Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BZ.V ·

Benz Drilling Highlights Exciting Expansion Potential at Glenburgh Gold Project

Drill Results

Benz Drilling Highlights Exciting Expansion

Potential at Glenburgh Gold Project

HIGHLIGHTS:

Drilling at Zone 126 has intersected high-grade gold mineralisation in a position

consistent with Benz's structural interpretation for a third high grade mineralised lens,

returning 2m at 6.8g/t Au from 295m (GBZ014).

The intercept is interpreted to represent the outer edge of the lens, with potential for

mineralisation to thicken toward the core, a pattern observed in the two previously

defined lenses at Zone 126.

This result is highly encouraging and further validates the exploration model providing

compelling encouragement ahead of drilling recommencement in late May, where this

high-priority target will be the immediate focus.

Significant scale confirmed between Icon and Apollo, with drilling returning an intercept

of 220m at 0.37g/t Au from 181m (GBZ015), including 124m at 0.52g/t Au - highlighting the

scale potential of the Glenburgh mineralised system.

This wide zone of gold mineralisation sits directly within the strategic gap between the

Icon and Apollo deposits, reinforcing the potential to define a continuous, large scale

gold system. With the hole ending in mineralisation, the extent of the system remains

wide open and highly prospective.

Drill rig secured to recommence drilling in the later part of May 2025.

Figure 1

Long section view of Zone 126 with latest results in red. Previous results released by Benz on 6

November 2024 and 3 April 2025.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/249945_77ec6763d437fbc1_001full.jpg

Figure 2

Plan view of Zone 126.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/249945_77ec6763d437fbc1_002full.jpg

Figure 3

Plan view of the Icon-Apollo trend.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/249945_77ec6763d437fbc1_003full.jpg

Benz CEO, Mark Lynch-Staunton, commented:

"Intersecting high-grade gold in positions consistent with Benz's structural interpretation for a third high

grade mineralised lens is an exciting step for the team - it further supports our structural model and

exploration strategy. We're eager to get the rig turning again in late May to follow this up.

"At the same time, the wide mineralised intercepts between Icon and Apollo highlight the true scale

potential of the Glenburgh system. While high-grade discovery remains our priority, the emerging bulk

mineralisation potential adds another layer of growth and flexibility.

"Our geologists are actively mapping across the untested northeast fold plunge targets, with the

program set to continue unlocking new areas and building a strong pipeline of high-quality drill targets

throughout the year. With the RC rig scheduled to return in late May, we are well positioned to

maintain momentum and accelerate our exploration efforts.

"We firmly believe we are unlocking a genuine district-scale gold system at Glenburgh, with multi-

million ounce potential - and we are only just getting started."

Vancouver, British Columbia--(Newsfile Corp. - April 27, 2025) - Benz Mining Corp. (TSXV: BZ) (ASX:

BNZ) (

Benz

or the

Company

) is pleased to announce encouraging results for an additional three holes

being reported drilled as part of the cleansing requirements following its successful A$13.5 million

capital raise.

These holes targeted extensions at the Zone 126 area and the gap zone between the Icon and Apollo

deposits - and the results are highly promising.

At Zone 126, hole 14 has intersected mineralization suggesting the emergence of a potential third high-

grade lens. Early logging and geochemistry confirm we are in the "gap zone" between existing lenses,

similar to the gap between the first and second lenses where significant thick low grade gold was

intersected but only intersected narrower high grade. This area will now be a major focus of the

upcoming drill program, as we believe it could deliver additional high-grade ounces and materially grow

the deposit footprint.

At Icon-Apollo, two step-out holes aimed to test the mineralized corridor between the two known

deposits. Both successfully hit broad zones of low-grade mineralization. Notably, hole GBZ015

intersected

220 metres at 0.37g/t Au, ending in mineralization

- one of the thickest intervals recorded

on the project to date.

This new discovery highlights significant large-scale, low-grade potential complementing the high-grade

lenses, offering two clear paths to growing the resource base.

An aggressive drill program is set to commence in May, targeting both high-grade and bulk-tonnage

opportunities, and is expected to run for the remainder of the year. In parallel, detailed structural mapping

is underway to refine future drill targeting and maximize exploration success.

Results for the remaining five holes from this phase are pending and will be reported as they become

available.

This announcement has been approved for release by the Board of Benz Mining Corp.

For more information please contact:

Mark Lynch-Staunton

Chief Executive Officer

Benz Mining Corp.

E:

[email protected]

T: +61 8 6143 6702

About Benz Mining Corp.

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) is a pure-play gold exploration company dual-listed on the

TSX Venture Exchange and Australian Securities Exchange. The Company owns the Eastmain Gold

Project in Quebec, and the recently acquired Glenburgh and Mt Egerton Gold Projects in Western

Australia.

Benz's key point of difference lies in its team's deep geological expertise and the use of advanced

geological techniques, particularly in high-metamorphic terrane exploration. The Company aims to

rapidly grow its global resource base and solidify its position as a leading gold explorer across two of

the world's most prolific gold regions.

The Glenburgh Gold Project features a Historical (for the purposes of NI 43-101) Mineral Resource

Estimate of 16.3Mt at 1.0 g/t Au (510,100 ounces of contained gold)

1

. A technical report prepared under

NI 43-101-

Standards of Disclosure for Mineral Projects

(

NI 43-101

) titled "NI 43-101 Technical Report

on the Glenburgh - Egerton Gold Project, Western Australia" with an effective date of 16 December

2024 has been filed with the TSX Venture Exchange and is available under the Company's profile at

www.sedarplus.ca

.

The Eastmain Gold Project in Quebec hosts a Mineral Resource Estimate dated effective May 24, 2023

and prepared in accordance with NI 43-101 and JORC (2012) of 1,005,000 ounces at 6.1g/t Au

2

, also

available under the Company's profile at

www.sedarplus.ca

, showcasing Benz's focus on high-grade,

high-margin assets in premier mining jurisdictions.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/249945_77ec6763d437fbc1_004full.jpg

For more information, please visit:

https://benzmining.com/

.

Qualified Person's Statement (NI 43-101)

The disclosure of scientific or technical information in this news release is based on, and fairly

represents, information compiled by Dr Marat Abzalov. Dr Abzalov, who is a Qualified Person as defined

by NI 43-101, and member in good standing as a Fellow of The Australasian Institute of Mining and

Metallurgy (#202718). Dr Abzalov has reviewed and approved the technical information in this news

release. Dr Abzalov owns shares in Benz Mining Corp.

Historical Mineral Resource Estimates

All mineral resource estimates in respect of the Glenburgh Gold Project in this news release are

considered to be "historical estimates" as defined under NI 43-101. These historical estimates are not

considered to be current and are not being treated as such. These estimates have been prepared in

accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and

Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (

JORC Code

) and

have not been reported in accordance with NI 43-101.

A qualified person (as defined in NI 43-101)

(

Qualified Person

) has not done sufficient work to classify the historical estimates as current mineral

resources. A Qualified Person would need to review and verify the scientific information and conduct an

analysis and reconciliation of historical data in order to verify the historical estimates as current mineral

resources.

Forward-Looking Statements

Statements contained in this news release that are not historical facts are "forward-looking information"

or "forward-looking statements" (collectively

Forward-Looking Information

) as such term is used in

applicable Canadian securities laws. Forward-Looking Information includes, but is not limited to,

disclosure regarding the exploration potential of the Glenburgh Gold Project and the anticipated benefits

thereof, planned exploration and related activities on the Glenburgh Gold Project. In certain cases,

Forward-Looking Information can be identified by the use of words and phrases or variations of such

words and phrases or statements such as "anticipates", "complete", "become", "expects", "next steps",

"commitments" and "potential", in relation to certain actions, events or results "could", "may", "will",

"would", be achieved. In preparing the Forward-Looking Information in this news release, the Company

has applied several material assumptions, including, but not limited to, that the accuracy and reliability of

the Company's exploration thesis in respect of additional drilling at the Glenburgh Gold Project will be

consistent with the Company's expectations based on available information; the Company will be able to

raise additional capital as necessary; the current exploration, development, environmental and other

objectives concerning the Company's Projects (including Glenburgh and Mt Egerton Gold Projects) can

be achieved; and the continuity of the price of gold and other metals, economic and political conditions,

and operations.

Forward-Looking information is subject to a variety of risks and uncertainties and other factors that could

cause plans, estimates and actual results to vary materially from those projected in such forward-looking

information. Factors that could cause the forward-looking information in this news release to change or

to be inaccurate include, but are not limited to, the early stage nature of the Company's exploration of the

Glenburgh Gold Project, the risk that any of the assumptions referred to prove not to be valid or reliable,

that occurrences such as those referred to above are realized and result in delays, or cessation in

planned work, that the Company's financial condition and development plans change, and delays in

regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in

the Company's continuous disclosure filings filed under the Company's profile at

www.sedarplus.ca

and

www.asx.com.au

. Accordingly, readers should not place undue reliance on Forward-Looking Information.

The Forward-Looking information in this news release is based on plans, expectations, and estimates of

management at the date the information is provided and the Company undertakes no obligation to

update these forward-looking statements, other than as required by applicable law.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS

THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

Appendix 1: Collar Table.

Coordinates system: GDA94/MGA Zone 50

Hole number

Easting

Northing

Elevation

Max. Depth

Dip

Azimuth

GBZ126_014

414793

7193831

313

402

-70

134

GBZ126_015

409893

7191607

284

402

-58

160

GBZ126_016

409849

7191705

293

384

-65

185

Appendix 2: Significant Intercepts Tables

High Grade Intercepts: A nominal 1 g/t Au lower cut off has been applied to results, with up to 3m internal

dilution included.

Hole ID From T o Au ppm Interval

GBZ126_014 295 297 6.81 2

GBZ126_015 188 194 3.48 6

GBZ126_015 239 246 1.55 7

GBZ126_015 250 252 1.46 2

GBZ126_015 303 307 2.52 4

Bulk potential reported with a nominal 0.3 g/t Au lower cut off with no maximum internal dilution length

applied. Included higher grade intervals are calculated using a 0.5g/t lower cut off with no maximum

internal dilution length applied.

Hole ID From T o Au ppm Interval Note

GBZ126_014 294 396 0.32 102 Including 33m @ 0.67g/t from 295m

GBZ126_015 181 401 0.37 220 Including 124m @ 0.52g/t from 183m

GBZ126_016 261 292 0.32 31 Including 11m @ 0.58g/t from 261m

GBZ126_016 342 382 0.42 40 Including 15m @ 0.58g/t from 351m

Appendix 3: JORC Tables

JORC Code, 2012 Edition - Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Sampling techniques

Results are part of BNZ's inaugural RC drilling campaign at the

recently acquired Glenburgh Gold Project situated ~285 km east

of Carnarvon via Gascoyne Junction, WA.

RC drilling samples were collected as 1m single samples.

Each sample collected represents each one (1) metre drilled

collected from the rig-mounted cone splitter into individual calico

bags (~3kg) and stored in labelled sequential polyweave bags for

long-term storage.

The rig mounted cyclone/cone splitter was levelled at the start of

each hole to aid an even fall of the sample through the cyclone into

the cone splitter.

RC drilling sample submissions include the use of certified

standards (CRMs), and field duplicates were added to the

submitted sample sequence to test laboratory equipment

calibrations.

Standards selected are matched to the analytical

method of photon assaying at ALS labs in Perth (~500g units). No

composites were taken.

Based on statistical analysis of these results, there is no evidence

to suggest the samples are not representative.

Drilling techniques

The RC drill rig was a Schramm C685 Rig type with the capability

to reach >400m depths with a rig-mounted cyclone/cone splitter

using a face sample hammer bit of 5 1⁄2 - 6" size.

The booster was used to apply air to keep drill holes dry and

reach deeper depths.

Drill sample recovery

RC sample recovery is visually assessed and recorded where

significantly reduced. Negligible sample loss has been recorded.

RC samples were visually checked for recovery, moisture and

contamination.

A cyclone and cone splitter were used to provide a

uniform sample, and these were routinely cleaned.

RC Sample recoveries are generally high. No significant sample

loss has been recorded.

Criteria

Commentary

Logging RC chip samples have been geologically logged on a per 1 metre

process recording lithology, mineralisation, veining, alteration, and

weathering.

Geological logging is considered appropriate for this style of

deposit (metamorphosed orogenic gold). The entire length of all

holes has been geologically logged.

RC drill logging was completed by Galt Mining Solutions staff and

data entered into BNZ's MXDeposit digital data collection

platform provided by Expedio.

All drill chips were collected into 20 compartment-trays for future

reference and stored at Galt's warehouse in West Leederville at

the time of reporting.

Sub-sampling techniques

and sample preparation RC chips were cone split at the rig. Samples were generally dry.

A sample size of between 3 and 5 kg was collected. This size is

considered appropriate, and representative of the material being

sampled given the width and continuity of the intersections, and

the grain size of the material being collected.

For the 1 metre samples, certified analytical standards

(appropriate for photon assaying) and field duplicates were

inserted at appropriate intervals at a rate equal to 1 in 20 and sent

for analysis with the samples.

Sample preparation was undertaken at ALS Laboratory - Perth.

Gold analysis utilised the photon assaying methodology where

original samples are crushed to 2mm with a sub-set 500g

separated for non-destructive analysis.

Any sample reporting as having elevated > 1µSv readings during

the preparation for photon assaying at ALS labs were flagged and

were submitted for fire assay (Au-AA26) methodology at ALS

labs in Perth as a quantifying check against the Photon assays.

Quality of assay data and

laboratory tests

Criteria Commentary

Preliminary pXRF and Labspec ASD analysis was conducted by

Galt Mining Solutions personnel utilising Geotek's Boxscan

automated system.

The scanning of sieved RC drilling fines sample material utilised

an Olympus Vanta M Series portable XRF in Geochem mode (3

beam) and a 20-second read time for each beam

(Instrument_Serial = 840951).

The ASD data reader on Boxscan has a 3 nm VNIR, 6 nm SWIR

spectral resolution of the LabSpec 4 Hi-Res analytical instrument

(Electronics serial number: 28191).

The pXRF and ASD are incorporated into Geotek's Boxscan

machine to facilitate an automated data collection process.

This