Banyan Commences 2018 Exploration Program at Hyland GOLD Project, Yukon
BANYAN COMMENCES 2018 EXPLORATION PROGRAM AT HYLAND GOLD PROJECT, YUKON
June 18, 2018 TSX-V: BYN
BANYAN GOLD CORP. (“Banyan” or the “Company”) is pleased to announce the commencement of the
2018 field exploration season, with field-based trench, diamond drill and geochemical sampling
programs planned for the Company's wholly-owned, flagship Hyland Gold Project located in Southeast
Selwyn Basin, Yukon Territory.
“This season’s program on our Hyland Gold Project will focus on establishing the mineral continuity
between the current N.I. 43 -101 compliant resource at the Main Zone and the Camp Zone, an area
never before tested”, stated Tara Christie, P resident and CEO. “We believe that a combination of
targeted surface trenches and focused diamond drilling will lay the groundwork necessary to grow the
current N.I. 43 -101 compliant resource within the Quartz Lake Corridor and generate maximum
shareholder value for our Company.”
The Hyland Project is dominated by the 18 km long north -south Quartz Lake Corridor (“QLC”) and is
interpreted to be the dominant control for gold mineralization at Hyland. Of the 18 km long QLZ ~870m
has been delineated by the current N.I. 43-101 compliant resource in the Main Zone, ~400m has been
tested by 5 trenches and 3 drill holes in the Camp Zone . T he ~850m section of the Q uartz Lake
Lineament between the Camp Zone and the Main Zone remains largely untested.
Planning and preparations for an active 2018 field season have begun with personnel slated to be
mobilized to the Hyland Gold project beginning in mid -June. The program will target a previously
inaccessible portions of the QLC for detailed trenches and a subsequent drill program designed to test
the continuity of mineralization between the two Zones. Approximately 1,200 metres of diamond
drilling from ten ~100m -spaced holes combined with >1,000 meters of trenches from 20 50m -spaced
trenches is planned over this high-priority target area.
The proposed exploration programs are well supported by an existing 35 -person camp and
commiserate pre-positioned fuel, drill, and heavy equipment that w ere transported to the Hyland Gold
Project in March 2018 by Banyan on the existing access trail. In addition to the equipment and
consumables brought in on the winter trail, a secondary, fully equipped 25-person camp was mobilized
to site and will be commissioned near the Main Zone.
Summary Maps of the proposed 2018 Hyland program will be made available on the Company’s
website: www.banyangoldcorp.com
The Company plans to issue 200,000 stock options, to certain staff, with an exercise pric e of $0.075
per share, pursuant to the Company's Stock Option Plan.
This News Release has been reviewed and approved by Paul D. Gray, P.Geo., a Qualified Person as defined
by NI 43-101.
About Banyan Gold
Banyan is a growth stage gold exploration company whose flagship property, the Hyland Gold Project,
is approximately 70km NE of Watson Lake, Yukon, along the southeast end of the Tintina Gold Belt.
The Hyland Main Zone Indicated Gold Resource Estimate, pr epared in accordance with NI 43 -101, at
a 0.3 g/t gold equivalent cutoff, contains 8.6 million tonnes grading 0.85 g/t AuEq for 236,000 AuEq
ounces with an Inferred Mineral Resource of 10.8 million tonnes grading 0.83 g/t AuEq for 288,000
AuEq ounces.
Cut-off Grade
(AuEq g/t) In situ Tonnes
Au Ag AuEq
Grade
(g/t) Ozs Grade
(g/t) Ozs Grade
(g/t) Ozs
Indicated
0.3 8,637,000 0.78 216,000 7.04 1,954,000 0.85 236,000
Inferred
0.3 10,784,000 0.77 266,000 5.32 1,845,000 0.83 288,000
(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. All figures are rounded to
reflect the relative accuracy of the estimate.
(2) Mineral resources are reported at a cut -off grade of 0.3 g/t AuEq. AuEq grade is based on $1,350.00/oz Au, $17.00/oz Ag
and assumes a 100% recovery. The AuEq calculation does not apply any adjustment factors for difference in metallurgical
recoveries of gold and silver. This information can only be derived from definitive metallurgi cal testing which has yet to be
completed.
The 9,230 ha Aurex -McQuesten Property, in close proximity to Victoria Gold's Eagle Project and
Alexco Resource's Keno Hill Silver District, is highly prospective for structurally controlled, intrusion
related gold -silver mineralization in relation to quartz monzonite dykes of the Tombstone intrusive
suite.
Banyan trades on the TSX -Venture Exchange under the symbol “BYN”. For more information, please
visit the corporate website at www.BanyanGold.com or contact the Company.
ON BEHALF OF BANYAN GOLD CORPORATION
(signed) "Tara Christie"
Tara Christie
President & CEO
For more information, please contact:
Tara Christie David Rutt
Tel: (888) 629-0444 Tel: (888) 629-0444
Email: [email protected] Email: [email protected]
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is
defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No
stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained
herein. This news release contains forward-looking information, which is not comprised of historical facts. Forward-looking
information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and
opportunities to differ materially from those expressed or implied by such forward -looking information. Forward looking
information in this news release includes, but is not limited to, Banyan’s objectives, goals or fut ure plans, statements
regarding exploration expectations, exploration or development plans and mineral resource estimates. Factors that could
cause actual results to differ materially from such forward-looking information include, but are not limited to, uncertainties
inherent in resource estimates , capital and operating costs varying significantly from estimates, the preliminary nature of
metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project
approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity
markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and
the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business
in any jurisdiction, and those risks set out in Banyan’s public documents filed on SEDAR. Although Banyan believes that the
assumptions and factors used in preparing t he forward-looking information in this news release are reasonable, undue
reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance
can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to
update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other
than as required by law.
Statements in this news release r egarding Banyan Gold which are not historical facts are “forward -looking statements” that
involve risks and uncertainties. Such information can generally be identified by the use of forwarding-looking wording such as
“may”, “will”, “expect”, “estimate”, “anticipate”, “intend”, “believe” and “continue” or the negative thereof or similar variations.