VANCOUVER, B.C., June 29, 2022, Banyan Gold Corp . (the "Company" or "Banyan Gold")
(TSX-V: BYN) (OTCQB: BYAGF announces the filing of the Technical Report to support the
Updated Mineral Resource Estimate (“ Mineral Resource ”) in accordance with the Canadian
Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards incorporated by
reference in National Instrument 43 -101 (“NI 43 -101”) for the AurMac Property. The AurMac
Property is located in the Mayo Mining district, approximately 40 kilometres northeast from the
village of Mayo, Yukon and 356 kilometres north of Whitehorse, Yukon (the “AurMac Property”).
The Technical Report was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting
Inc., Dino Pilotto, P.Eng. of JDS Energy & Mining Inc. and R. Nick Gow, PhD. of Forte Dynamics.
The report has been filed on June 29, 2022 and is available on SEDAR.
As announced on May 17, 2022, the Updated AurMac Mineral Resource comprises a
total inferred mineral resource of 3,990,000 ounces of gold (Table 1) on the road accessible
AurMac Property.
This pit constrained mineral resource is contained in three near/on-surface deposits: the Airstrip,
Powerline and Aurex Hill deposits. The Resource Estimate is summarized below in Table 1
Table 1: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off – AurMac
Property
Deposit Au Cut-Off
g/t
Tonnage
M Tonnes
Average Au
Grade
g/t
Au Content
k oz.
Airstrip 0.2 42.5 0.64 874
Powerline 0.2 152.0 0.59 2,898
Aurex Hill 0.3 12.5 0.53 215
Total Combined 0.2 - 0.3 207.0 0.60 3,990
Notes to Table 1:
1. The effective date for the Resource Estimate is May 13, 2022. The updated Resource Estimate
for the AurMac Property was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting
2
Inc., an independent Qualified Person in accordance with the requirements of NI 43-101. Please
see the news release of May 17, 2022.
2. Mineral resources which are not mineral reserves do not have demonstrated economic viability.
The Resource Estimate may be materially affected by environmental, permitting, legal, title,
taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
3. The definitions of inferred mineral resources that are contained in the Definition Standards of the
Canadian Institute of Mining, Metallurgy and Petroleum (“CIM Definition Standards”), which are
incorporated by reference into National Instrument 43 -101, Standards of Disclosure for Mineral
Projects (“NI 43-101”) were followed to classify the mineral resources in the Resource Estimate.
The quantity and grade of reported inferred mineral resources in this estimation are uncertain in
nature and there has been insufficient exploration to define these inferred mineral resources as an
indicated mineral resource and it is uncertain if further exploration will result in upgrading them to
an indicated or measured mineral resource category.
4. Mineral resources are reported at a cut-off grade of 0.2 g/t Au for the Airstrip and Powerline deposits
and 0.3 g/t Au for the Aurex Hill deposits, using a US$/CAN$ exchange rate of 0.75 and constrained
within an open -pit shell optimized with the Lerchs -Grossman algorithm to constrain the Mineral
Resources with the following estimated parameters: gold price of US$1,700/ounce, US$2.50/t
mining cost, US$5.50/t processing cost, US$2.00/t G+A, 80% heap leach recoveries, and 45° pit
slope. The gold price and cost assumptions are consistent with current pricing assumptions and
costs, and in particular are consistent with those employed for recent technical reports for similar
pit-constrained Yukon gold projects.
5. The number of tonnes was rounded to the nearest hundred thousand. The number of ounces was
rounded to the nearest thousand and final result to three significant figures. Any discrepancies in
the totals are due to rounding effects.
2022 Exploration Update
Banyan commenced exploration diamond drilling in January 2022 and has now completed over
26,000 metres of drilling for the planned 2022, 60,000 metre program.
Upcoming Events
Banyan Gold will be attending:
● Precious Metals Summit: Beaver Creek, Colorado, September 13 - 16, 2022
● New Orleans Investment Conference, New Orleans, Louisiana, October 12 – 15, 2022
All events are subject to change.
About Banyan Gold
Banyan Gold’s primary asset, the AurMac Property is comprised of the Aurex and McQuesten
properties, as well as claims staked and owned 100% by Banyan Gold, and adjacent to Victoria
Gold's Eagle Gold Mine, in Canada’s Yukon Territory. The updated resource for the AurMac
Property of 3,990,000 ounces (see Table 1 below) was announced on May 17 2022.
The 173 sq km AurMac Property lies 30 kilometres from Victoria Gold's Eagle Project and
adjacent to the Keno Hill Silver District operated by Alexco Resource Corp. and is highly
3
prospective for structurally controlled, intrusion related gold-silver mineralization. The property is
transected by the main Yukon highway and access road to the Victoria Gold open-pit, heap leach
Eagle Gold mine. The AurMac Property benefits from a 3-phase powerline, existing power station
and cell phone coverage. Banyan has a right to earn up to a 100% interest, in both the Aurex and
McQuesten Properties, subject to certain royalties.
The Updated Mineral Resource Estimate for the AurMac Property was prepared May 13, 2022
and consisted of 3,990,000 ounces of gold (see Table 1) hosted within near surface, road
accessible pit constrained Mineral Resources contained in three near/on -surface deposits: the
Airstrip, Aurex Hill and Powerline Deposits.
Table 1: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off – AurMac
Property
Deposit Au Cut-Off
g/t
Tonnage
M Tonnes
Average Au
Grade
g/t
Au Content
k oz.
Airstrip 0.2 42.5 0.64 874
Powerline 0.2 152.0 0.59 2,898
Aurex Hill 0.3 12.5 0.53 215
Total Combined 0.2 - 0.3 207.0 0.60 3,990
Notes to Table 1:
1. The effective date for the Resource Estimate is May 13, 2022. The updated Resource Estimate
for the AurMac Property was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting
Inc., an independent Qualified Person in accordance with the requirements of NI 43 -101. The
technical report supporting the Resource Estimate (the “Technical Report”) has been filed on
SEDAR at www.sedar.com effective June 29, 2022. Please see the news release of May 17, 2022.
2. Mineral resources which are not mineral reserves do not have demonstrated economic viability.
The Resource Estimate may be materially affected by environmental, permitting, legal, title,
taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
3. The definitions of inferred mineral resources that are contained in the Definition Standards of the
Canadian Institute of Mining, Metallurgy and Petroleum (“CIM Definition Standards”), which ar e
incorporated by reference into National Instrument 43 -101, Standards of Disclosure for Mineral
Projects (“NI 43-101”) were followed to classify the mineral resources in the Resource Estimate.
The quantity and grade of reported inferred mineral resources in this estimation are uncertain in
nature and there has been insufficient exploration to define these inferred mineral resources as an
indicated mineral resource and it is uncertain if further exploration will result in upgrading them to
an indicated or measured mineral resource category.
4. Mineral resources are reported at a cut-off grade of 0.2 g/t Au for the Airstrip and Powerline deposits
and 0.3 g/t Au for the Aurex Hill deposits, using a US$/CAN$ exchange rate of 0.75 and constrained
within an open -pit shell optimized with the Lerchs -Grossman algorithm to constrain the Mineral
Resources with the following estimated parameters: gold price of US$1,700/ounce, US$2.50/t
mining cost, US$5.50/t processing cost, US$2.00/t G+A, 80% heap leach recoveries, and 45° pit
slope. The gold price and cost assumptions are consistent with current pricing assumptions and
costs, and in particular are consistent with those employed for recent technical reports for similar
pit-constrained Yukon gold projects.
4
5. The number of tonnes was rounded to the nearest hundred thousand. The number of ounces was
rounded to the nearest thousand and final result to three significant figures. Any discrepancies in
the totals are due to rounding effects.
In addition to the AurMac Property, the Company holds the Hyland Gold Project, located 70
kilometres Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt
(the “Hyland Project”). The Hyland Project is a sediment hosted, structurally controlled, intrusion
related gold deposit, within a large land package (over 125 sq km), accessible by a network of
existing gravel access roads.
Banyan Gold trades on the TSX-Venture Exchange under the symbol “BYN” and is quoted on the
OTCQB Ventu re Market under the symbol “ BYAGF”. For more information, please visit the
corporate website at www.BanyanGold.com or contact the Company.
Qualified Persons
Paul D. Gray, P.Geo., Vice President of Exploration for the Company, is a “qualified person” as
defined under NI 43-101, and has reviewed and approved the contents of this new release. Mr.
Gray has verified the data disclosed in this news release, including the sampling, analytical and
test data underlying the information.
ON BEHALF OF BANYAN GOLD CORPORATION
(signed) "Tara Christie"
Tara Christie
President & CEO
For more information, please contact:
Tara Christie • 778 928 0556 • [email protected]
Jasmine Sangria • 604 312 5610 • [email protected]
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term
is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the
adequacy or accuracy of this release.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the
information contained herein.
FORWARD LOOKING INFORMATION: This news release contains forward -looking information, which is not
comprised of historical facts. Such information can generally be identified by the use of forwarding -looking wording
such as “may”, “will”, “expect”, “estimate”, “anticipate”, “intend”, “believe”, “potential” and “continue” or the negative
thereof or similar variations. Forward-looking information involves risks, uncertainties and other factors that could cause
actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by
such forward-looking information. Forward looking information in this news release includes, but is not limited to, the
Company’s plans for drilling this year; and statements regarding exploration expectations, exploration or development
plans; and mineral resource estimates. Factors that could cause actual results to differ materially from such forward-
looking information include, but are not limited to, uncertainties inherent in resource estimates, continuity and extent of
mineralization, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical
test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals,
political risks, uncertainties relating to the availability and costs of financing needed in the futur e, changes in equity
markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects
and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting
business in any jurisdiction, and those risks set out in Banyan’s public documents filed on SEDAR. Although Banyan
believes that the assumptions and factors used in preparing the forward-looking information in this news release are
5
reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news
release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan
disclaims any intention or obligation to updat e or revise any forward -looking information, whether as a result of new
information, future events or otherwise, other than as required by law.