Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CAMB.V ·

Cambria Gold Mines Reports Results From 2024 & 2025 Drilling, Including 20.7 g/t Au and 50.1 g/t Ag over 15.9 meters at Big Missouri Extension

Drill Results

Cambria Gold Mines Reports Results From

2024 & 2025 Drilling, Including 20.7 g/t Au and

50.1 g/t Ag over 15.9 meters at Big Missouri

Extension

Vancouver, British Columbia--(Newsfile Corp. - March 3, 2026) -

Cambria Gold Mines Inc. (TSXV:

CAMB) (OTC: AOTVF)

("

Cambria

" or the "

Company

") is pleased to announce the results from the

2024 and 2025 drilling programs at the Premier Gold Project ("

PGP

" or "

Premier Project

"), located in

northwestern British Columbia.

Highlights include:

High grade gold over significant widths in Big Missouri extension drilling, including

15.9m @

20.75g/t Au

& 51.0g/t Ag

in hole P25-2695a and

6.9m @ 32.81g/t Au

& 13.4g/t Ag

in hole P25-

2670.

A newly defined target with high-grade gold intercepted proximal to the existing Premier mill

facility and outside the current resource area, near the historic Sebakwe mine.

Results include:

3.9m @ 16.20 g/t Au & 68.0 g/t Ag

in hole P25-2673 and

1.3m @ 32.40 g/t Au & 9.1g/t Ag

in

hole P25-2683.

A total of 26,303 metres of surface drilling was completed in 2024 and 2025 from 135 exploration

diamond drillholes.

The drill programs focused on infill and extension drilling for the Big Missouri deposit

and on new target areas surrounding the Premier-Northern Lights (PNL) deposit.

All 2025 drill samples

were both prepared and analyzed by ALS Canada Ltd ("

ALS

").

Reported results from 2024 drilling are

from reanalysis by ALS of pulps originally prepared and analyzed at a contracted grade control

laboratory in Stewart, BC when the Premier Project was in active operation.

"

The identification of high-grade gold mineralization proximal to the Big Missouri and PNL deposits

demonstrates the strong resource expansion potential at the Premier Gold Project; these results will

help inform remodelling work as we redefine Big Missouri's geological potential and the high-grade

gold results 600 meters north of the PNL deposit are highly encouraging

," said Robert McLeod,

President and CEO of Cambria Gold Mines. "

Our 2026 drilling program has recently commenced and

will target upgrading and expansion of current Mineral Resources

."

2025 Exploration Drilling - Big Missouri Extension

A total of 3,252 metres over 15 holes were drilled in 2025 to test the southwestern extension of the Big

Missouri deposit, yielding multiple high-grade gold intercepts.

The highest gold grades are

characterized by moderate to intense sulfide mineralization and quartz alteration.

The zone remains

open along strike and down-dip and will be further evaluated as part of the ongoing exploration work at

Big Missouri.

Significant intersections include:

P25-2659a: 15.9m @ 20.75 g/t Au & 51.0g/t Ag (incl. 6.1m @ 50.13g/t Au & 123.0g/t Ag)

P25-2670: 6.9m @ 32.81 g/t Au & 13.4g/t Ag (incl. 2.5m @ 88.24g/t Au & 20.1g/t Ag)

P25-2684: 4.0m @ 24.23 g/t Au & 28.8g/t Ag

2025 Exploration Drilling – Sebakwe Extension

An additional 11,712 metres within 35 holes were drilled to test new exploration targets in 2025.

Drilling

resulted in the delineation of a new target zone proximal to the Premier mill facility and associated with a

chargeability high, that was identified in previous geophysical survey work.

This zone is a potential

extension of the historically mined Sebakwe trend located north of the PNL deposit.

Grades are

associated with structurally controlled sulfide mineralization hosted within quartz veins and cemented

breccias, similar to what is observed at the Premier Northern Lights ("

PNL

") deposit located 600m to

the southeast.

While the Company's initial focus in 2026 remains on development infill drilling of the

known Premier deposits, these results and the wider claim package will continue to be advanced with

future exploration follow-up.

Significant intersections include:

P25-2673: 3.9m @ 16.20 g/t Au & 68.0g/t Ag

P25-2675: 2.3m @ 9.61 g/t Au & 50.0g/t Ag

P25-2683: 1.3m @ 32.40 g/t Au & 9.1g/t Ag

2024 Big Missouri Infill Drilling

2024 drilling at Big Missouri consisted of 11,339 metres over 85 holes intended to provide close-

spaced intercepts within the deposit, aimed to guide mine development planning.

All 2024 drill samples

were initially prepared and analyzed at a non-accredited grade control laboratory in Stewart, BC when

the site was in operation.

In 2025, following the transition to care and maintenance, the decision was

made to send the 2024 sample pulps for re-analysis by ALS at an ISO:17025 accredited laboratory in

North Vancouver to allow for public reporting of drilling results.

All reported results contained in this news

release are from the analysis completed by ALS.

Infill holes generally confirm the grades and geometries indicated by previous nearby drilling.

Mineralization at Big Missouri generally occurs within wide, sub horizontal vein breccias.

The Company

believes these results reinforce the potential for Big Missouri to be remodelled as zones of broader

mineralization and higher tonnage than previously envisioned, highlighting the potential for larger-scale

open-stoping.

The Company also intends to complete additional infill drilling this year to continue

improving resource confidence at Big Missouri.

Significant intersections from reanalysis of 2024 drill

sample pulps include:

P24-2558:

8.5m @ 8.45 g/t Au & 41.5g/t Ag (incl. 1.0m @ 15.95g/t Au and incl. 1.75 m @ 18.80g/t

Au)

and

6.2m @ 7.70 g/t Au & 34.2 g/t Ag

P24-2605: 10.0m @ 7.66 g/t Au & 12.2 g/t Ag (incl. 4.8m @ 14.59g/t Au & 16.2g/t Ag)

P24-2634: 8.3m @ 9.28 g/t Au (incl. 2.0m @ 32.00g/t Au & 30.0g/t Ag)

Figure 1: Plan map of Big Missouri Results

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_001full.jpg

Figure 2: Section of Big Missouri Extension Drilling

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_002full.jpg

Figure 3: Cross Section of Big Missouri Infill Drilling

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_003full.jpg

Figure 4: Plan map of PNL Exploration Drilling & Sebakwe Extension Target

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_004full.jpg

Figure 5: Cross Section of Sebakwe Extension Target

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_005full.jpg

Figure 6: Core photos of Big Missouri Extension Results

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_006full.jpg

Figure 7: Core photos of Sebakwe Extension Target

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4267/286019_39055705b4c4fa45_007full.jpg

Table 1: 2024 & 25 Drill Results – Significant Intersections:

Program

holeid

from

(m)

to

(m)

Interval

(m)

ETW

1

Au ppm

Ag ppm

Zn ppm

Pb ppm

Cu ppm

Big Missouri

2025

Extension

P25-2658

195.12

197.18

2.1

8.00

22.9

30826

267

1170

P25-2659A

186.79

202.70

15.9

20.75

51.0

35026

1892

5608

210.70

212.70

2.0

23.60

19.6

4900

96

45

P25-2660

123.00

125.00

2.0

64.20

21.9

99

22

29

P25-2663

107.30

109.30

2.0

3.10

4.8

397

197

276

P25-2665

234.86

240.08

5.2

3.44

13.0

2425

287

25

P25-2670

203.90

210.85

6.9

32.81

13.4

1186

414

12

P25-2671

198.00

203.88

5.9

2.28

7.2

4280

170

265

234.36

239.50

5.1

2.64

4.6

1977

307

273

P25-2682

173.00

181.00

8.0

2.10

5.9

5079

265

230

P25-2684

166.54

167.65

1.1

35.80

84.5

28700

3820

3810

175.00

179.00

4.0

24.23

28.8

18275

797

1058

Other 2025

Exploration

Drilling

P25-2638

220.70

224.27

3.6

2.83

12.7

12676

9182

162

P25-2639

176.00

177.78

1.8

7.05

80.5

17850

8190

346

P25-2645

246.00

252.00

6.0

1.02

2.8

1850

684

38

P25-2646

228.04

238.61

10.6

3.02

3.8

1834

1226

27

254.41

261.48

7.1

3.96

3.9

1233

585

35

P25-2647

230.48

231.63

1.2

14.20

30.8

10750

5010

41

235.60

237.69

2.1

2.24

7.2

2757

1580

39

P25-2648

219.70

223.18

3.5

1.80

8.4

6579

2016

76

250.27

251.64

1.4

5.76

4.1

2840

1430

28

279.37

280.89

1.5

10.25

17.6

79

27

39

P25-2650

252.87

255.72

2.8

8.16

13.7

5877

2912

48

P25-2654

259.16

262.28

3.1

1.67

6.2

7689

3635

196

284.30

286.13

1.8

3.04

4.3

5650

3130

47

P25-2656

316.81

320.90

4.1

1.17

5.8

411

147

73

P25-2667

270.50

276.24

5.7

2.50

46.9

16873

19204

2043

295.30

297.90

2.6

2.95

63.7

57908

38277

2326

P25-2672

287.54

294.95

7.4

1.20

16.9

14187

3053

232

P25-2673

228.11

232.00

3.9

16.20

68.0

30901

23862

1953

P25-2674

235.16

236.68

1.5

5.42

51.1

35100

20500

1100

268.00

272.00

4.0

1.52

19.6

20575

11620

545

286.00

288.00

2.0

4.00

9.9

7270

2040

87

P25-2675

255.90

258.18

2.3

9.61

50.0

82042

19375

1444

P25-2677

29.65

31.65

2.0

19.95

15.3

120

5

22

P25-2679

223.89

230.00

6.1

2.18

55.9

13267

18789

1046

P25-2683

228.30

229.68

1.4

3.38

64.7

23200

34300

1790

239.75

241.00

1.3

32.40

9.1

3630

1065

193

P25-2685

222.66

227.78

5.1

4.49

72.8

25718

17630

1031