Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BULL.CN ·

Canadian Palladium Extends Garden Zone on Strike with 2.38 g/t Pd-Eq over 6 metres and Intersects New Zone of Palladium Mineralization Interpreted as a Feeder Dyke

Drill Results

1

FOR IMMEDIATE RELEASE

CANADIAN PALLADIUM EXTENDS GARDEN ZONE ON STRIKE WITH 2.38 g/t

PALLADIUM EQUIVALENT OVER 6 METERS AND INTERSECTS NEW ZONE OF

PALLADIUM MINERALIZATION INTERPRETED AS A FEEDER DYKE

Vancouver, British Columbia, May 5, 2021 – Canadian Palladium Resources Inc. (the

"Company") (CSE: BULL) (OTCQB: DCNNF) (FSE: DCR1) is pleased to provide new assay

results for drill holes EB-21-51, EB-21-52, and EB-21-53 at the East Bull Palladium Deposit, located

90 kilometres west of Sudbury, Ontario. These drill holes extend the main Garden/Valhalla Zone

palladium mineralization 250 m along strike to the west and intersected a new zone of mineralized

inclusion-bearing gabbro located 50 m below the Garden Zone that is interpreted as a feeder dyke or

magma conduit for the East Bull Intrusion.

Highlights of the current drill results are:

• Hole EB-21-52 intersected both the Garden Zone and a new mineralized inclusion-bearing

gabbro that assayed 1.41 g/t Pd Eq over 7 m from 223.0 to 230.0 m, however, the hole

terminated in mineralized gabbro. The Company plans to extend this hole to determine the

full extent of the new zone that is interpreted as a feeder dyke;

• Hole EB-21-53 intersected 2.38 g/t Pd Eq over 6.0 m from 173.0 to 179.0 m. This interval

is in the Garden Zone where mineralization is hosted in vari-textured gabbro that has shown

consistent mineralization for over 2.5 km strike length.

Wayne Tisdale, Canadian Palladium’s CEO, commented, “The discovery of a deeper zone below the

main Valhalla/Garden Zone mineralization presents exciting new potential for the East Bull Project.

The Company’s geologists consider that the new zone may be a mineralized feeder dyke or magma

conduit that is a potentially favourable structure for localizing high-grade mineralization. We look

forward to getting back on this new target as soon as site conditions permit access after spring

breakup.”

Mineralized intervals from holes EB-21-51, EB-21-52 and EB-21-53 are reported in Table 1.

Appendix 1 provides details of hole locations and orientations. Figure 1 shows the locations of the

drill holes.

1

Table 1: Diamond Drill Hole Results EB-21-51, 52, & 53

Hole ID From

(Metres)

To

(Metres)

Width

(Metres)

Pd

g/t

Pt

g/t

Au

g/t

Cu

%

Ni

%

Co

%

3PGM +

Au g/t

Pd Eq

Grams

per

Ton

EB-21-51 83 107 24 0.488 0.170 0.037 0.084 0.032 0.006 0.695 1.020

and 126 133 7 0.456 0.203 0.050 0.118 0.031 0.006 0.710 1.122

EB-21-52 104 108 4 0.587 0.185 0.071 0.160 0.044 0.007 0.842 1.379

and 159 170 11 0.488 0.151 0.048 0.097 0.052 0.006 0.687 1.074

Feeder

Dyke 223 230 7 0.379 0.013 0.065 0.307 0.036 0.008 0.571 1.406

EB-21-53 173 179 6 1.225 0.500 0.057 0.153 0.053 0.007 1.782 2.384

1. Individual demarked samples were sawn in half, bagged, sealed and transported by courier to the

laboratory. Duplicates, blanks and standards were introduced to the sample stream on site.

Samples were sent to AGAT Laboratories, Mississauga, Ontario. Each sample was analysed

using the AGAT Laboratories codes 202555, Fire Assay-ICP (50g); 201070, 4 Acid Digest / ICP-

OES Finish.

2. Reported widths are drilled widths, with true widths estimated to be 90 per cent of drilled widths

for minus-60-degree-holes to approximately 85 per cent of drilled width for minus-70-degree

holes.

3. Pd-Eq grade based on parameters in the May 23, 2019, NI 43-101 Resource Estimate and Technical

Report. Metal prices are based on 24-month trailing averages at January 31, 2018. In US$ these

prices are: Pd – $767/oz; Pt – $973/oz; Rh – $1,000/oz; Au – $1.262/oz; Cu – $2.53/lb; Ni –

$4.62/lb; Co – $20/lb.

The Company’s protocol is to analyze Rh after initially assaying for palladium, platinum and gold.

Once Rh results are received, the Rh concentrations will be reported and Rh will be included as a

component of 3PGM (palladium+platinum+rhodium) and included in calculations of palladium

equivalent (Pd-Eq).

The Company is currently drilling and assay results from holes EB-21-54 to EB-21-57 are in

progress. The Valhalla/Garden Zone Palladium mineralization is hosted within a 45° north dipping

vari-textured gabbro unit near the basal contact of the East Bull Gabbro. Drilling has successfully

focused on testing the on strike and downdip extension of this “contact-type” mineralization. Such

mineralization structures are typically tens of metres thick.

Mr. Garry Clark, P. Geo., of Clark Exploration Consulting, is the “Qualified Person” as defined in

NI 43-101, who has reviewed and approved the technical content in this press release.

Canadian Palladium Resources Inc.

Wayne Tisdale, President and CEO

T: (604) 639-4472

1

Figure 1. Drill intersections reported in this release relative to Garden and Valhalla Zones

of the East Bull Palladium Deposit. Base map is airborne total field magnetic survey.

Appendix 1. Drill Hole Location information

HOLE-ID UTM E UTM N LENGTH AZIMUTH DIP

EB-21-51 403777 5141331 225 180 -60

EB-21-52 403703 5141350 230 180 -60

EB-21-53 403589 5141350 251 180 -60

Drill collar coordinates are in NAD83 UTM 17N

Reader Advisory

This news release contains certain "forward-looking information" within the meaning of applicable securities law.

Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend",

"believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or

"will" occur. In particular, forward-looking information in this press release includes, but is not limited to, statements

with respect to the analytical results and exploration at the East Bull palladium property.

Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be

no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or

achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or

in part, as those set out in the forward-looking information. Forward-looking information is based on the opinions

and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties

and other factors that could cause actual events or results to differ materially from those anticipated in the forward-

looking information. Some of the risks and other factors that could cause the results to differ materially from those

expressed in the forward-looking information include, but are not limited to: general economic conditions in Canada

and globally; industry conditions, including governmental regulation and environmental regulation; failure to obtain

industry partner and other third party consents and approvals, if and when required; the availability of capital on

acceptable terms; the need to obtain required approvals from regulatory authorities; stock market volatility; liabilities

1

inherent in water disposal facility operations; competition for, among other things, skilled personnel and supplies;

incorrect assessments of the value of acquisitions; geological, technical, processing and transportation problems;

changes in tax laws and incentive programs; failure to realize the anticipated benefits of acquisitions and dispositions;

and the other factors. Readers are cautioned that this list of risk factors should not be construed as exhaustive. The

forward-looking information contained in this news release is expressly qualified by this cautionary statement. We

undertake no duty to update any of the forward-looking information to conform such information to actual results or

to changes in our expectations except as otherwise required by applicable securities legislation. Readers are

cautioned not to place undue reliance on forward-looking information.

Neither the Canadian Securities Exchange nor its Regulation Services Provider a ccepts responsibility for the

adequacy or accuracy of this release.