Banyan Begins 2019 Aurex‐mcquesten Exploration Program, Yukon
BANYAN BEGINS 2019 AUREX‐MCQUESTEN EXPLORATION PROGRAM, YUKON
June 4, 2019 TSX-V: BYN
BANYAN GOLD CORP. (“Banyan” or “The Company”), is pleased to announce plans for its’
2019 exploration program on the Aurex-McQuesten Gold Project, Central Yukon, which is located
at the junction of two well-known mineralized belts: Alexco Resource Corp’s Keno Hill high-grade
silver district and Victoria Gold Corp’s Eagle Gold Mine, which is currently under construction and
scheduled to produce over 200,000 ounces of gold annually start ing in second half of
2019. Banyan’s 2019 exploration plans at Aurex-McQuesten inclu de over 1,000m of diamond
drilling in and around the McQuesten Gold Zone starting in June , from a program partly funded
with support from the Yukon Government, through a YMEP grant.
2019 is a difficult year for junior exploration companies to ra ise capital and Banyan has taken
additional measures to reduce costs and preserve capital, respecting shareholders’ investments.
This year’s program at Aurex-McQuesten has been strategically designed to yield information that
will position Banyan well for the success of future drill progr ams as well as to complete the earn
in on our option agreements with Victoria Gold Corp and Alexco Resource Corp., respectively for
2019.
Approximately 400m of diamond drilling will be dedicated to inf ill drilling (increased drill density)
within an interpreted higher-grade mineralized zone around holes: MQ-03-09, MQ-17-26, MQ-18-
30 and MQ-18-37 at the McQuesten Gold Zone. These previously drilled holes define over 160m
of a northeast/southwest trend on nominally 50m spaced holes. Grade-widths of these
intersections are summarized below:
98.8 m of 1.59 g/t Au from 3.7 m in DDH MQ-03-09
96.4 m of 0.74 g/t Au from 5.8 m in DDH MQ-17-26
80.8 m of 1.06 g/t Au from 10.1 m in DDH MQ-18-30
94.9 m of 0.64 g/t Au from 8.9 m in DDH MQ-18-37
Within each of these drillholes’ mineralized intercepts, multip le intervals returned gold assays
greater than 1 g/t Au (up to 84.8 g/t Au over 1.1m) hosted with in pyrrhotitic-rich horizons. The
2019 drillholes will further refine the geological model for th e McQuesten Gold Zone through the
definition of the extent and distribution of these higher-grade intervals.
“The goal of the infill drilling will be to identify the controls on the distribution of higher-grade gold
intervals within the ~90m thick calcareous clastic metasediments of the McQuesten ‘Block 1’,
stated Tara Christie, President and CEO.
Insights from the geological model developed for the McQuesten Gold Zone have been applied
to the entire Aurex-McQuesten drillhole database; and from this review an area ~1km south of
the McQuesten ‘Block 1 (on the Aurex Claim Block) has been iden tified as a high-priority target
due to its geochemical and geological similarities to the McQue sten Gold Zone. The target area
has received only limited drill testing (4 holes in 2003) and will be the focus of 600m of exploratory
drilling in 2019. Specifically, the exploratory drill program w ill step out from drill hole AX-03-12
which has a reported mineralized intercept of 54.2m of 0.97 g/t Au from 31.0m.
“The Aurex-McQuesten projects have the potential to generate value for our shareholders as
Victoria Gold realizes gold production at their open pit, heap leach mine just 40 km away. In
addition, Alexco has a fully functional mill just 10 km to the north-east that they plan to bring back
into production. The Aurex-McQuesten claim block lies on existing transportation infrastructure
(Main Yukon Government Highway System) and covers the initial portions of the all season road
to Victoria Gold’s Eagle Project. This proximity to potential operating mines, mine infrastructure,
all-season access combined with on-claim 3-phas e power lines, gives this property significant
advantages in economics.” said Tara Christie, President and CEO
Technical Information
The technical information in this news release has been reviewed and approved by Paul D. Gray,
P.Geo., a Qualified Person as defined by NI 43-101.
About Banyan Gold
Banyan Gold is focused on gold exploration projects that have t he geological potential, size of
land package and proximity to infrastructure that is advantageo us for a mineral project to have
potential to become a mine. Our Yukon based projects both fit t his model and our objective is to
gain shareholder value by advancing projects in our pipeline.
The Hyland Gold Project, located 70km NE of Watson Lake, Yukon, along the southeast end of
the Tintina Gold Belt is a sediment hosted, structurally contro lled, intrusion related gold deposit,
with a large land package (over 125 sq. km), with the resource contained in the Main Zone area
(900x600m) daylighting at surface and numerous other known surf ace gold targets. The Main
Zone oxide zone is amenable to heap leach open pit mining, with column leach recoveries of
86%. The project has an existing gravel access road.
The Hyland Main Zone Indicated Gold Resource Estimate, prepared in accordance with NI 43-
101, at a 0.3 g/t gold equivalent cutoff, contains 8.6 million tonnes grading 0.85 g/t AuEq for
236,000 AuEq ounces with an Inferred Mineral Resource of 10.8 million tonnes grading 0.83 g/t
AuEq for 288,000 AuEq ounces.
Cut-off Grade
(AuEq g/t) In situ Tonnes
Au Ag AuEq
Grade
(g/t) Ozs Grade
(g/t) Ozs Grade
(g/t) Ozs
Indicated
0.3 8,637,000 0.78 216,000 7.04 1,954,000 0.85 236,000
Inferred
0.3 10,784,000 0.77 266,000 5.32 1,845,000 0.83 288,000
(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. All figures are rounded
to reflect the relative accuracy of the estimate.
(2) Mineral resources are reported at a cut-off grade of 0.3 g/t AuEq. AuEq grade is based on $1,350.00/oz Au, $17.00/oz
Ag and assumes a 100% recovery. The AuEq calculation does not apply any adjustment factors for difference in
metallurgical recoveries of gold and silver. This information can only be derived from definitive metallurgical testing which
has yet to be completed.
The 9,230 ha Aurex-McQuesten Property, in close proximity to Victoria Gold's Eagle Project and
Alexco Resource's Keno Hill Silver District, is highly prospect ive for structurally controlled,
intrusion related gold-silver mineralization in relation to quartz monzonite dykes of the Tombstone
intrusive suite. The property hosts numerous known gold target s and Banyan has developed a
mineralization model at the McQuesten Gold target, located adjacent to the main Yukon highway
and on the access road to the Victoria Gold heap leach mine.
Banyan trades on the TSX-Venture Exchange under the symbol “BYN ”. For more information,
please visit the corporate website at www.BanyanGold.com or contact the Company.
ON BEHALF OF BANYAN GOLD CORPORATION
(signed) "Tara Christie"
Tara Christie
President & CEO
For more information, please contact:
T a r a C h r i s t i e D a v i d R u t t
Tel: (888) 629‐0444 Tel: (888) 629‐0444
Email: [email protected] Email: [email protected]
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is
defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information
contained herein. This news release contains forward-looking information, which is not comprised of historical facts.
Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results,
performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking
information. Forward looking information in this news release includes, but is not limited to, Banyan’s objectives, goals
or future plans, statements regarding exploration expectations, exploration or development plans and mineral resource
estimates. Factors that could cause actual results to differ materially from such forward-looking information include, but
are not limited to, uncertainties inherent in resource estimates , capital and operating costs varying significantly from
estimates, the preliminary nature of metallurgical test re sults, delays in obtaining or failures to obtain required
governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs
of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in
commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and
development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in
Banyan’s public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in
preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on
such information, which only applies as of the date of this news release, and no assurance can be given that such
events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise
any forward-looking information, whether as a result of new information, future events or otherwise, other than as
required by law.
Statements in this news release regarding Banyan Gold which are not historical facts are “forward-looking statements”
that involve risks and uncertainties. Such information ca n generally be identified by the use of forwarding-looking
wording such as “may”, “will”, “expect”, “estimate”, “anticipate”, “intend”, “believe” and “continue” or the negative thereof
or similar variations.