Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BYN.V ·

Banyan Announces Listing ON OTCQB Venture Market

Listings & Exchange

1

BANYAN ANNOUNCES LISTING ON OTCQB VENTURE MARKET

January 17, 2022 TSX-V: BYN

OTCQB: BYAGF

VANCOUVER, BC, January 17, 2022 – Banyan Gold Corp. (the " Company" or

"Banyan") (TSXV: BYN) is p leased to announce that its common shares are now listed for

quotation and sale on the OTCQB Venture Market (the “OTCQB”) in the United States under the

symbol "BYAGF".

The Company's common shares will continue to trade in Canada on the TSX Venture Exchange

under the symbol "BYN".

"We accomplished a great deal in 2021 including the completion of a $16 million financing,

amending our Class IV exploration permit for expanded exploration activities until May 2028 and

drilling 30,000 metres at our rapidly developing AurMac Property. 2022 will have several major

milestones, including an additional 30,000 metres of drilling and a mineral resource update on the

AurMac Property”, Tara Christie, President & CEO of Banyan stated. “Exploration at the AurMac

Property will re -commence this month supported by three (3) diamond drill rigs focused on the

expansion of the Powerline Deposit and, later in summer, on the Aurex Hill target. This OTCQB

listing represents yet another milestone for Banyan, allowing greater access to our growing United

States-based shareholders."

Upcoming Events

Banyan will be attending:

● AMEBC Round-Up – January 31 to February 3, 2022

● CEM Whistler Capital Conference – February 18 to 20, 2022

● BMO 31st Global Metals & Mining Conference – February 27 to March 2, 2022

● PDAC 2022 – March 7 to 9, 2022

● Vancouver Resource Investment Conference – May 16 & 17, 2022

o Booth and Presentation

All events are subject to change.

COVID-19 Update

Banyan continues to take proactive measures to protect the health and safety of our Yukon

communities, our contractors and our employees from COVID 19. Exploration activities will

continue to have additional safety measures in place, regularly updated to follow and exceed all

the recommendations of Yukon’s Chief Medical Officer.

2

About Banyan

Banyan's primary asset, the AurMac Property is comprised of the Aurex and McQuesten

properties, as well as claims staked and owned 100% by Banyan Gold, and adjacent to Victoria

Gold's Eagle Gold Mine, in Canada’s Yukon Territory. The AurMac Proper ty initial resource of

903,945 oz Au (see Table 1 below) was announced in May 2020. Our major strategic

shareholders include Franklin Gold and Precious Metals Fund, Osisko Development, and Victoria

Gold Corporation. Banyan is focused on gold exploration projects that have the geological

potential, size of land package and proximity to infrastructure that is advantageous for a mineral

project to have potential to become a mine. Our Yukon based projects both fit this model and our

objective is to gain shareholder value by advancing projects in our pipeline.

The 173 sq km AurMac Property lies 30 km from Victoria Gold's Eagle Project and adjacent to

the Keno Hill Silver District operated by Alexco Resource Corp. (“Alexco”) and is highly

prospective for structurally controlled, intrusion related gold-silver mineralization. The property is

located adjacent to the main Yukon highway and just off the main access road to the Victoria Gold

open-pit, heap leach Eagle Gold mine. The AurMac Property benefits from a 3-phase powerline,

existing Yukon Energy Corp. switching power station and cell phone coverage. Banyan has

optioned the properties from Victoria Gold and Alexco, respectively, with a right to earn up to a

100% interest, subject to royalties.

The 2020 Initial Mineral Resource Estimate for the AurMac Property prepared in accordance with

the requirements of NI 43-101 is 903,945 ounces of gold (see Table 1). It is a near surface, road

accessible pit constrained Mineral Resource contained in two near/on-su rface deposits: the

Airstrip and Powerline deposits.

Table 1: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off – AurMac Property

Deposit Classification

Tonnage

Tonnes

Average Au

Grade

g/t

Au Content

oz

Airstrip Inferred 45,997,911 0.524 774,926

Powerline Inferred 6,578,609 0.610 129,019

Total Combined Inferred 52,576,520 0.535 903,945

Notes:

1. The effective date for the Mineral Resource is May 25, 2020.

2. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The

estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation,

sociopolitical, marketing, changes in global gold markets or other relevant issues.

3. The CIM definitions were followed for classification of Mineral Resources. The quantity and grade of reported

inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient

exploration to define these inferred Mineral Resources as an indicated Mineral Resource and it is uncertain if

further exploration will result in upgrading them to an indicated or measured Mineral Resource category.

4. Mineral Resources are reported at a cut-off grade of 0.2 g/t Au, using a US$/CAN$ exchange rate of 0.75 and

constrained within an open pit shell optimized with the Lerchs -Grossman algorithm to constrain the Mineral

Resources with the following estimated parameters: gold price of US$1,500/ounce, US$1.50/t mining cost,

US$2.00/t processing cost, US$2.50/t G+A, 80% heap leach recoveries, and 45° pit slope.

5. Mineral Resource Estimate prepared in accordance with 43- 101 requirements by Marc Jutras, P.Eng.,

M.A.Sc., Principal, Ginto Consulting Inc, with technical report filed on SEDAR on July 7,2020.

3

The Hyland Gold Project, located 70 km Northeast of Watson Lake, Yukon, along the Southeast

end of the Tintina Gold Belt is a sediment hosted, structurally controlled, intrusion related gold

deposit, with a large land package (over 125 sq km), with the resource contained in the Main Zone

area (900 m x 600 m) daylighting at surface and numerous other known surface gold targets. The

Main Zone oxide zone is amenable to heap leach open pit mining, with column leach recoveries

of 86%. The project has an existing gravel access road.

Table 2 shows the Hyland Main Zone Indicated Gold Resource Estimate, prepared in accordance

with NI 43-101, at a 0.3 g/t gold equivalent cutoff, contains 8.6 million tonnes grading 0.85 g/t

AuEq for 236,000 AuEq ounces with an Inferred Mineral Resource of 10.8 million tonnes grading

0.83 g/t AuEq for 288,000 AuEq ounces.

Table 2: Hyland Main Zone Indicated Gold Resource Estimate

Cut-off

Grade

(AuEq g/t)

In situ

Tonnes

Au Ag AuEq

Grade

(g/t) Ozs

Grade

(g/t) Ozs

Grad

e (g/t) Ozs

Indicated

0.3 8,637,000 0.78 216,000 7.04 1,954,000 0.85 236,00

0

Inferred

0.3 10,784,000 0.77 266,000 5.32 1,845,000 0.83 288,00

0

Notes:

1. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

2. All figures are rounded to reflect the relative accuracy of the estimate.

3. Mineral resources are reported at a cut-off grade of 0.3 g/t AuEq. AuEq grade is based on $1,350.00/oz Au,

$17.00/oz Ag and assumes a 100% recovery. The AuEq calculation does not apply any adjustment factors

for difference in metallurgical recoveries of gold and silver. This information can only be derived from definitive

metallurgical testing which has yet to be completed.

4. Mineral Resource Estimate prepared in accordance with NI 43-101 by Robert Carne, Allan Armitage and Paul

Gray dated and filed on SEDAR on May 1, 2018.

Banyan trades on the TSX -Venture Exchange under the symbol “BYN” and is quoted on the

OTCQB Venture Market under the symbol “ BYAGF”. For more information, please visit the

corporate website at www.BanyanGold.com or contact the Company.

Qualified Person

Paul D. Gray, P.Geo., Vice President of Exploration for the Company, is a “qualified person” as

defined under National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-

101”), and has reviewed and approved the content of this news release. Mr. Gray has verified the

data disclosed in this press release, including the sampling, analytical and test data underlying

the information

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"

Tara Christie

President & CEO

4

For more information, please contact:

Tara Christie • 778 928 0556 • [email protected]

Jasmine Sangria • 604 312 5610 • [email protected]

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term

is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the

adequacy or accuracy of this release.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the

information contained herein.

FORWARD LOOKING INFORMATION: This news release contains forward-looking information, which is not

comprised of historica l facts. Such information can generally be identified by the use of forwarding- looking wording

such as “may”, “will”, “expect”, “estimate”, “anticipate”, “intend”, “believe”, “potential” and “continue” or the negative

thereof or similar variations. Forward-looking information involves risks, uncertainties and other factors that could cause

actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by

such forward-looking information. Forward looking information in this news release includes, but is not limited to, the

Company’s achievement of major milestones during 2022, including the completion of an additional 30,000 metres of

drilling at the AurMac Property and the completion of a mineral resource update on the AurMac Property ; the timing

and expected scope of the Company’s planned 2022 AurMac Property exploration program including the expansion of

the Powerline Deposit and Aurex Hill target; the future growth of the Company' United States -based shareholders;

Banyan’s objectives, goals or future plans; statements regarding exploration expectations, exploration or development

plans; and mineral resource estimates. Factors that could cause actual results to differ materially from such forward-

looking information include, but are not limited to, uncertainties inherent in resource estimates, capital and operating

costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or

failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating

to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange

rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral

exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those

risks set out in Banyan’s public documents filed on SEDAR. Although Banyan believes that the assumptions and

factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should

not be placed on such information, which only applies as of the date of this news release, and no assurance can be

given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to

update or revise any forward-looking information, whether as a result of new information, future events or otherwise,

other than as required by law.