Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BZ.V ·

200m+ Gold Intercepts Support Glenburgh's Emergence as a Major Gold System Bulk open pit potential emerging at Icon / Apollo Trend

Drill Results

200m+ Gold Intercepts Support Glenburgh's

Emergence as a Major Gold System

Bulk open pit potential emerging at Icon / Apollo Trend

HIGHLIGHTS:

New step-out holes drilled at Icon targeting a large gap under previous drilling returned

thick, high-grade gold, confirming mineralisation continuity and significant potential for

resource growth. All holes ending in mineralisation, significant intercepts include:

154m at 1.1g/t gold from 76m including 5m at 22g/t gold (25GLR_062)

134m at 1g/t gold from 66m including 44m at 2.2g/t gold (25GLR_060)

117m at 0.7g/t gold from 107m including 38m at 1.1g/t gold (25GLR_064)

In addition, the drilling at Icon delivered multiple gold intercepts exceeding 200m, all

ending in mineralisation, including:

206m at 0.5g/t gold from 194m including 19m at 0.9g/t gold and 43m at 0.9g/t gold

(25GLR_036)

272m at 0.5g/t gold from 157m including 41m at 1.6g/t gold (25GLR_032)

306m at 0.4g/t gold from 222m including 39m at 1.3g/t gold and 10m at 2.8g/t gold

(25GLR_034)

Geological modelling indicates that these zones remain open at depth, with strong

potential for further extensions. Mineralisation is interpreted to link with the nearby

Tuxedo deposit in a synformal geometry, outlining a potential 400 m wide mineralised

envelope. This envelope comprises up to three broad higher-grade zones (100m wide,

grading 0.8-1.5g/t gold), interconnected by a continuous lower-grade halo averaging 0.2-

0.3g/t gold.

Drilling to continue with two RC drill rigs fully funded by recent A$13.5M raising

Vancouver, British Columbia--(Newsfile Corp. - August 3, 2025) -

Benz Mining Corp (ASX: BNZ)

(TSXV: BZ) ("Benz"

or the

"Company")

is pleased to report further strong results from ongoing drilling

at the Icon Prospect within the Glenburgh Gold Project in Western Australia. Icon is located

approximately 6km from the recently announced Zone 126 high grade trend and forms part of 18km of

known gold trend at the Glenburgh Gold Project.

Figure 1

Section view looking north east at Icon Deposit, viewing window +/- 200m from section line.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/261117_2cf84bccf41ada10_001full.jpg

The latest results have successfully confirmed the following major developments:

1

.

Mineralisation significantly exceeds previous defined boundaries with all intersections targeting

deeper zones ending in mineralisation.

2

.

Zones of mineralisation appear to be linking up with the nearby Tuxedo deposit, suggesting that

the system may grow to approximately 400m in width.

3

.

3 distinct higher grade 0.8 - 1.5g/t gold lenses emerging within this 400m package (see Figure 1).

4

.

A new zone potentially emerging to the north with a shallow hit of 4m at 2.5g/t gold.

Benz CEO, Mark Lynch-Staunton, commented:

"The latest results from Icon are extraordinary. Intercepts of over 200 metres of mineralisation, all

ending in gold, are the kind of outcome that would turn heads in any global gold district. These are the

widths that porphyry explorers spend years chasing, and we're seeing them in a structurally controlled

system with strong grade continuity.

"When combined with the continued success at Zone 126, including the discovery of a third high-

grade lens, it's clear Glenburgh is not just a collection of isolated deposits. It's a much larger, evolving

gold system. With over 20km of untested strike, multiple high-priority targets, and a structural model

that's delivering new discoveries, Glenburgh has all the hallmarks of a tier-1, multi-million-ounce gold

district.

"With every hole, our confidence in the scale and significance of this system continues to grow, and

we've only just scratched the surface."

Icon - a large bulk scale opportunity

The geometry, continuity, and thickness of the mineralisation at Icon — particularly in the near-surface

environment — strongly support the potential for a

low-strip, bulk-scale open-pit mining operation

.

This style of deposit is ideally suited to efficient, large-scale development and could deliver significant

gold ounces at relatively low cost per tonne.

Historical exploration at Icon appeared to be limited to previous pit shell designs with the majority of

holes ending in mineralisation at depth. Benz's current drilling is looking to unconstrain this

mineralisation with drilling significantly past the previously drilled boundaries (see Figure 1).

Planning is currently underway for step-out and infill drilling to test the full scale and continuity of the Icon

system, with further drilling aimed at expanding the mineralised footprint and upgrading the confidence of

mineralised volumes ahead of future resource modelling.

These results further reinforce the Company's view that Glenburgh is evolving into a district-scale gold

system, with Icon now emerging as a cornerstone deposit capable of supporting substantial, long-life

gold production.

Figure 2

Plan view of drilling collars and traces.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/261117_2cf84bccf41ada10_002full.jpg

Figure 3

Glenburgh Project Geology overview.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/261117_2cf84bccf41ada10_003full.jpg

This announcement has been approved for release by the Board of Benz Mining Corp.

For more information please contact:

Mark Lynch-Staunton

Chief Executive Officer

Benz Mining Corp.

E:

[email protected]

T: +61 8 6143 6702

About Benz Mining Corp.

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) is a pure-play gold exploration company dual-listed on the

TSX Venture Exchange and Australian Securities Exchange. The Company owns the Eastmain Gold

Project in Quebec, and the recently acquired Glenburgh and Mt Egerton Gold Projects in Western

Australia.

Benz's key point of difference lies in its team's deep geological expertise and the use of advanced

geological techniques, particularly in high-metamorphic terrane exploration. The Company aims to

rapidly grow its global resource base and solidify its position as a leading gold explorer across two of

the world's most prolific gold regions.

The Glenburgh Gold Project features a Historical (for the purposes of NI 43-101) Mineral Resource

Estimate of 16.3Mt at 1.0 g/t Au (510,100 ounces of contained gold)

1

. A technical report prepared under

NI 43-101-

Standards of Disclosure for Mineral Projects

(

NI 43-101

) titled "NI 43-101 Technical Report

on the Glenburgh - Egerton Gold Project, Western Australia" with an effective date of 16 December

2024 has been filed with the TSX Venture Exchange and is available under the Company's profile at

www.sedarplus.ca

.

The Eastmain Gold Project in Quebec hosts a Mineral Resource Estimate dated effective May 24, 2023

and prepared in accordance with NI 43-101 and JORC (2012) of 1,005,000 ounces at 6.1g/t Au

2

, also

available under the Company's profile at

www.sedarplus.ca

, showcasing Benz's focus on high-grade,

high-margin assets in premier mining jurisdictions.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1818/261117_2cf84bccf41ada10_004full.jpg

For more information, please visit:

https://benzmining.com/

.

Qualified Person's Statement (NI 43-101)

The disclosure of scientific or technical information in this news release is based on, and fairly

represents, information compiled by Mr Mark Lynch-Staunton, who is a Qualified Person as defined by

NI 43-101 and a Member of Australian Institute of Geoscientists (AIG) (Membership ID: 6918). Mr Lynch-

Staunton has reviewed and approved the technical information in this news release. Mr Lynch-Staunton

owns securities in Benz Mining Corp.

Historical Mineral Resource Estimates

All mineral resource estimates in respect of the Glenburgh Gold Project in this news release are

considered to be "historical estimates" as defined under NI 43-101. These historical estimates are not

considered to be current and are not being treated as such. These estimates have been prepared in

accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and

Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia (JORC Code) and have

not been reported in accordance with NI 43-101. A qualified person (as defined in NI 43-101) (Qualified

Person) has not done sufficient work to classify the historical estimates as current mineral resources. A

Qualified Person would need to review and verify the scientific information and conduct an analysis and

reconciliation of historical data in order to verify the historical estimates as current mineral resources.

Forward-Looking Statements

Statements contained in this news release that are not historical facts are "forward-looking information"

or "forward looking statements" (collectively

Forward-Looking Information

) as such term is used in

applicable Canadian securities laws. Forward-Looking Information includes, but is not limited to,

disclosure regarding the exploration potential of the Glenburgh Gold Project and the anticipated benefits

thereof, planned exploration and related activities on the Glenburgh Gold Project. In certain cases,

Forward-Looking Information can be identified by the use of words and phrases or variations of such

words and phrases or statements such as "anticipates", "complete", "become", "expects", "next steps",

"commitments" and "potential", in relation to certain actions, events or results "could", "may", "will",

"would", be achieved. In preparing the Forward-Looking Information in this news release, the Company

has applied several material assumptions, including, but not limited to, that the accuracy and reliability of

the Company's exploration thesis in respect of additional drilling at the Glenburgh Gold Project will be

consistent with the Company's expectations based on available information; the Company will be able to

raise additional capital as necessary; the current exploration, development, environmental and other

objectives concerning the Company's Projects (including Glenburgh and Mt Egerton Gold Projects) can

be achieved; and the continuity of the price of gold and other metals, economic and political conditions,

and operations.

Forward-looking information is subject to a variety of risks and uncertainties and other factors that could

cause plans, estimates and actual results to vary materially from those projected in such forward-looking

information. Factors that could cause the forward-looking information in this news release to change or

to be inaccurate include, but are not limited to, the early stage nature of the Company's exploration of the

Glenburgh Gold Project, the risk that any of the assumptions referred to prove not to be valid or reliable,

that occurrences such as those referred to above are realized and result in delays, or cessation in

planned work, that the Company's financial condition and development plans change, and delays in

regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in

the Company's continuous disclosure filings filed under the Company's profile at

www.sedarplus.ca

and

www.asx.com.au

. Accordingly, readers should not place undue reliance on Forward-Looking Information.

The Forward-looking information in this news release is based on plans, expectations, and estimates of

management at the date the information is provided and the Company undertakes no obligation to

update these forward-looking statements, other than as required by applicable law.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS

THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

Appendix 1: Collar Table.

Coordinates system: GDA94/MGA Zone 50

Hole number

Easting

Northing

Elevation (m)

End Depth (m)

Dip

Azimuth

25GLR_064

409586.94

7191507.83

293

366

58

158

25GLR_062

409603.42

7191477.59

293

420

63

161

25GLR_060

409621.68

7191475.74

292

216

63

161

25GLR_036

409701.46

7191553.84

293

402

60

170

25GLR_034

409498.66

7191542.61

292

530

61

164

25GLR_032

409580.42

7191568.88

292

432

59

163

Appendix 2: Significant Intercepts Tables.

Higher Grade Intercepts

: A nominal 0.9g/t Au lower cut off has been applied to results, with no

maximum internal dilution included unless otherwise stated.

Hole ID

From (m)

To (m)

Length (m)

Au (ppm)

25GLR_064

108

146

38

1.1

25GLR_064

178

185

7

1.7

25GLR_064

203

210

7

1.5

25GLR_062

84

88

4

1.4

25GLR_062

94

210

116

1.3

25GLR_060

69

71

2

2.0

25GLR_060

85

99

14

1.2

25GLR_060

135

179

44

2.2

25GLR_036

164

166

2

1.2

25GLR_036

202

204

2

1.2

25GLR_036

208

227

19

0.9

25GLR_036

352

395

43

0.9

25GLR_034

7

11

4

2.5

25GLR_034

175

179

4

2.0

25GLR_034

231

270

39

1.3

25GLR_034

309

311

2

1.3

25GLR_034

315

317

2

1.4

25GLR_034

494

504

10

2.8

25GLR_033

426

512

86

1.1

25GLR_032

175

216

41

1.6

25GLR_032

282

285

3

2.0

25GLR_032

341

343

2

1.3

Bulk potential intercepts

reported with a nominal 0.3g/t Au lower cut off with no maximum internal

dilution length applied.

Hold ID

From (m)

To (m)

Length (m)

Au (ppm)

Comment

25GLR_064

107

224

117

0.7

Ending in mineralisation

25GLR_062

76

230

154

1.1

Ending in mineralisation

25GLR_060

66

200

134

1.0

Ending in mineralisation

25GLR_036

163

166

3

1.0

Ending in mineralisation

25GLR_036

194

400

206

0.5

Ending in mineralisation

25GLR_034

4

37

33

0.4

Ending in mineralisation

25GLR_034

149

179

30

0.3

Ending in mineralisation

25GLR_034

222

528

306

0.4

Ending in mineralisation

25GLR_032

157

429

272

0.5

Ending in mineralisation

Appendix 3: JORC Tables

JORC Code, 2012 Edition - Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria

Commentary

Sampling techniques

Results are part of BNZ's RC drilling campaign at the recently acquired Glenburgh Gold Project situated ~285

km east of Carnarvon via Gascoyne Junction, WA.

RC drilling samples were collected as 1m single samples.

Each sample collected represents each one (1) metre drilled collected from the rig-mounted cone splitter into

individual calico bags (~3kg) and stored in labelled sequential polyweave bags for long-term storage.

The rig mounted cyclone/cone splitter was levelled at the start of each hole to aid an even fall of the sample

through the cyclone into the cone splitter.

RC drilling sample submissions include the use of certified standards (CRMs), and field duplicates were added to

the submitted sample sequence to test laboratory equipment calibrations.

Standards selected are matched to

the analytical method of photon assaying at ALS labs in Perth (~500g units). No composites were taken.

Based on statistical analysis of these results, there is no evidence to suggest the samples are not representative.

Drilling techniques

The RC drill rig was a Schramm C685 Rig type with the capability to reach >400m depths with a rig-mounted

cyclone/cone splitter using a face sample hammer bit of 5 1⁄2 - 6" size.

The booster was used to apply air to keep drill holes dry and reach deeper depths.

Drill sample recovery

RC sample recovery is visually assessed and recorded where significantly reduced. Negligible sample loss has

been recorded.

RC samples were visually checked for recovery, moisture and contamination.

A cyclone and cone splitter were

used to provide a uniform sample, and these were routinely cleaned.

RC Sample recoveries are generally high. No significant sample loss has been recorded.

Logging

RC chip samples have been geologically logged on a per 1 metre process recording lithology, mineralisation,

veining, alteration, and weathering.

Geological logging is considered appropriate for this style of deposit (metamorphosed orogenic gold). The

entire length of all holes has been geologically logged.

RC drill logging was completed by Galt Mining Solutions staff and data entered into BNZ's MXDeposit digital

data collection platform provided by Expedio.

All drill chips were collected into 20 compartment-trays for future reference and stored at Galt's warehouse in

West Leederville at the time of reporting.

Sub-sampling techniques

and sample preparation

RC chips were cone split at the rig.

Samples were generally dry.

A sample size of between 3 and 5 kg was collected.

This size is considered appropriate, and representative of

the material being sampled given the width and continuity of the intersections, and the grain size of the

material being collected.

For the 1 metre samples, certified analytical standards (appropriate for photon assaying) and field duplicates

were inserted at appropriate intervals at a rate equal to 1 in 20 and sent for analysis with the samples.

Sample preparation was undertaken at ALS Laboratory - Perth. Gold analysis utilised the photon assaying

methodology where original samples are crushed to 2mm with a sub-set 500g separated for non-destructive

analysis.

Any sample reporting as having elevated > 1µSv readings during the preparation for photon assaying at ALS

labs were flagged and were submitted for fire assay (Au-AA26) methodology at ALS labs in Perth as a

quantifying check against the Photon assays.

Criteria

Commentary