Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BZ.V ·

Benz Secures Tenure as Part of Upper Eastmain Greenstone Belt Consolidation

Corporate Updates

Benz Secures Tenure as Part of Upper

Eastmain Greenstone Belt Consolidation

HIGHLIGHTS

Benz footprint expanded with acquisition of Windy Mountain Project, a western

extension of Upper Eastmain Greenstone Belt

69 new claims granted over 36km

2

of prospective tenure, adding approximately 10km

additional greenstones strike to the Benz portfolio

Sulphides (amenable to detection by electromagnetics) identified in outcrops associated

with deformed and altered gabbro with quartz veins; outcropping altered metasediments

also observed

Historical surface samples show anomalous nickel and copper assays in trench samples

returning 0.08% Cu, 0.9% Zn, 0.05% Ni, and 0.8g/t Ag and 0.02% Cu, 0.02% Ni and 0.03%

Co

Pegmatites were identified at several localities - samples collected; assays pending

Toronto, Ontario--(Newsfile Corp. - October 28, 2021) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (the

Company

or

Benz

) is pleased to announce the recent granting from application of additional

prospective ground adjacent to its Ruby Hill West Project. The newly acquired tenement package

contains 69 claims covering 36km

2

, increasing Benz' dominant Upper Eastmain land position to

256km

2

.

CEO Xavier Braud commented

:

"Our strategy is to fast-track growth through discovery, and by

rapidly expanding our footprint in a district where we have already made several mineralised

discoveries, we lay the foundations for continued success. What is exciting is that the Upper Eastmain

greenstone belt is proving to not only be highly prospective for gold, but also for nickel, copper,

lithium. We are fortunate to have consolidated an enviable and dominant land position covering the

mineralised district."

Figure 1: Windy Mountain and Ruby Hill West Projects with recorded mineral occurrences.

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/1818/101115_a44bc956e447593a_001full.jpg

CEO Xavier Braud commented

: "Our analysis of historical work conducted in the Windy Mountain

area revealed recorded mineral occurrences coincident with the geology at Ruby Hill West. We were

fortunate that this area was not under claim as there has been a lot of tenure activity in the area

following our success at Eastmain. With this addition, we bolt on an additional 10km of prospective

strike.

"We have always held the belief that the Upper Eastmain Greenstone Belt has the potential to host its

own mining camp with possibly several deposits and commodities such as gold, nickel, copper and

lithium, just like many other Archean greenstone belts in the world.

"The presence of pyrrhotite associated with favourable rock types in the Windy Mountain area is a

great sign as we know we can track this mineral with electromagnetics, a methodology we have

successfully employed at our high-grade Eastmain Gold Project.

"Controlling a large portion of a greenstone belt bolsters our opportunity for discovery. In addition to

the Eastmain gold deposit and the lithium bearing pegmatite at Ruby Hill West, we also have multiple

base and precious metals occurrences at Ruby Hill East and West. With the addition of Windy

Mountain, we have one more metallic occurrence and several pegmatite outcrops.

"Our team has already done a reconnaissance prospecting campaign to the area and collected

multiple grab samples of all styles of mineralisation on outcrops and blocs. During this campaign, our

teams have also identified occurrences of pegmatite. This is a welcome surprise and confirms the

potential of the area for lithium mineralisation, a potential which we shall fully investigate in parallel

with our gold drilling."

Figure 2: Upper Eastmain Greenstone Belt simplified geology, Benz tenure in blue, newly acquired

Windy Mountain Project in red.

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/1818/101115_a44bc956e447593a_002full.jpg

Figure 3: Sampling pegmatite outcrop at Windy Mountain.

To view an enhanced version of Figure 3, please visit:

https://orders.newsfilecorp.com/files/1818/101115_a44bc956e447593a_003full.jpg

Figure 4: Pegmatite Outcrop at Windy Mountain.

To view an enhanced version of Figure 4, please visit:

https://orders.newsfilecorp.com/files/1818/101115_a44bc956e447593a_004full.jpg

Figure 5: Sulphide mineralisation in outcrop at Windy Mountain.

To view an enhanced version of Figure 5, please visit:

https://orders.newsfilecorp.com/files/1818/101115_benzfigure5.jpg

Figure 6: Quartz Sulphide vein in mafic host rock at Windy Mountain.

To view an enhanced version of Figure 6, please visit:

https://orders.newsfilecorp.com/files/1818/101115_benzfigure6.jpg

About Benz Mining Corp.

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and

finance professionals with a focused strategy to acquire and develop mineral projects with an emphasis

on safe, low risk jurisdictions favourable to mining development. Benz is earning a 100% interest in the

former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East projects in Quebec

and owns 100% of the Windy Mountain Project.

About the Eastmain Gold Project

The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada,

currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9gpt gold (Indicated:

236,500oz at 8.2gtp gold, Inferred: 139,300oz at 7.5gtp gold). The existing gold mineralisation is

associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed

and altered rocks making it amenable to detection using electromagnetic techniques. Multiple gold

occurrences have been identified by previous explorers over a 10km long zone along strike from the

Eastmain Mine with very limited but highly encouraging testing outside the existing resource area. Benz

has subsequently identified over 150 DHEM conductors over a strike length of 6km which is open in all

directions.

Figure 7: Benz tenure over Upper Eastmain Greenstone Belt simplified geology.

To view an enhanced version of Figure 7, please visit:

https://orders.newsfilecorp.com/files/1818/101115_a44bc956e447593a_007full.jpg

This press release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P.Geo,

acting as Benz's qualified person under National Instrument 43-101.

Approved for release by the Board of Benz Mining Corp.

For more information please contact:

Paul Fowler

Head of Corporate Development (Canada)

Benz Mining Corp.

Telephone: +1 416 356 8165

Email:

[email protected]

Xavier Braud

CEO, Head of Corporate Development (Australia)

Benz Mining Corp.

Telephone +61 8 6143 6702

Email:

[email protected]

Forward-Looking Information:

Certain statements contained in this news release may constitute

"forward-looking information" as such term is used in applicable Canadian securities laws. Forward-

looking information is based on plans, expectations and estimates of management at the date the

information is provided and is subject to certain factors and assumptions, including, that the Company's

financial condition and development plans do not change as a result of unforeseen events and that the

Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and

uncertainties and other factors that could cause plans, estimates and actual results to vary materially

from those projected in such forward-looking information. Factors that could cause the forward-looking

information in this news release to change or to be inaccurate include, but are not limited to, the risk that

any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those

referred to above are realized and result in delays, or cessation in planned work, that the Company's

financial condition and development plans change, and delays in regulatory approval, as well as the

other risks and uncertainties applicable to the Company as set forth in the Company's continuous

disclosure filings filed under the Company's profile at

www.sedar.com

. The Company undertakes no

obligation to update these forward-looking statements, other than as required by applicable law.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS

THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

JORC Competent Person's Statements:

The information in this report that relates to Exploration

Results is based on and fairly represents information and supporting information compiled by Mr Xavier

Braud, who is a member of the Australian Institute of Geoscientists (AIG membership ID:6963). Mr

Braud is a consultant to the Company and has sufficient experience in the style of mineralization and

type of deposits under consideration and qualifies as a Competent Person as defined in the 2012

edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves". Mr Braud holds securities in Benz Mining Corp and consents to the inclusion of all technical

statements based on his information in the form and context in which they appear.

The information in this announcement that relates to the Inferred Mineral Resource was first reported

under the JORC Code by the Company in its prospectus released to the ASX on 21 December 2020.

The Company confirms that it is not aware of any new information or data that materially affects the

information included in the original market announcement and confirms that all material assumptions and

technical parameters underpinning the estimate continue to apply and have not materially changed.

The

Company confirms that the form and context in which the Competent Person's findings are presented

have not been materially modified from the original market announcement.

Appendix 1: JORC Tables

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria

JORC Code explanation

Commentary

Sampling

techniques

Nature and quality of sampling (eg cut channels, random

chips, or specific specialised industry standard

measurement tools appropriate to the minerals under

investigation, such as down hole gamma sondes, or

handheld XRF instruments, etc). These examples should

not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample

representivity and the appropriate calibration of any

measurement tools or systems used.

Aspects of the determination of mineralisation that are

Material to the Public Report.

In cases where 'industry standard' work has been done

this would be relatively simple (eg 'reverse circulation

drilling was used to obtain 1 m samples from which 3 kg

was pulverised to produce a 30 g charge for fire assay'). In

other cases more explanation may be required, such as

where there is coarse gold that has inherent sampling

problems. Unusual commodities or mineralisation types (eg

submarine nodules) may warrant disclosure of detailed

information.

Assay results in this press release are historical assay results

available on SIGEOM, Quebec's public geological

information portal.

Samples are registered as trench samples. The

methodology is not detailed in the historical information

but trench samples are typically composite rock chips

samples over the length of a hand dug trench

Drilling

techniques

Drill type (eg core, reverse circulation, open-hole hammer,

rotary air blast, auger, Bangka, sonic, etc) and details (eg

core diameter, triple or standard tube, depth of diamond

tails, face-sampling bit or other type, whether core is

oriented and if so, by what method, etc).

No drilling reported

Drill sample

recovery

Method of recording and assessing core and chip sample

recoveries and results assessed.

Measures taken to maximise sample recovery and ensure

representative nature of the samples.

Whether a relationship exists between sample recovery

and grade and whether sample bias may have occurred

due to preferential loss/gain of fine/coarse material.

No drilling reported

Logging

Whether core and chip samples have been geologically

and geotechnically logged to a level of detail to support

appropriate Mineral Resource estimation, mining studies

and metallurgical studies.

Whether logging is qualitative or quantitative in nature.

Core (or costean, channel, etc) photography.

The total length and percentage of the relevant

intersections logged.

No drilling reported

Sub-sampling

techniques

and sample

preparation

If core, whether cut or sawn and whether quarter, half or

all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc

and whether sampled wet or dry.

For all sample types, the nature, quality and

appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling

stages to maximise representivity of samples.

Measures taken to ensure that the sampling is

representative of the in situ material collected, including

for instance results for field duplicate/second-half

sampling.

Whether sample sizes are appropriate to the grain size of

the material being sampled.

No drilling reported

Quality of

assay data

and

laboratory

tests

The nature, quality and appropriateness of the assaying

and laboratory procedures used and whether the

technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF

instruments, etc, the parameters used in determining the

analysis including instrument make and model, reading

times, calibrations factors applied and their derivation,

etc.

Nature of quality control procedures adopted (eg

standards, blanks, duplicates, external laboratory checks)

and whether acceptable levels of accuracy (ie lack of

bias) and precision have been established.

Benz does not have a record of the original laboratory

certificates

Samples

Criteria

JORC Code explanation

Commentary