prior Diamond Drill Highlights - Jesus Maria (2013-2014)

High-grade Silver Polymetallic veins

JM-DDH-13-06:

0.9m of 3,409.1 g/t Ag, 0.9 Au, 3.4% Pb and 7.1% Zn within a wider interval of

11.85m of 320.3 g/t Ag and 0.17 Au

JM-DDH-13-07:

2.1m of 279.5 g/t Ag, 0.21 g/t Au, 4.09% Pb and 7.57% Zn

JM-DDH-14-10:

2.3m of 113.8 g/t Ag, 0.82 g/t Au, 4.3% Pb and 1.8% Zn

High Grade Silver & Gold Veins

JM-DDH-14-24:

7.15m of 988 g/t Ag and 1.24 g/t Au within a wider interval of 70.8m of 147.8 g/t

Ag, 0.37 g/t Au

JM-DDH-14-10:

4.25m of 732.2 g/t Ag, 1.2 g/t Au, within a wider interval of 40.6m of 123.9g/t Ag

and 0.54 g/t Au

JM-DDH-13-07:

2m of 988.5 g/t Ag, 0.23 g/t Au within an interval of 4m of 533 g/t Ag and 0.16 g/t

Au

JM-DDH-14-27:

4.7m of 398 g/t Ag and 1.33 g/t Au within a wider interval of 47m of 125 g/t Ag

and 0.4 g/t Au

Approximately 3,100m of diamond drilling were completed by previous operators at the Jesus Maria

silver deposit (2011-2014), which were used to complete an initial 43-101 compliant, Inferred resource

in 2015 consisting of 7.5M tonnes at 62 g/t Ag (15M ounces) and 0.1 g/t Au (26k ounces).

Qualified Person & QA/QC:

The scientific and technical data contained in this news release pertaining to the Peñoles Project was

reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining,

who is responsible for ensuring that the technical information provided in this news release is accurate

and who acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for

Mineral Projects.

Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and

verification of control samples including standard reference material, blanks and duplicates consistent

with industry standards.

RC drill samples from the Peñoles Project are collected and split at the drill site using a Gilson Universal

Splitter. The samples are stored in either plastic bags (dry) or micropore bags (wet) and secured with

plastic zip-ties and then transported to the preparation laboratory of Bureau Veritas in Hermosillo,

Sonora. The sample pulps are then transported to the Bureau Veritas' laboratory in Vancouver, where

they are assayed for gold by fire assay with atomic absorption finish (FA430 assay method code; 0.005

to 10 ppm detection limit). Samples over 10 ppm Au and over 100 ppm Ag are assayed with gravimetric

finish (Assay code FA530). All samples are also assayed by ICP-ES (code AQ300) for a suite of 33

elements. Samples over 1%Pb and Zn are assayed by Aqua regia Ore Grade ICP-ES (AQ 370).

All summarized intervals reported in this press release were calculated using a 25 ppm Ag equivalent

(AgEq) cut-off grade with AgEq considering Ag, Au, Pb and Zn and calculated as follows: AgEq = Ag g/t

+ (80x Au g/t) + (0.003 x Pb g/t) + (0.0037 x Zn g/t). Intervals contain no more than 3 metres of internal

dilution. High grades have not been capped.

About Capitan Mining Inc.:

Capitan Mining is a well-funded junior exploration company focused on its 100% owned gold and silver

Peñoles Project in Durango, Mexico. The company is led by a management team that has successfully

advanced and developed several heap leach operations in Mexico over the past 16 years. More

information for the Company can be found at

www.capitanmining.com

.

ON BEHALF OF CAPITAN MINING INC.

"Alberto Orozco"

Alberto Orozco, CEO

For additional information contact:

Alberto Orozco

CEO

Capitan Mining Inc.

[email protected]

Phone: (778) 327-6671

Fax: (778) 327-6675

Web:

www.capitanmining.com

Raffi Elmajian

Corporate Communications

Capitan Mining Inc.

[email protected]

Phone: (604) 358-2601

Web:

www.capitanmining.com

Certain statements in this press release may be considered forward-looking information. These

statements can be identified by the use of forward-looking terminology (e.g., "expect"," estimates",

"intends", "anticipates", "believes", "plans"). Such information involves known and unknown risks --

including the availability of funds, the results of financing and exploration activities, the interpretation

of exploration results and other geological data, or unanticipated costs and expenses and other risks

identified by Capitan in its public securities filings that may cause actual events to differ materially

from current expectations. Readers are cautioned not to place undue reliance on these forward-

looking statements, which speak only as of the date of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/122354