Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BULL.CN ·

Canadian Palladium Intersects 19 Metres Grading 1.77 G/T Pdeq IN Garden Zone and Continues to Extend New “Eoh” Zone with 15 Metres Grading 1.36 G/T Pdeq at East BULL Palladium Deposit

Drill Results

1

FOR IMMEDIATE RELEASE

CANADIAN PALLADIUM INTERSECTS 19 METRES GRADING 1.77 g/t PdEq IN

GARDEN ZONE AND CONTINUES TO EXTEND NEW “EOH” ZONE WITH 15

METRES GRADING 1.36 g/t PdEq AT EAST BULL PALLADIUM DEPOSIT

Vancouver, British Columbia, September 22, 2021 – Canadian Palladium Resources Inc.

(the "Company") (CSE: BULL) (OTCQB: DCNNF) (FSE: DCR1) continues to receive

additional significant assay results from the East Bull Palladium Deposit, 90 kilometres west of

Sudbury, Ontario. The drill results reported in this release are from three holes at the west end of

the Deposit. These results extend the Garden Zone and the recently discovered EOH Zone that is

interpreted as a mineralized feeder dyke below the Garden Zone.

Highlights from holes EB-21-70 to 72 include:

• Hole EB-21-71 had a wide 15.0 m intersection grading 1.36 g/t PdEq including 6.0 m

at 2.13 g/t PdEq in the new EOH Zone;

• Hole EB-21-72 had a wide 19.0 m intersection grading 1.77 g/t PdEq including 14 m at

2.08 g/t PdEq in the main Garden Zone.

Wayne Tisdale, Canadian Palladium’s CEO, commented “The consistency of the Garden Zone

mineralization has been outstanding and it contains some great higher-grade intersections. With

the discovery of the EOH Zone below the Garden Zone we are intersecting multiple mineralized

zones in some of our drill holes. We look forward to including these results in our updated

Resource Estimate in Q4.”

Drill Results – The results are part of a 15,000 m drill program with a primary objective of

expanding the current Inferred Resource and discovery of new mineralization. See Figure 1

showing the hole locations.

Hole EB-21-70 intersected 20 m at a grade of 0.994 g/t PdEq in the Garden Zone and drilled

over the top of the EOH Zone. Hole EB-21-71 intersected both the Garden Zone and the

underlying EOH Zone with the higher-grade mineralization on the south side of the EOH Zone.

Hole EB-21-72 is the eastern most of the holes reported here and was designed to extend the

Garden Zone down dip. The higher-grade mineralization in EB-21-72 is located at the base of

the Garden Zone.

2

East Bull Palladium Deposit, Significant Drill Intersections, Drill Holes EB-21-70 to EB-21-72

DDH# Zone Az/Dip From

(m)

To

(m)

Width

(m)

Pd

g/t

Pt

g/t

Au

g/t

Cu

%

Ni

%

Co

%

2PGM+

Au g/t

PdEq

g/t

EB-21-70 Garden 180o/-60o 79 99 20 0.379 0.120 0.097 0.104 0.036 0.007 0.595 0.994

EB-21-71 Garden 180o/-60o 163 173 10 0.415 0.147 0.045 0.092 0.043 0.006 0.608 0.961

and EOH 236 251 15 0.545 0.138 0.055 0.218 0.029 0.007 0.738 1.364

Incl. EOH 245 251 6 0.952 0.203 0.077 0.320 0.042 0.009 1.232 2.133

EB-21-72 Garden 180o/-60o 245 264 19 0.857 0.273 0.088 0.141 0.061 0.008 1.217 1.773

Incl. Garden 250 264 14 1.024 0.309 0.102 0.174 0.062 0.008 1.434 2.076

Pd-Eq grade based on parameters in the May 23, 2019, NI 43-101 Resource Estimate and

Technical Report. Metal prices are based on 24-month trailing averages at January 31, 2018. In

US$ these prices are: Pd – $767/oz; Pt – $973/oz; Rh – $1,000/oz; Au – $1.262/oz; Cu – $2.53/lb;

Ni – $4.62/lb; Co – $20/lb.

The Garden Zone palladium mineralization is primarily hosted within a 45-degree-north-dipping

vari-textured melagabbro unit near the basal contact of the East Bull gabbro. Drilling has

successfully focused on testing the strike and downdip extensions of this contact-type

mineralization that is typically tens of metres thick.

The EOH Zone now has several drill intersections and further assay results on the EOH Zone are

pending. The disseminated sulphide mineralization in the EOH Zone is associated with an

inclusion-rich melagabbro feeder dyke or conduit for the Garden Zone. The current results

indicates that the EOH Zone is northeast striking with a subvertical dip. The Zone is open on

strike and down dip.

The diamond drill holes were all drilled at an azimuth of 180o with inclinations of -60o. Reported

widths are drilled widths. True widths estimated to be 90% of the intersections for the Garden

Zone. The orientation of the EOH Zone is not sufficiently well defined to estimate true widths at

this time. In addition to results reported here, rhodium is being analyzed and will be reported at

a later date.

Drill Program QA/QC – This phase of the drilling program was carried out under the

supervision of Garry Clark, P. Geo., of Clark Exploration Consulting, a Qualified Person as

defined in NI43-101. Drill core samples were split using a rock saw by Company staff, with half

retained in the core box and stored in the Company’s facility in Massey, Ontario. The drill core

samples were transported in sealed bags by courier to Activation Laboratories ("Actlabs") in

Ancaster, Ontario. Actlabs is an independent ISO/IEC 17025 certified laboratory. PGE analysis

was performed using a 30 grams fire assay with an ICP-MS or ICP-AES finish. Multi-element

analyses, including copper and nickel were analysed by four acid digestion using 0.25 grams

with an ICP-AES finish. Certified standards, blanks and crushed duplicates are placed in the

sample stream at a rate of one QA/QC sample per 10 core samples. Results are analyzed for

acceptance at the time of import. All standards associated with the results in this press release

were determined to be acceptable within the defined limits of the standard used.

3

Mr. Garry Clark, P. Geo., of Clark Exploration Consulting, is the “Qualified Person” as defined in

NI 43-101, who has reviewed and approved the technical content in this press release.

Canadian Palladium Resources Inc.

Wayne Tisdale, President and CEO

T: (604) 639-4472

Reader Advisory

This news release contains certain "forward-looking information" within the meaning of applicable securities law.

Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend",

"believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or

"will" occur. In particular, forward-looking information in this press release includes, but is not limited to, statements

with respect to the proposed timing and completion of the private placement and the proposed use of proceeds from

the private placement. Although we believe that the expectations reflected in the forward-looking information are

reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future

results, performance or achievements. Consequently, there is no representation that the actual results achieved will

be the same, in whole or in part, as those set out in the forward-looking information.

Forward-looking information is based on the opinions and estimates of management at the date the statements are

made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results

to differ materially from those anticipated in the forward-looking information. Some of the risks and other factors

that could cause the results to differ materially from those expressed in the forward-looking information include, but

are not limited to: general economic conditions in Canada and globally; industry conditions, including governmental

regulation and environmental regulation; failure to obtain industry partner and other third party consents and

approvals, if and when required; the availability of capital on acceptable terms; the need to obtain required approvals

from regulatory authorities; stock market volatility; liab ilities inherent in water disposal facility operations;

competition for, among other things, skilled personnel and supplies; incorrect assessments of the value of acquisitions;

geological, technical, processing and transportation problems; changes in tax laws and incentive programs; failure

to realize the anticipated benefits of acquisitions and dispositions; and the other factors. Readers are cautioned that

this list of risk factors should not be construed as exhaustive.

The forward-looking information contained in this news release is expressly qualified by this cautionary statement.

We undertake no duty to update any of the forward-looking information to conform such information to actual results

or to changes in our expectations except as otherwise required by applicable securities legislation. Readers are

cautioned not to place undue reliance on forward-looking information.

Neither the Canadian Securities Exchange nor its Regulation Services Provider accepts responsibility for the

adequacy or accuracy of this release.

4

Figure 1. Drill intersections reported in this release relative to the East Bull Palladium

Deposit. Base map is an airborne total field magnetic survey.