Benz Mining Corp. 2023 Diamond Drilling Campaign Underway
Benz Mining Corp. 2023 Diamond Drilling
Campaign Underway
HIGHLIGHTS
2023 winter diamond drilling campaign has commenced on the Upper Eastmain
Greenstone Belt Project.
First drillhole is following up on several gold intersections at the E Zone discovery,
including 1.0m at 365.5g/t gold from 81.0m (EM21-229, highest grade to date for Benz).
12,000m of diamond drilling planned including 4,000m exclusively dedicated to critical
minerals exploration including lithium, copper and nickel following up maiden drill
program intersecting 30m at 0.9% Li
2
O.
Second helicopter portable diamond drill rig booked for mid-February starting on Ruby
Hill East targets on IP chargeability anomalies and surface geochemistry results.
Assays pending for 1,600 samples including lithium assays from Ruby Hill West and gold
assays from Eastmain.
Resource estimation work progressing with preliminary results expected in Q1 2023.
Toronto, Ontario--(Newsfile Corp. - February 1, 2023) -
Benz Mining Corp. (TSXV: BZ) (ASX: BNZ)
(the
"Company"
or
"Benz"
) is pleased to provide an update on exploration activities in the Upper
Eastmain Greenstone Belt, located in the James Bay area of Quebec.
Dahrouge Geological Consultants and Major Drilling, the two contracting groups selected by Benz to
conduct the 2023 diamond drilling campaign in the Company's Upper Eastmain Greenstone Belt
projects, have mobilised to the Eastmain Camp and drilling has commenced.
Figure 1: Drill rig and equipment at Benz's Eastmain Camp, January 2023
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1818/153145_e92b9d9314ab4be5_001full.jpg
The objective of the diamond drilling campaign is to follow up previous gold intersections and to expand
the resources at the E Zone and D Zone prospects.
Drilling is also planned to commence in March 2023
at the Julien and Michel prospects, following up on previous positive drill results.
The first drillhole for the 2023 winter exploration campaign targets extensions to the newly discovered E
Zone at the Eastmain gold project. E Zone is a substantial virgin gold discovery made by Benz by testing
electromagnetic targets, both ground and down-hole electromagnetic survey (
DHEM
).
A helicopter portable drill rig is scheduled to mobilise in February to drill critical minerals targets. The
first target to be drilled will be a large induced polarisation (
IP
) anomaly located at Ruby Hill West,
coincident with soils geochemical anomalies including lithium, nickel and copper. This area is
completely under shallow cover so no surface outcrop is exposed making it an extremely exciting target
given the circa 4km long Li, Cs, Ta soil anomaly wrapping around a magnetic intrusive body.
Figure 2: Multiple soil anomalies with lithium, caesium, tantalum and niobium on the Ruby Hill East
Prospect
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1818/153145_e92b9d9314ab4be5_002full.jpg
Benz is also waiting for multielement analysis of multiple surface samples of pegmatites collected in
2022. Results from those rock chips samples will guide the future drilling programs at the Ruby Hill West
prospect commencing after the snow melts, with soil and till surficial geochemical surveys and further
prospecting along the pegmatite trend. The initial area to target will follow up on Benz's successful
maiden program which intersected multiple spodumene bearing pegmatites with best intercept being
30m at 0.9% Li
2
O from 2.6m
depth in an area that hasn't been explored previously.
The planned C$10 million 2023 drilling and exploration campaign is fully funded following the Company's
successful capital raising of C$11.9 million in October 2022. The budget includes C$7 million for critical
minerals exploration and C$3 million for gold exploration.
Figure 3: EM21-229 - 81.3m visible gold. Best assay (by PhotonAssay) returned 1.0m at 365.5g/t gold
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1818/153145_e92b9d9314ab4be5_003full.jpg
Benz Mining Corp Chairman, Evan Cranston, commented:
"We are really excited to kick off our fully funded $10 million 2023 drill program. Initially, we will be
targeting gaps in our gold resource model that are too broad to be considered for resource
classification whilst we wait for assays from our 2022 drill program on the regional targets.
"We are also thrilled to have secured the services of Dahrouge Geological Consultants who have
been involved in several high-profile lithium discoveries in the James Bay Region. To have their
skillset will be invaluable to accelerate the lithium exploration on a greenstone belt that has seen less
than a handful of holes targeting this critical element."
About the E Zone Discovery:
The E Zone prospect is located 3km to the SE of the Mine portal and 1km to the SE of the D Zone
prospect. E Zone is a virgin discovery made by Benz under glacial cover following electromagnetics
targeting in 2020.
Figure 4: E Zone drilling coloured by max gold abundance over simplified geology and
electromagnetics modelled plates projected to surface
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1818/153145_e92b9d9314ab4be5_004full.jpg
To date, Benz has drilled 33 holes into E Zone with 11 of those holes returning assays of over 8.0g/t
gold.
Gold has been intersected in wide spaced drilling in an area that measures 700m by 600m from
surface down to 350m vertical depth and is still open at all sides.
Benz has followed mineralisation all the
way to subsurface with the shallowest mineralised horizon intercepted in drillhole EM21-234 with 1.6m at
2.9g/t from 4.4m.
At E Zone, mineralisation occurs in several settings.
A strongly deformed and altered horizon mostly located at the contact of the volcanosedimentary
sequence and a deformed altered tonalite intrusion structurally interpreted as sitting in the hanging
wall of the Mine horizon. This horizon is strongly altered in biotite, sericite and carbonate and is cut
by sulphide and quartz veins. Garnet porphyroblast are observed as well, sulphides are mostly
pyrrhotite, pyrite, chalcopyrite, sphalerite with rare molybdenite.
Visible gold has been observed in
this setting in several holes associated with quartz veins.
Strongly sericite, albite and carbonate altered and locally deformed tonalite with quartz, carbonate
and tourmaline veins and veinlets.
Pyrite, sphalerite and locally arsenopyrite (with pyrrhotite and
chalcopyrite) are observed in association with quartz veins.
Visible gold has been observed in
several holes in this setting.
This tonalite intrusion has a variable thickness over the area, dips parallel to foliation (45 dg to the NE)
and seems to pinch out to the west.
We have identified it over an area of 700 m by 500m.
Monzonite and
quartz diorite were observed in the margins of this intrusion.
Gold mineralisation can be found associated with shears and quartz - albite veins throughout the
intrusion but more abundantly in the upper half and closer to the sheared contact with the volcanic
sequence.
Best intersections are:
EM21-229: 1.0m at 365.5g/t gold (11.7oz/t)
starting at a shallow 81.0m in a sulphide bearing quartz
vein with visible gold.
EM21-200: 4.3m at 4.9g/t gold from 230.74 including 1.3m at 8.7g/t gold in a shear at the contact been
volcanics and a gabbro and 4.8m at 0.5g/t gold from 417.5 within altered tonalite.
EM21-207: 3.0m at 9.8 g/t gold from 345.0m including 0.8m at 35.8g/t gold in altered tonalite.
EM21-213: 1.8m at 3.9g/t gold from 97.2 meters in altered tonalite and 2.7m at 1.7g/t gold from 173.2m
in quartz veins with sulphides within the tonalite showing high-grade bearing structures within the
intrusion.
EM21-218: 4.8m at 4.7g/t Au from 130.9m including 1.0m at 10.4 g/t gold in sheared volcanics above
the tonalite contact and within 100m from surface showing shallow high-grade material at E Zone.
EM21-220: 1.1m at 9.5g/t gold from 24.4m in a sheared ultramafic with quartz and tourmaline veins and
2.0m at 6.7 g/t gold in sheared volcanics at 91.0m, highlighting multiple stacked high-grade structures
just below shallow (<20.0m) overburden at E Zone.
EM21-227: 3.8m at 5.4g/t gold from 222.8m in a shear zone including 1.3m at 18.3g/t gold.
EM21-233: 4.6m at 2.5g/t gold starting at 397.68 in a shear zone includes 0.9m at 8.1g/t gold.
EM21-234: 1.6m at 2.9g/t gold starting at a very shallow 4.4m and 0.88 g/t Au over 7 m from 70.7 m
highlighting potential for bulk low-grade material within the body of the tonalite, a common setting in
Archean greenstone belts where later felsic intrusions can be host to disseminated low grade gold over
the whole body of the intrusion.
Figure 5: E Zone cross section with geology, DHEM conductors and highlight intervals
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1818/153145_e92b9d9314ab4be5_005full.jpg
Mineral Resource estimate update:
The Mineral Resource estimate is well underway with all geological modelling finalised and the mineral
resource modelling to commence shortly. The Company expects preliminary results to be available
during Q1 2023.
This release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P.Geo, acting
as Benz's qualified person under National Instrument 43-101 for the reporting of exploration and drilling
results.
Benz Mining will keep the market updated with upcoming assay results as they become available.
This announcement has been authorised for release by the Board of Benz Mining Corp.
For more information please contact:
Evan Cranston
Executive Chairman,
Benz Mining Corp.
Telephone: +61 8 6143 6702
Email:
Dannika Warburton
Principal
Investability Partners
Email:
Telephone: +61 401 094 261
About Benz Mining Corp.
Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and
finance professionals with a focused strategy to unlock the immense mineral potential of the Upper
Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper and
other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain
gold mine, Ruby Hill West and Ruby Hill East projects in Quebec and owns 100% of the Windy Mountain
project.
At the Eastmain Gold Project, Benz has identified a combination of over 380 modelled in-hole and off-
hole DHEM conductors over a strike length of 6km which is open in all directions (final interpretation of
some of the conductors still pending).
In 2021, Benz confirmed the presence of visible spodumene in a pegmatite at the Ruby Hill West
Project, indicating lithium mineralisation which Benz intends to further explore in 2022.
Benz tenure over Upper Eastmain Greenstone Belt simplified geology.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1818/153145_e92b9d9314ab4be5_006full.jpg
About Eastmain Gold Project
The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada,
currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9gpt gold (Indicated:
236,500oz at 8.2gpt gold, Inferred: 139,300oz at 7.5gpt gold). The existing gold mineralisation is
associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed
and altered rocks making it amenable to detection using electromagnetic techniques.
Multiple gold
occurrences have been identified by previous explorers over a 12km long zone along strike from the
Eastmain Mine with very limited but highly encouraging testing outside the existing resource area.
About Ruby Hill West Lithium Project
The Ruby Hill West Lithium project is a surface occurrence of spodumene bearing pegmatite within the
Ruby Hill West project, located 50km due west of the Eastmain exploration camp. The occurrence was
first sampled in 2016 by Eastmain Resources and then by Quebec government geologists in 2018.
Only
limited sampling was conducted by both groups.
In March 2022 Benz conducted a drilling program at the Ruby Hill West lithium pegmatite prospect and
reported a
31.2m at 0.9% Li
2
O
interval of visible spodumene rich pegmatite in the drilling (ASX & TSX-
V releases dated 29 April 2022 "Multiple spodumene pegmatites intersected at Ruby Hill West").
Core samples from this drilling program have been submitted to the laboratory in late April and early May
and results are expected shortly.
Competent Person's Statement:
The information in this announcement that relates to historical
exploration results was first reported to the ASX in accordance with ASX Listing Rule 5.7 on 7 June
2022. The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements. The mineral resource estimate in this
announcement was reported by the Company in accordance with listing rule 5.8 on 21 December 2020.
The Company confirms it is not aware of any new information or data that materially affects the
information included in the previous announcement and that all material assumptions and technical
parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
Forward-Looking Information:
Certain statements contained in this news release may constitute
"forward-looking information" as such term is used in applicable Canadian securities laws. Forward-
looking information is based on plans, expectations and estimates of management at the date the
information is provided and is subject to certain factors and assumptions, including, that the Company's
financial condition and development plans do not change as a result of unforeseen events and that the
Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and
uncertainties and other factors that could cause plans, estimates and actual results to vary materially
from those projected in such forward-looking information. Factors that could cause the forward-looking
information in this news release to change or to be inaccurate include, but are not limited to, the risk that
any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those
referred to above are realized and result in delays, or cessation in planned work, that the Company's
financial condition and development plans change, and delays in regulatory approval, as well as the
other risks and uncertainties applicable to the Company as set forth in the Company's continuous
disclosure filings filed under the Company's profile at
www.sedar.com
. The Company undertakes no
obligation to update these forward-looking statements, other than as required by applicable law.
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS
THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS
RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/153145