Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BYN.V ·

Banyan Reports Gold Recoveries of 83.3% at Hyland Gold Project, Yukon

Drill Results

Banyan Reports Gold Recoveries of 83.3% at Hyland Gold Project, Yukon

January 8, 2018 TSX-V: BYN

BANYAN GOLD CORP. (“Banyan” or the “Company”) is pleased to announce Oxide recovery

results from detailed metallurgical test work completed as part of the 2017 Hyland Gold Project Main

Zone exploration program.

Banyan engaged Kappes Cassidy & Associates of Reno, NV ('KCA') to conduct detailed metallurgical

test work on samples collected from dedicated metallurgical drill holes; HY17-073 and HY17 -074.

Initial test work included 96 -hour bottle roll tests on 3 composite oxide and 3 composite sulphide

samples. Gold recoveries averaged 83.3% on the three oxide samples at a P80 0.15mm crush size.

“Recoveries exceeded our expectations”, said Tara Christie, President and CEO. “Recovery test work

will continue with additional work that includes column leach tests”.

Upcoming Events

Banyan will be giving a technical presentation on the “Hyland Gold Project” at the GAC Cordilleran

Section “Exploration Series” at 8:20 am on Tuesday January 9 th, 2018 at the Discovery Center,

Geological Survey of Canada 1500-605 Robson Street. Project Geologist Leif Bjornson, M.Sc., P.Geo.

will be presenting.

Banyan will also have a booth at the Vancouver Resource Investment Conference on January 21-22,

2018 (Booth 312) and at the Core Shack at the AMEBC Roundup on January 23 -24, 2018 (Booth

720).

Technical Information

The technical inform ation in this news release has been reviewed and approved by Paul D. Gray, P.

Geo., a Qualified Person as defined by NI 43-101.

Chain of custody

Three oxide samples from diamond drill holes HY17-073 and HY17 -074 from the 2017 Hyland Gold

Project exploration program were sent for metallurgical testing by Kappes Cassidy & Associates of

Reno, NV ('KCA') . Drill core samples were collected and sealed in poly bags at Banyan’s core

processing facilities at the Hyland Gold Project. All these samp les were delivered by Bany an

personnel or a dedicated expediter and shipped directly to KCA in Reno, NV.

About Banyan Gold

Banyan is a growth stage gold exploration company whose flagship property, the Hyland Gold Project,

is approximately 70km NE of Watson Lake, Yukon, along the southeast end of the Tintina Gold Belt.

The Hyland Main Zone Inferred Gold Resource Estimate, pre pared in accordance with NI 43-101, at a

0.6g/t gold equivalent cutoff, contain s 12,503,994 tonnes with 361,692 ounces gold at 0.9g/t and

2,248,948 ounces silver at 5.59g/t for a combined gold a nd silver 396,468 ounces gold equivalent at

0.99 g/t.

The 9,23 0 ha Aurex -McQuesten Property, in close proximity to Victoria Gold's Eagle Project and

Alexco Resource's Keno Hill Silver District, is highly perspective for structurally controlled, intrusion

related gold -silver mineralization in relation to quartz monzon ite dykes of the Tombstone intrusive

suite.

Banyan trades on the TSX -Venture Exchange under the symbol “BYN”. For more information, please

visit the corporate website at www.BanyanGold.com or contact the Company.

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"

Tara Christie

President & CEO

For more information, please contact:

Tara Christie David Rutt

Tel: (888) 629-0444 Tel: (888) 629-0444

Email: [email protected] Email: [email protected]

CAUTIONARY STATEMENT: The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of

this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the

information contained herein. This news release contains forward -looking information, which is not comprised of historical

facts. Forward -looking information involves risks, uncertainties and other factors that could cause actual events, results,

performance, pro spects and opportunities to differ materially from those expressed or implied by such forward -looking

information. Forward looking information in this news release includes, but is not limited to, Banyan’s objectives, goals or

future plans, statements rega rding exploration expectations, exploration or development plans and the timing of negotiating

the definitive agreements. Factors that could cause actual results to differ materially from such forward -looking information

include, but are not limited to, un certainties inherent to preparing a resource estimate within expected timeline, capital and

operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaini ng or

failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the

availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates,

fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration

and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in

Banyan’s public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing

the forward -looking information in this news release are reasonable, undue reliance should not be placed on such

information, which only applies as of the date of this news release , and no assurance can be given that such events will

occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward -

looking information, whether as a result of new information, future events or otherwise, other than as required by law. Paul D.

Gray of Banyan Gold Corp. is a “qualified person” within the meaning of such term as set forth in National Instrument 43 -101

of the Canadian Securities Administrators, and has verified and supervised the pre paration of all of the scientific and

technical information contained in this news release.

Statements in this news release regarding Banyan Gold which are not historical facts are “forward -looking statements” that

involve risks and uncertainties. Such information can generally be identified by the use of forwarding-looking wording such as

“may”, “will”, “expect”, “estimate”, “anticipate”, “intend”, “believe” and “continue” or the negative thereof or similar variations.