Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BWR.V ·

BWR receives aeromagnetic interpretation and satellite image of its Little Stull Lake Project, Manitoba

Exploration Programs

BWR receives aeromagnetic interpretation and satellite image of its Little Stull Lake Project, Manitoba

November 09, 2017 - Toronto, Ontario – BWR Exploration Inc. (TSXV:BWR) (“BWR ”) is pleased to provide

an exploration update, including an initial in terpretation of recent airborne survey results on its Little Stull

Lake Gold Project, located in Northeastern Manitoba. In addition, BWR has received a high resolution

satellite image of the project area. The aeromagnetic survey is a precise map of the ent ire property, while

the satellite image provides a baseline pairing and precise topographic base.

As previously announced (August 14, 2017), BWR completed an aeromagnetic geophysical survey over its

20 mining claims and two Mineral Exploration Licenses. BWR’s land package covers an aggregate of 388

square kilometers of favorable exploration terrain, tying up most of the Manitoba portion of the Wolf Bay

Shear Zone (“WBSZ”) that has been likened to the Abitibi Greenstone belt of Northeastern Ontario and

Northwestern Quebec. The eastern portion of the airborne survey was designed to focus on the historical

drilled area referred to as the West Zone, located within Mineral Exploration License (“MEL”) 1026A with

high density (1 25 m spacing) flight -line airborne coverage over a 14 kilometer strike length. The western

portion of the survey covered MEL 426A with less dense ( 250m spacing) flight line coverage, sufficient for

reconnaissance level exploration. The survey once filed with the Manitoba Ministry of Growth and Trade

(Mineral division), fulfills the first-year exploration expenditure commitments on the MEL’s. The flying was

scheduled to minimize impacts on traditional activities in the area.

In general terms, the aeromagnetic survey has mapped a complex, ba nded magnetic unit in the southeast

portion of the survey near Little Stull Lake in the vicinity of the historically drilled gold mineralized zones.

The total field magnetic anomalies are consistent with a steeply dipping volcanic assemblage, trending in a

roughly NW -SE direction , aligned with the WBSZ. The assemblage appears as series of lineaments, one of

which appears to be related to the known gold mineralization. Further processing of t he magnetic data in

the vicinity of the gold zones implies a relati onship between the magnetic sig nature and gold

mineralization, however the intensity of the magnetic unit wanes in the mineralized zone. It is felt that this

may be a result of magnetite depletion, which may be part of the gold emplacement model. (see link to

image: https://bwrexploration.com/press-releases)

The results of the aeromagnetic survey coupled with the high resolution satellite image are being used to

plan future exploration work within the two MEL’s, with a focus on the 6 kilometers that cover the historical

drilled areas. The high resolution (0.5m/pixel) satellite image covering MEL 1026A captured the Kistigan

Lake / Little Stull Lake area during two satellite flyovers in August, 2017. The image clearly defines various

geographic features in the area including: historical drill sites, drill access trails, clearings by previous

operators, trenched areas, outcroppings, as well as the recently refurbished 12-man exploration camp. As

the project advances, this high-resolution image will be used for base line studies (environmental and TEK).

Historical exploration data is currently being superimposed onto the satellite image base map and corrected

for positioning, this is a key exercise to re solve positional discrepancies between the various eras of

exploration at Little Stull Lake prior to the commencement of diamond drilling by BWR.

BWR is currently planning and preparing for its next exploration program that will focus on the historically

drilled “West Zone” . Exploration will be initially designed to replicate selected holes as needed to validate

historical drill results, prior to incorporating the historical data into BWR’s maiden inferred resource

estimate. Historical holes drilled by W estmin Resources and others in the period 1985 -2007 returned

significant intersections of gold mineralization as highlighted in the NI 43 -101 report that has been filed on

the project. (see December 22, 2016 SEDAR filing entitled “NI -43-101 Technical Repor t on the Little Stull

Lake Gold Project, NE Manitoba” as prepared by Patrick N. Chance, M.Sc., P.Eng. dated December 2, 2016).

The scientific and technical content of this press release has been reviewed, prepared and approved by Mr.

Neil Novak, P.Geo., President and CEO who is a “Qualified Person” as defined by National Instrument 43 -101

– Standards of Disclosure for Mineral Projects.

BWR Exploration Inc. is a public company focused on exploring for base and precious metals, with its

flagship Little Stul l Lake Gold Project in NE Manitoba along with other exploration projects in Northern

Ontario, and Northern Quebec, Canada. Management of BWR includes an accomplished group of

exploration/mining specialists with many decades of operational experience in the junior resource sector.

There are currently 55,727,461 shares issued in BWR.

This press release may contain forward -looking statements. Such forward -looking statements involve

known and unknown risks, uncertainties and other factors which may cause the ac tual results, performance

or achievements of BWR Exploration Inc. to be materially different from actual future results and

achievements expressed or implied by such forward -looking statements. Readers are cautioned not to place

undue reliance on these for ward-looking statements which speak only as of the date the statements were

made, except as required by law. BWR Exploration Inc. undertakes no responsibility to publicly update or

revise any forward -looking statements. These risks and uncertainties includ e: the uncertainty of receiving

the interpreted airborne survey results or that actual results obtained by BWR in the future may differ

materially from the historical results described in this press release, which historical results have not been

verified by BWR. In addition, readers of this press release should review the risks and uncertainties that

are described in the quarterly and annual reports and in the documents submitted to the securities

administration. Neither the Toronto Venture Exchange nor i ts Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

For information about BWR Exploration Inc., please visit our new website:

http://www.bwrexploration.com or call/email:

Neil Novak, P.Geo., President, CEO & Director,

BWR Exploration Inc.

82 Richmond St. E

Toronto, ON M5C 1P1

Office (416) 848 6866

[email protected]

For additional information regarding BWR please contact:

Carl Desjardins, Paradox Public Relations

Office: (514) 341 0408

[email protected]