Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BULL.CN ·

Canadian Palladium Intersects 22 Metres Grading 2.22 G/T Palladium Equivalent Including 7 Metres at 3.40 G/T Pd-Eq at East BULL Deposit

Drill Results

1

FOR IMMEDIATE RELEASE

CANADIAN PALLADIUM INTERSECTS 22 METRES GRADING 2.22 G/T PALLADIUM

EQUIVALENT INCLUDING 7 METRES AT 3.40 G/T PD-EQ AT EAST BULL DEPOSIT

Vancouver, British Columbia, May 12, 2021 – Canadian Palladium Resources Inc. (the

"Company") (CSE: BULL) (OTCQB: DCNNF) (FSE: DCR1) is pleased to report new assay results

for drill holes EB-21-54 to EB-21-56 that further extend the East Bull Palladium Deposit along strike

to the west. Holes EB -21-54 to EB-21-56 were all drilled in the Garden Zone at the west end of the

Deposit. A highlight of the current batch of drill results is hole EB-21-55 that intersected 22 metres

grading 2.22 g/t palladium-equivalent. This intersection included a higher grade 7 metre interval

with 3.40 g/t palladium-equivalent and is the best intersect drilled to date in the Garden Zone.

The drilling program has now defined a 3.0 km strike length of near-surface disseminated sulphide

mineralization hosting palladium, platinum, rhodium, gold, and base metals located 90 kilometres west

of Sudbury, Ontario.

Wayne Tisdale, Canadian Palladium’s CEO, commented, “ The west end of the East Bull Palladium

Deposit continues to deliver strong drilling results. Our geologists consider that the wide interval in

hole EB-21-55 may result from proximity to the mineralized feeder dyke that was reported in our

previous press release. We are excited to continue exploration in the west end of the Deposit and are

planning a borehole EM geophysical survey to search for higher-grade sulphides that could potentially

be associated with a feeder dyke structure.”

Mineralized intervals from holes EB-21-54 to EB-21-56 are reported in Table 1. Widths are reported

in metres (m) and precious metal concentrations in grams/tonne (g/t). Appendix 1 provides details of

hole locations and orientations. Figure 1 shows the locations of the drill holes.

Table 1: Diamond Drill Hole Results EB-21-54 to EB-21-56

Hole ID From

(m)

To

(m)

Width

(m) Pd g/t Pt g/t Au g/t Cu % Ni % Co % 2PGM+

Au g/t

Pd Eq

g/t

EB-21-54 152 157 5 0.581 0.105 0.039 0.066 0.030 0.005 0.725 0.989

EB-21-55 152 174 22 1.024 0.308 0.114 0.239 0.064 0.006 1.447 2.222

including 153 160 7 1.661 0.535 0.158 0.317 0.082 0.007 2.354 3.404

EB-21-56 188 210 22 0.371 0.109 0.070 0.112 0.036 0.007 0.55 0.951

The Palladium mineralization is primarily hosted within a 45° north dipping vari-textured gabbro

unit near the basal contact of the East Bull Gabbro. Hole EB-21-54 is the western-most hole

drilled to date on the Company’s Property. Hole EB-21-55 was drilled north of, and intersected the

Garden Zone down dip from, hole EB-21-52 that was reported in the Company’s May 5, 2021 press

release. Hole EB-21-56 was drilled north of hole EB-21-51. Assay results for hole EB-21-56

1

reported here are from the Garden Zone. Additional assays from the lower part of the hole are

pending.

These results continue to demonstrate the consistency of the disseminated palladium-bearing

sulphide mineralization that occurs near the basal contact of the East Bull Gabbro. Drilling has

successfully focused on testing the strike and downdip extensions of this “contact-type”

mineralization that is typically tens of metres thick. The Company is also evaluating potential

footwall mineralization related to feeder conduits for the East Bull Gabbro.

For the drilling program, individual demarked samples of NQ drill core were sawn in half,

bagged, sealed and transported by courier to the laboratory. Duplicates, blanks and standards

were introduced to the sample stream on site. The Company is using two PGM certified

reference materials from Canadian Resource Laboratories as standards to monitor analytical

accuracy. Samples were sent to AGAT Laboratories, Mississauga, Ontario. Each sample was

analysed using the AGAT Laboratories codes 202555, Fire Assay-ICP (50g); 201070, 4 Acid

Digest / ICP-OES Finish. The Company’s protocol is to analyze Rh after initially assaying for

palladium, platinum and gold. Once Rh results are received, the Rh concentrations will be reported.

Pd-Eq grade is based on parameters in the May 23, 2019, NI 43-101 Resource Estimate and

Technical Report. Metal prices are based on 24-month trailing averages at January 31, 2018. In

US$ these prices are: Pd – $767/oz; Pt – $973/oz; Rh – $1,000/oz; Au – $1.262/oz; Cu –

$2.53/lb; Ni – $4.62/lb; Co – $20/lb.

Reported widths are drilled widths, with true widths estimated to be 90 percent of drilled widths

for minus-60-degree-holes to approximately 85 per cent of drilled width for minus-70-degree

holes.

Mr. Garry Clark, P. Geo., of Clark Exploration Consulting, is the “Qualified Person” as defined in

NI 43-101, who has reviewed and approved the technical content in this press release.

Canadian Palladium Resources Inc.

Wayne Tisdale, President and CEO

T: (604) 639-4452

1

Figure 1. Drill intersections reported in this release relative to Garden and Valhalla Zones

of the East Bull Palladium Deposit. Base map is an airborne total field magnetic survey.

Appendix 1. Drill Hole Location information

HOLE-ID UTM_E UTM_N LENGTH AZIMUTH DIP

EB-21-54 403500 5141352 251 180 -60

EB-21-55 403703 5141449 311 180 -60

EB-21-56 403770 5141448 320 180 -60

Drill collar coordinates are in NAD83 UTM 17N

Reader Advisory

This news release contains certain "forward- looking information" within the meaning of applicable securities law.

Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend",

"believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or

"will" occur. In particular, forward-looking information in this press release includes, but is not limited to, statements

with respect to the analytical results and exploration at the East Bull palladium property.

Although we believe that the expectations reflected in the forward- looking information are reasonable, there can be

no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or

achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or

in part, as those set out in the forward- looking information. Forward- looking information is based on the opinions

and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties

and other factors that could cause actual events or results to differ materially from those anticipated in the forward-

looking information. Some of the risks and other factors that could cause the results to differ materially from those

expressed in the forward-looking information include, but are not limited to: general economic conditions in Canada

and globally; industry conditions, including governmental regulation and environmental regulation; failure to obtain

industry partner and other third party consents and approvals, if and when required; the availability of capital on

acceptable terms; the need to obtain required approvals from regulatory authorities; stock market volatility; liabilities

inherent in water disposal facility operations; competition for, among other things, skilled personnel and supplies;

1

incorrect assessments of the value of acquisitions; geological, technical, proce ssing and transportation problems;

changes in tax laws and incentive programs; failure to realize the anticipated benefits of acquisitions and dispositions;

and the other factors. Readers are cautioned that this list of risk factors should not be construe d as exhaustive. The

forward-looking information contained in this news release is expressly qualified by this cautionary statement. We

undertake no duty to update any of the forward- looking information to conform such information to actual results or

to c hanges in our expectations except as otherwise required by applicable securities legislation. Readers are

cautioned not to place undue reliance on forward-looking information.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the

adequacy or accuracy of this release.