Banyan Gold Intersects 3.66 g/t over 17.6 m Continuing to Extend High-Grade Mineralization in Airstrip Deposit, AurMac Project, Yukon, Canada
1
Banyan Gold Intersects 3.66 g/t over 17.6 m Continuing to Extend
High-Grade Mineralization in Airstrip Deposit, AurMac Project, Yukon,
Canada
Nov 13, 2025, TSX-V: BYN
VANCOUVER, BC, Nov 13, 2025 - Banyan Gold Corp. (the "Company" or "Banyan") (TSX-V:
BYN) (OTCQB: BYAGF) continues to intersect high-grade mineralization in Airstrip (“Airstrip”)
and extend the high-grade domains at its AurMac Project (“AurMac”).
Drill-hole highlights include:
• AX-25-708 – 3.66 g/t Au over 17.6 metres (“m”), including 6.80 g/t Au over 9.3m, with
high-grade interval of 35.98 g/t Au over 1.6m
• AX-25-640 – 1.25 g/t Au over 5.4m within 0.72 g/t Au over 13.0m
• AX-25-703 – 2.04 g/t Au over 11.4m, including 3.60 g/t Au over 5.6m with a high-grade
interval of 7.98 g/t Au over 1.2m
• AX-25-711 – 1.25 g/t Au over 7.00m
• AX-25-712 – 1.36 g/t Au over 15.3m including 1.87 g/t Au over 9.1m
• AX-25-714 – 1.12 g/t Au over 18.4m including 2.12 g/t Au over 6.7m and 1.49 g/t Au over
4.6m
“These results continue to highlight the >1g/t Au near-surface mineralized domains in AurMac,”
said Tara Christie, Banyan President and CEO.
“We continue to see strong replacement (skarn) style mineralization at Airstrip in the lower
calcareous metasedimentary unit that contacts the felsic dyke (Cal 2) that was intersected in hole
AX-25-650 (see News Release dated June 25, 2025),” stated Duncan Mackay, Vice President of
Exploration. “Extending very high -grade mineralization over 100m down dip with an interval of
35.98 g/t Au over 1.6m ( calculated true thickness is approx. 1.5m) highlights the potential to
continue to add ounces to the Airstrip deposit and improve areas of the existing Mineral Resource
Estimate. The high-grade core of Airstrip associated with the felsic dyke contact now extends over
500m along strike and nearly 300m down dip.”
2
Figure 1: Plan map of the Airstrip Deposit. Drillholes with assays pending denoted by green dots.
3
Figure 2: Oblique view of 3D mineralized domain (mineralized calcareous metasediment; Cal 2; see figure 3) in Airstrip. Magenta
shape indicates expanded high-grade core of the airstrip deposit (see news release dated June 25, 2025; select drill holes in blue).
Yellow dots indicate drillholes in this news release. The intersection in AX-25-708 extends very high-grade mineralization in Cal 2
down dip by over 100m, with potential to continue expanding the Cal2 Zone. Cross-section line for Figure 2 shown by gold line.
4
Figure 3: Cross-section looking east, showing drillhole AX-25-708, extending high-grade mineralization down dip from AX-25-650
and AX-24-590.
5
Figure 4: High-grade skarn mineralization in drill hole AX-25-708 associated with pyrrhotite and quartz replacement.
Table 1: Significant diamond drill hole assay intercepts for Powerline in this release
HOLE NUMBER depth from depth to Au Interval (m) Au Interval (g/t)
AX-25-640 18.6 27.1 8.5 0.31
and 46.0 59.0 13.0 0.72
including 53.6 59.0 5.4 1.25
and 92.5 104.7 12.2 0.29
AX-25-644 8.8 59.0 50.2 0.36
including 20.7 29.3 8.6 0.37
and including 42.4 49.7 7.3 0.91
and 75.5 77.0 1.5 0.51
and 142.9 143.8 0.9 0.34
AX-25-702 25.0 93.4 68.4 0.38
including 43.5 45.0 1.5 3.72
and including 57.0 78.5 21.5 0.47
including 76.8 77.1 0.3 3.43
6
and 137.9 141.4 3.5 0.51
including 139.4 139.8 0.4 1.38
AX-25-703 25.2 31.5 6.3 0.59
including 25.2 26.8 1.6 1.87
and 80.8 82.3 1.5 0.39
and 102.1 106.3 4.2 1.56
including 105.1 106.3 1.2 4.28
and 126.4 154.7 28.3 0.68
including 129.3 131.1 1.8 1.47
and including 138.3 139.7 1.4 5.31
and including 152.5 154.7 2.2 1.56
and 166.9 167.8 0.9 4.14
and 196.2 207.6 11.4 2.04
including 196.2 201.8 5.6 3.60
including 197.5 201.8 4.3 3.99
including 197.5 198.7 1.2 7.98
and including 207.2 207.6 0.4 3.20
AX-25-705 51.6 78.2 26.6 0.30
including 53.8 54.7 0.9 1.54
and 105.9 112.0 6.1 0.47
including 110.9 112.0 1.1 1.83
and 122.0 130.8 8.8 0.34
and 163.9 167.6 3.7 0.95
including 165.4 167.6 2.2 1.30
AX-25-708** 24.0 25.5 1.5 0.44
and 49.5 58.3 8.8 1.49
including 57.1 58.3 1.2 7.60
including 57.9 58.3 0.4 18.90
and 84.4 91.4 7.0 Assay Pending
and including 104.9 133.5 28.6 0.62
including 132.2 132.6 0.4 12.10
and 163.9 181.5 17.6 3.66
including 164.8 174.1 9.3 6.80
including 171.9 173.5 1.6 35.98
AX-25-710 21.0 61.2 40.2 0.51
including 21.0 36.2 15.2 0.41
and including 57.0 59.0 2.0 4.52
including 57.0 57.6 0.6 11.60
and 89.6 107.9 18.3 0.51
including 89.6 92.1 2.5 2.57
including 91.2 92.1 0.9 3.85
AX-25-711 27.0 34.5 7.5 0.58
including 31.5 33.0 1.5 1.50
and 50.0 57.0 7.0 1.25
including 54.0 57.0 3.0 2.39
AX-25-712 15.3 30.6 15.3 1.36
including 15.3 24.4 9.1 1.87
including 16.8 22.8 6.0 2.18
and 47.6 53.4 5.8 0.55
including 52.0 53.4 1.4 1.26
and 65.5 67.0 1.5 0.42
AX-25-713 8.0 56.6 48.6 0.70
including 9.2 11.3 2.1 8.81
and including 24.9 27.3 2.4 1.62
and including 55.3 56.6 1.3 2.71
AX-25-714 14.2 32.6 18.4 1.12
including 25.9 32.6 6.7 2.12
including 28.6 32.6 4.0 2.78
7
including 32.2 32.6 0.4 6.18
and 51.6 56.2 4.6 1.49
including 54.2 56.2 2.0 2.78
including 54.2 55.0 0.8 4.54
** - assay pending
Note: True widths are calculated to be approximately 90% of drilled interval.
Table 2: Collar Locations for drillholes in this release
HOLE ID Easting (m) Northing (m)
Elevation
(m) Depth (m) Azimuth Dip
AX-25-640 467053 7084043 782 111 0 -60
AX-25-644 466878 7084044 774 151 0 -60
AX-25-702 466899 7083901 768 154 0 -60
AX-25-703 466901 7083798 773 227 0 -60
AX-25-705 466905 7083845 771 186 0 -60
AX-25-708* 467002 7083859 772 191 0 -60
AX-25-710 466956 7083978 778 140 0 -60
AX-25-711 466840 7084053 771 76 0 -60
AX-25-712 466792 7084042 767 70 0 -60
AX-25-713 466744 7084034 763 70 0 -60
AX-25-714 466689 7084038 754 69 0 -60
*Pending Assays
Grant of Incentive Stock Options
The Board of Directors of the Company have granted 230,000 stock options to purchase 230,000
shares at an exercise price of $0. 91 per share with a vesting period of up to 18 months with a
five-year term.
The stock options are being issued to consultants, advisors and exploration staff of the Company.
The options were granted under and are subject to the terms and conditions of the Company’s
stock option plan.
Analytical Method and Quality Assurance/Quality Control Measures
All diamond drill core was systematically logged and photographed by Banyan geology
personnel. All core samples (HTW and NTW diameter) were split on -site at Banyan’s core
processing facilities. Once split, half samples were placed back in the core boxes w ith the other
half of split samples sealed in poly bags with one part of a three -part sample tag inserted
within. Samples were delivered by Banyan personnel or a dedicated expediter to the Bureau
Veritas, Whitehorse preparatory laboratory where samples are prepared and then shipped to
Bureau Veritas’s Analytical laboratory in Vancouver, B.C. for pulverization and final chemical
analysis.
Core splits reported in this news release were analysed by Bureau Veritas of Vancouver, B.C.,
utilizing the four-acid digestion ICP -ES 35-element MA-300 or ICP -ES/MS 59-element MA-250
analytical package with FA -450 50 -gram Fire Assay with AAS finish for go ld on all
samples. Samples returning >10 g/t Au were reanalysed by fire assay with gravimetric finish on a
8
50g sample (FA-550). High-grade samples with documented visible gold are also analysed using
metallic screen fire assay (FS -652). Bureau Veritas is an accredited lab following ISO/IEC
17025:2017 SCC File Number 15895. A robust system of standards, ¼ core duplicates and blanks
has been implemented in the 2025 exploration drilling program and is monitored as chemical
assay data becomes available.
Qualified Persons
Duncan Mackay, M.Sc., P.Geo., is a “ Qualified Person” as defined under National Instrument
43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”), and has reviewed and
approved the content of this news release in respect of all disclosure other than the MRE . Mr.
Mackay is Vice President Exploration for Banyan and has verified the data disclosed in this news
release, including the sampling, analytical and test data underlying the information.
Upcoming Events
• Deutsche Goldmesse Fall, Frankfurt – November 14 to 15, 2025
• Yukon Geoscience Forum, Whitehorse – November 16 to 19, 2025
• 121 Mining Investment Dubai - November 26-27, 2025
About Banyan
Banyan's primary asset, the AurMac Project is located in the Traditional Territory of First Nation
of Na -Cho Nyäk Dun, in Canada’s Yukon Territory. The current Mineral Resource Estimate
(“MRE”) for the AurMac Project has an effective date of June 28, 2025 and comprises an Indicated
Mineral Resource of 2.274 million ounces of gold (" Au") (112.5 M tonnes at 0.63 g/t) and an
Inferred Mineral Resource of 5.453 Moz of Au (280.6 M tonnes at 0.60 g/t ) (as defined in the
Canadian Institute of Mining, Metallurgy a nd Petroleum ("CIM") Definition Standards for Mineral
Resources & Mineral Reserves incorporated by reference into NI 43 -101). The 303 square
kilometres (“sq km”) AurMac Project lies 40 k ilometres from Mayo, Yukon. The AurMac Project
is transected by the main Yukon highway and benefits from a 3-phase powerline, existing power
station and cell phone coverage.
Table 3: Pit-Constrained Indicated and Inferred Mineral Resources – AurMac Project
Deposit Gold Cut-Off
(g/t)
Tonnage
(M Tonnes)
Average Gold
Grade (g/t)
Contained Gold
(Moz)
Indicated MRE
Airstrip 0.30 27.7 0.69 0.611
Powerline 0.30 84.8 0.61 1.663
Total Combined
Indicated MRE
0.30 112.5 0.63 2.274
Inferred MRE
Airstrip 0.30 10.1 0.75 0.245