Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BZ.V ·

Benz Delivers a New High Grade Gold Discovery at Glenburgh

Drill Results

Benz Delivers a New High Grade Gold

Discovery at Glenburgh

HIGHLIGHTS:

New High-Grade Gold Discovery:

Benz initial results from maiden drilling at the Zone 126 target

at the Glenburgh Gold Project have revealed a significant new high-grade gold lens approximately

80m down-plunge

from

previously interpreted gold

mineralisation

.

Significant intercepts include:

11m at 19.9g/t gold from 274m (GBZ126_010)

5m at 10.2g/t gold from 222m and 7m at 3.5g/t gold from 233m (GBZ126_001)

4m at 12.2g/t gold from 319m (GBZ126_009)

8m at 5.6g/t gold from 243m (GBZ126_013)

Targeting Model Confirmed:

Drilling at Zone 126 has validated Benz's initial structural

interpretation,

confirming a previously unrecognised overall NE plunge

to the mineralised

system compared to previous exploration which focused mainly on shoots plunging to the SW.

First Drilling with New Insights:

Importantly, this is the first time the Glenburgh gold system has

been drilled using this refined model,

opening up the entire Glenburgh 18km mineralised

corridor to untested fold plunge targets.

Significant Discovery Potential:

With a confirmed exploration model and multiple untested gold

targets, Benz is now positioned to unlock a potentially much larger mineralised system with

substantial upside.

Advanced Surface Mapping Underway:

Extensive outcrop exposure across the project area is

enabling detailed surface geological mapping to be conducted. Early work confirms that the NE

fold geometries are visible at surface-providing a powerful tool to pinpoint the next round of

untested down-plunge drill targets.

Figure 1.

Long section Z126 Drilling.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/247193_b6f87f29a438ba3e_001full.jpg

Vancouver, British Columbia--(Newsfile Corp. - April 2, 2025) - Benz Mining Corp (ASX: BNZ) (TSXV:

BZ) ("Benz" or the "Company") is pleased to report the first results from its maiden 8,500m RC drilling

program at the 100%-owned Glenburgh Gold Project in Western Australia. This announcement covers

results from 13 of the 21 holes completed to date, with assays from the remaining holes expected

towards the end of this Quarter.

Zone 126 was discovered by previous owners, Gascoyne Resources Limited and Helix Resources

Limited, and includes previous wide high-grade gold intercepts such as:

1

24m at 9.1g/t

gold (VRC535)

10m at 11.6g/t

gold (VRC201)

28m at 5.0g/t

gold (VRC 580)

12m at 8.1g/t

gold (VRC174)

8m at 11.6g/t

gold (VRC 176)

14m at 8.9g/t

gold (VRC578)

Mineralisation at Zone 126 (

Figure 2

) outcrops at surface and was previously drilled to approximately

200m below surface where the mineralisation appeared to pinch out at depth along a steep SW-plunge.

During due diligence for the acquisition of the Glenburgh Gold Project, Benz structural geologists

identified the folded geometry of gneissic rocks hosting gold mineralisation was plunging shallow to the

NE suggesting continuity of Zone 126 in this direction, a model promptly validated by drilling in March

2025.

Figure 2

. Plan viewing showing the extent of the known mineralised trend as detailed in historical

surface Au sampling (>25ppb)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/247193_b6f87f29a438ba3e_002full.jpg

Shown below in

Figure 3

, is a plan view detailing the drill collar locations and the newly discovered high-

grade gold lens at Zone 126. Figure 3 also outlines the conceptual position identified by the new

structural model which will be the next priority drill target down plunge. This highlights the significant

potential for further high-grade discoveries along the untested north-east plunge corridor.

High-grade gold intercepts at Zone 126 are hosted within a broad mineralised envelope, up to 70m

wide, of elevated gold. Within this envelope, significant patches of higher-grade material ranging

between 1-10g/t gold have been intersected, highlighting the scale, continuity, and potential for bulk-

disseminated style gold mineralisation.

All holes to date have been drilled via reverse circulation drilling to depths in excess of 500m, while

maintaining full recovered and dry samples. This has allowed Benz to rapidly and cost-effectively test

targets at depths that are often beyond this drilling methods range.

Figure 3.

Plan view of reported holes, with position of new discovery lens.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/247193_b6f87f29a438ba3e_003full.jpg

Benz CEO, Mark Lynch-Staunton, commented:

"We are absolutely thrilled with the results of our maiden drilling program at Zone 126. Not only have

we hit one of the highest ever gold intercepts on the entire project to date in our maiden program, but

more importantly, we have confirmed our concept that completely turns the structural understanding of

the Glenburgh Gold Project on its head. This extension is a significant high-grade gold discovery. It's

the first time this gold deposit has been drilled with our refined targeting approach, and the results

speak for themselves.

"Not only have we intersected exceptional grades, but we've also opened up the entire 18km

mineralised gold corridor to untested north-east fold plunge targets. With advanced surface mapping

now underway and clear structural controls visible at surface, we're in a strong position to identify and

drill the next round of high-potential targets. This is a huge step forward for the Glenburgh Gold

Project, and we believe we're just scratching the surface of the true potential of what we believe could

be a multi-million ounce gold system."

The Company has also agreed to issue a total of 8,000,000 options to certain consultants of the

Company. All were granted in accordance with the Company's Omnibus Equity Incentive Compensation

Plan and are in accordance with policies of the TSX Venture Exchange. 4,000,000 options have an

exercise price of C$0.45 and 4,000,000 options have an exercise price of C$0.90, with all options

expiring on 2 April 2028.

This announcement has been approved for release by the Board of Benz Mining Corp.

For more information please contact:

Mark Lynch-Staunton

Chief Executive Officer

Benz Mining Corp.

E:

[email protected]

T: +61 8 6143 6702

About Benz Mining Corp.

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) is a pure-play gold exploration company dual-listed on the

TSX Venture Exchange and Australian Securities Exchange.

On 6 November 2024, Benz announced a binding agreement to acquire the Glenburgh and Mt Egerton

Gold Projects in Western Australia from Spartan Resources Limited (ASX: SPR), which was completed

on 14 January 2025 and marks a transformational step, establishing Benz as a multi-jurisdictional gold

exploration company with a focus on unlocking value in underexplored assets. The Glenburgh Gold

Project features a Historical (for the purposes of NI 43-101) Mineral Resource Estimate of 16.3Mt at 1.0

g/t Au (510,100 ounces of contained gold)

2

. A technical report prepared under NI 43-101-

Standards of

Disclosure for Mineral Projects

(

NI 43-101

) titled "NI 43-101 Technical Report on the Glenburgh -

Egerton Gold Project, Western Australia" with an effective date of 16 December 2024 has been filed

with the TSX Venture Exchange and is available under the Company's profile at

www.sedarplus.ca

.

Benz's key point of difference lies in its team's deep geological expertise and the use of advanced

geological techniques, particularly in high-metamorphic terrane exploration. The Company aims to

rapidly grow its global resource base and solidify its position as a leading gold explorer across two of

the world's most prolific gold regions.

The Company also owns the Eastmain Gold Project in Quebec, with a Mineral Resource Estimate dated

effective May 24, 2023 and prepared in accordance with NI 43-101 and JORC (2012) of 1,005,000

ounces at 6.1g/t Au

3

, also available under the Company's profile at

www.sedarplus.ca

, showcasing

Benz's focus on high-grade, high-margin assets in premier mining jurisdictions.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/247193_b6f87f29a438ba3e_004full.jpg

For more information, please visit:

https://benzmining.com/

.

Competent Person's Statement (JORC Code)

The information contained in this announcement that relates to new Exploration Results for the Glenburgh

Gold Project, is based on and fairly reflects, information compiled by Dr Marat Abzalov. Dr Abzalov is an

independent consultant (MASSA Geoservices) and was engaged by Benz Mining Corp. Dr Abzalov is a

Fellow of The Australasian Institute of Mining and Metallurgy (#202718) and has sufficient experience

which is relevant to the style of mineralisation and type of deposit under consideration. Dr Abzalov has

shares in Benz Mining Corp. Dr Abzalov consents to the inclusion in the report of the matters based on

his information in the form and context in which it appears

The Mineral Resource Estimates for the Eastmain Project and the Glenburgh Gold Project were

previously reported in accordance with Listing Rule 5.8 on 24 May 2023 and 6 November 2024,

respectively. The Company confirms that it is not aware of any new information or data that materially

affects the information included in the original market announcements and confirms that all material

assumptions and technical parameters underpinning the Estimates continue to apply and have not

materially changed. The Company confirms that the form and context in which the Competent Person's

findings are presented have not been materially modified from the original market announcements.

The information in this announcement that relates to historical exploration results for the Glenburgh Gold

Project was first reported to the ASX in accordance with ASX Listing Rule 5.7 on 6 November 2024. The

Company confirms that it is not aware of any new information or data that materially affects the

information included in the original market announcement.

Qualified Person's Statement (NI 43-101)

The disclosure of scientific or technical information in this news release is based on, and fairly

represents, information compiled by Dr Marat Abzalov. Dr Abzalov, who is a Qualified Person as defined

by NI 43-101, and member in good standing as a Fellow of The Australasian Institute of Mining and

Metallurgy (#202718). Dr Abzalov has reviewed and approved the technical information in this news

release. Dr Abzalov owns shares in Benz Mining Corp.

Historical Mineral Resource Estimates

All mineral resource estimates in respect of the Glenburgh Gold Project in this news release are

considered to be "historical estimates" as defined under NI 43-101. These historical estimates are not

considered to be current and are not being treated as such. These estimates have been prepared in

accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and

Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (

JORC Code

) and

have not been reported in accordance with NI 43-101.

A qualified person (as defined in NI 43-101)

(

Qualified Person

) has not done sufficient work to classify the historical estimates as current mineral

resources. A Qualified Person would need to review and verify the scientific information and conduct an

analysis and reconciliation of historical data in order to verify the historical estimates as current mineral

resources.

Forward-Looking Statements

Statements contained in this news release that are not historical facts are "forward-looking information"

or "forward looking statements" (collectively

Forward-Looking Information

) as such term is used in

applicable Canadian securities laws. Forward-Looking Information includes, but is not limited to,

disclosure regarding the exploration potential of the Glenburgh Gold Project and the anticipated benefits

thereof, planned exploration and related activities on the Glenburgh Gold Project. In certain cases,

Forward-Looking Information can be identified by the use of words and phrases or variations of such

words and phrases or statements such as "anticipates", "complete", "become", "expects", "next steps",

"commitments" and "potential", in relation to certain actions, events or results "could", "may", "will",

"would", be achieved. In preparing the Forward-Looking Information in this news release, the Company

has applied several material assumptions, including, but not limited to, that the accuracy and reliability of

the Company's exploration thesis in respect of additional drilling at the Glenburgh Gold Project will be

consistent with the Company's expectations based on available information; the Company will be able to

raise additional capital as necessary; the current exploration, development, environmental and other

objectives concerning the Company's Projects (including Glenburgh and Mt Egerton Gold Projects) can

be achieved; and the continuity of the price of gold and other metals, economic and political conditions,

and operations.

Forward-looking information is subject to a variety of risks and uncertainties and other factors that could

cause plans, estimates and actual results to vary materially from those projected in such forward-looking

information. Factors that could cause the forward-looking information in this news release to change or

to be inaccurate include, but are not limited to, the early stage nature of the Company's exploration of the

Glenburgh Gold Project, the risk that any of the assumptions referred to prove not to be valid or reliable,

that occurrences such as those referred to above are realized and result in delays, or cessation in

planned work, that the Company's financial condition and development plans change, and delays in

regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in

the Company's continuous disclosure filings filed under the Company's profile at

www.sedarplus.ca

and

www.asx.com.au

. Accordingly, readers should not place undue reliance on Forward-Looking Information.

The Forward-looking information in this news release is based on plans, expectations, and estimates of

management at the date the information is provided and the Company undertakes no obligation to

update these forward-looking statements, other than as required by applicable law.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS

THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

Appendix 1: Collar Table.

Coordinates system: GDA94/MGA Zone 50

Hole number

Easting

Northing

Elevation

Max. depth

Dip

Azimuth

Comment

GBZ126_001

414751

7193776

317

396

-70

145

GBZ126_002

414750

7193823

319

396

-72

145

GBZ126_003

414616

7193732

322

420

-72

145

GBZ126_004

414704

7193770

316

396

-71

144

GBZ126_005

414669

7193870

318

574

-75

145

Full Assay results pending

GBZ126_006

414622

7193769

320

426

-65

145

GBZ126_007

414724

7193798

317

366

-55

145

GBZ126_008

414797

7193813

321

324

-60

145

GBZ126_009

414688

7193875

307

402

-57

145

GBZ126_010

414662

7193769

308

510

-65

145

GBZ126_011

414618

7193784

312

462

-59

145

GBZ126_012

414683

7193816

313

420

-65

145

GBZ126_013

414760

7193821

313

318

-65

145

GBZ126_014

414793

7193831

313

402

-70

134

Full Assay results pending

Appendix 2: Significant Intercepts Table.

Results reported >0.5g/t Au with 3m of allowed dilution.

Hole ID

From

To

Au ppm

Interval

Comment

GBZ126_001

222

227

10.25

5.00

New HG Lens

GBZ126_001

233

240

3.53

7.00

GBZ126_001

246

249

3.94

3.00

GBZ126_001

290

293

0.92

3.00

GBZ126_002

171

173

3.50

2.00

GBZ126_002

233

236

2.74

3.00

GBZ126_002

263

268

1.84

5.00

GBZ126_002

293

296

1.81

3.00

New HG Lens

GBZ126_002

356

358

2.26

2.00

GBZ126_003

255

258

1.69

3.00

GBZ126_003

285

287

2.49

2.00

GBZ126_003

290

295

2.29

5.00

GBZ126_003

318

320

1.96

2.00

GBZ126_003

330

337

1.36

7.00

GBZ126_003

348

352

0.77

4.00

GBZ126_003

365

368

1.11

3.00

GBZ126_004

179

181

3.23

2.00

GBZ126_005

542

544

0.76

2.00

GBZ126_006

308

312

0.66

4.00

GBZ126_006

317

322

1.69

5.00

GBZ126_006

350

358

1.08

8.00

GBZ126_006

360

367

0.94

7.00

GBZ126_007

184

187

3.82

3.00

GBZ126_007

210

215

0.63

5.00

GBZ126_007

231

233

0.63

2.00

GBZ126_008

187

189

1.29

2.00

GBZ126_008

216

218

4.46

2.00

GBZ126_009

254

257

2.01

3.00

GBZ126_009

319

323

12.18

4.00

New HG Lens

GBZ126_009

346

351

2.15

5.00

GBZ126_010

274

285

19.93

11.00

New HG Lens

GBZ126_011

227

234

1.41

7.00

GBZ126_011

310

316

0.78

6.00

GBZ126_011

319

323

2.66

4.00

GBZ126_011

354

357

1.48

3.00

GBZ126_012

228

230

0.72

2.00

GBZ126_012

243

245

2.37

2.00

GBZ126_012

278

281

5.90

3.00

GBZ126_012

285

288

1.97

3.00

GBZ126_012

306

308

2.36

2.00

GBZ126_012

352

364

2.61

12.00

New HG Lens

GBZ126_012

365

372

0.63

7.00

GBZ126_012

375

378

3.55

3.00

GBZ126_013

243

251

5.64

8.00

New HG Lens

Appendix 3: Individual 1m assay results for selected high grade significant intercepts.

Hole number

From

To

Au ppm

GBZ126_001

222

223

3.2

GBZ126_001

223

224

20.9

GBZ126_001

224

225

16.7

GBZ126_001

225

226

9.3

GBZ126_001

226

227

1.1

GBZ126_009

319

320

4.5

GBZ126_009

320

321

38.8

GBZ126_009

321

322

4.6

GBZ126_009

322

323

0.8

GBZ126_010

274

275

15.4

GBZ126_010

275

276

16.4

GBZ126_010

276

277

88.6

GBZ126_010

277

278

40.0

GBZ126_010

278

279

2.8

GBZ126_010

279

280

2.2

GBZ126_010

280

281

9.1

GBZ126_010

281

282

3.3

GBZ126_010

282

283

12.3

GBZ126_010

283

284

27.0

GBZ126_010

284

285

2.2

GBZ126_013

243

244

11.2

GBZ126_013

244

245

2.5

GBZ126_013

245

246

1.6

GBZ126_013

246

247

13.7

GBZ126_013

247

248

7.7

GBZ126_013

248

249

2.7

GBZ126_013

249

250

4.9

GBZ126_013

250

251

0.8

Hole number

From

To

Au ppm

Appendix 4: JORC Tables

JORC Code, 2012 Edition - Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria

Commentary

Sampling

techniques

Results are part of BNZ's inaugural RC drilling campaign at the recently

acquired Glenburgh Gold Project situated ~285 km east of Carnarvon via

Gascoyne Junction, WA.

RC drilling samples were collected as 1m single samples.

Each sample collected represents each one (1) metre drilled collected from

the rig-mounted cone splitter into individual calico bags (~3kg) and stored in

labelled sequential polyweave bags for long-term storage.

The rig mounted cyclone/cone splitter was levelled at the start of each hole to

aid an even fall of the sample through the cyclone into the cone splitter.

RC drilling sample submissions include the use of certified standards

(CRMs), and field duplicates were added to the submitted sample sequence

to test laboratory equipment calibrations.

Standards selected are matched

to the analytical method of photon assaying at ALS labs in Perth (~500g

units). No composites were taken.

Based on statistical analysis of these results, there is no evidence to

suggest the samples are not representative.