Canadian GoldCamps Announces Option to Acquire Valley Springs Lithium Project in Nevada
Canadian GoldCamps Announces Option to Acquire
Valley Springs Lithium Project in Nevada
Toronto, Ontario – October 7, 2022 – Canadian GoldCamps Corp. (“Canadian GoldCamps”, or the
“Company”) (CSE: CAMP) (FSE: A68) (OTC: SMATF) today announced that it has entered into a
definitive purchase agreement with Zaryadka Lithium Corp. (the “Vendor”) dated October 7, 2022, for
the acquisition of the Vendor’s right to earn a 100% undivided ownership interest in the Valley Springs
lithium p roject (“Valley Springs Project” or the “ Property”) located in western Nevada (the
“Acquisition”). The Valley Springs Project consists of 997 placer claims representing 19,940 acres
(8,069.4 hectares) located 55 miles south-southeast of Battle Mountain and 35 miles north-northeast
of Austin, Nevada.
In consideration for the Project, the Company shall issue 13,000,000 common shares to the Vendor
(the “Consideration Shares”) and assumption of all of the obligations under the Valley Springs Project
option agreement (the “Option Agreement”) among the Vendor and the original optionor, Great Basin
Resources Inc. (“Great Basin”). The Consideration Shares shall be issued at a deemed price per
share of $0.25.
The Acquisition constitutes a "Fundamental Change" pursuant to the policies of the C anadian
Securities Exchange (the “ Exchange”). As a result, the Acquisition requires approval of the
shareholders of the Company. The Company intends to obtain such approval by way of writ ten
consent of the holders of the majority of the outstanding share capital of the Company. Holders
consenting to the Acquisition will be asked to confirm that they would vote in favour of the
Acquisition in the event it was presented for approval at a meeting of the shareholders of the
Company. Completion of the Acquisition remains subject to a number of conditions, however,
including the successful completion of due diligence, approval of the shareholders of the
Company, and approval of the Exchange. The acceptance of the Exchange will require, among
other things, the completion and filing of a NI 43-101 compliant technical report on the Valley
Springs Project. The Acquisition cannot be completed until these conditions are satisfied, and
there can be no assurance that the Acquisition will be completed in a timely fashion or at all.
About the Valley Springs Project
The Valley Springs Property is located within the Great Basin Physiographic Province in the
topographically and hydrologically closed Grass Valley basin, one of several within western Nevada.
Referred to as a salar or playa, the basin is floored by evaporative clay -rich sediments. Salt, borate,
sulfates and other evaporites are being actively deposited from ephemeral streams draining the
Toiyabe Range on the west and south, the Simpson Park Range on the east, and the Cortez Range
on the north. The Valley Springs Property has characteristics in common with lithium brines within
structural basins worldwide: 1) arid climate, 2) closed basin, 3) ass ociated volcanic or geothermal
activity, 4) adequate felsic source rocks, 5) suitable local structural faulting due to regional tectonics,
6) adequate hydrologic system including subsurface aquifers, and 7) sufficient duration of time under
arid conditions to concentrate lithium. Limited surface geochemical sampling of sediments in the Valley
Springs Property returned lithium values as high as 510ppm which affirms the presence of prospective
lithium within the Grass Valley basin.
The Vendor has currently mobilized a track- mounted drill rig to test possible subsurface lithium brine
and lithium bearing claystone to determine the tenor and extent of mi neralization. The Phase I
exploration program consists of two deep core drill holes at the north end of a 2016 MT (Magneto
Telluric) survey line, with both holes expected to reach a depth of 2,000 feet. MT is a widely used
geophysical method which uses electrical conductivity to help determine the nature of subsurface
layers and the overall shape of a basin. A second Phase II program provides for further drill testing of
possible brine or lithium-bearing clay horizons and is not contingent on positive results obtained in the
first phase program.
The Option Agreement
Upon assumption of the Option Agreement by the Company, the Company shall be obligated to incur
an aggregate total of $5,000,000 USD ($6,821,250 CAD) in exploration expenditures (the
“Expenditures”) on the Property on or prior to December 1, 2026, and shall earn into the project on
the following basis:
• Phase 1 Expenditure of $1,000,000 USD ($1,364,250 CAD) on or before April 1, 2023 t o
acquire 50% interest in the Project;
• Phase 2 Expenditure of an additional $1,000,000 USD ($1,364,250 CAD) on or before
December 1, 2023 to acquire 70% interest in the Project;
• Phase 3 Expenditure of an additional $1,000,000 USD ($1,364,250 CAD) on or before
December 1, 2024 to acquire 80% interest in the Project;
• Phase 4 Expenditure of an additional $1,000,000 USD ($1,364,250 CAD) on or before
December 1, 2025 to acquire 90% interest in the Project; and
• Phase 5 Expenditure of an additional $1,000,000 USD ($1,364,250 CAD) on or before
December 1, 2026 to acquire 100% interest in the Project.
The Property is subject to a 3.0% Net Smelter Return payable to Great Basin upon the Property going
into production, subject to the Company having a buy back right to purchase up to 1.5% of the Net
Smelter Return upon payment of up to $6,000,000 USD ($8,185,500 CAD).
Qualified Person
Mr. Robert A. Lunceford., CPG, a Qualified Person under NI 43-101 regulations, has reviewed and
approved the scientific and technical disclosure in the news release.
About Canadian GoldCamps Corp.
Canadian GoldCamps Corp. is a Canadian-based junior exploration stage company engaged in the
evaluation, acquisition and exploration of lithium properties.
For further information, please contact:
Canadian GoldCamps
Brendan Purdy, Interim CEO
604-687-2038
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of
the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain forward- looking statements based on assumptions and judgments of management
regarding future events or results. Such statements are subject to a variety of risks and uncertainties which could
cause actual events or results to differ materially from those reflected in the forward -looking statements. There is no
assurance the private placement, property option, change of board or reinstatement of trading referred to above will
close on the terms as stated, or at all. The Company disclaims any intention or obligation to revise or update such
statements.