Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTU.V ·

BTU INTERSECTS COPPER-GOLD-SILVER MINERALIZATION OVER SUBSTANTIAL CORE LENGTHS IN FIRST TWO STEP-OUTS AT TNT -TNT TARGET EXTENDED BY 600 M TO 1600 M- Key developments:  Step-out drilling perpendicular to strike of TNT target has intersected 99.8 metres of visible copper

Drill Results

Suite 1240, 789 West Pender St. Vancouver, British Columbia

Phone: 604-683-3995/ Toll Free: 888-945-4770/Fax: 604-683-3988

BTU INTERSECTS COPPER-GOLD-SILVER MINERALIZATION OVER

SUBSTANTIAL CORE LENGTHS IN FIRST TWO STEP-OUTS AT TNT

-TNT TARGET EXTENDED BY 600 M TO 1600 M-

Key developments:

 Step-out drilling perpendicular to strike of TNT target has intersected 99.8 metres of visible copper

mineralization (chalcopyrite) in a hole collared 355 metres east of the discovery hole (BTU-19-13), as well

as a minimum of 62.3 metres of near surface (collared in mineralization) visible copper mineralization

collared 165 metres east of the discovery hole

 Drilling results support geophysical interpretation of IP and VTEM data over the TNT target and the IP

anomaly has now been extended by 600 metres to a footprint of 1600 metres north-south and 200-500

metres east-west, and the TNT target remains open to the north and south

 Hole spacing across TNT target has been planned to optimize coverage for upcoming down hole

geophysical surveys designed to refine high priority targets for future drilling

 Permits have been obtained for work programs to the south, where a historic airborne geophysical survey

shows additional electromagnetic targets roughly along trend of the TNT target - the Company plans to

commence drilling roughly 1200 metres to the south of the hole 13 discovery in the near future

 Contracted second lab for quicker assay turn around and for improved QAQC

 Assay results pending for holes 21-28, now drilling hole 29

January 29th, 2020, Vancouver, BC, Canada – BTU METALS CORP. ("BTU" or the "Company") (BTU-TSX:V) is

pleased to provide the following update on the Dixie Halo current work program. Widely spaced drill holes have

been, and continue to be, drilled in an orderly fashion across just the northerly portion of the newly discovered TNT

target (see PR dated December 6th, 2019). The initial large step-outs to the east, south and north on this early phase

of drilling at TNT have been planned to create an optimally spaced grid across the target area for upcoming

downhole geophysical surveying to better understand the extent of mineralization in the northern portion of the

large TNT target, with the view to ultimately finding high-grade massive sulphides. The initial two step-out drill

holes, BTU-19-19 and BTU-19-20, were located 165 and 355 metres east of discovery hole BTU-19-13 and

perpendicular to the strike of the TNT system. Drill core assay results from these two holes have proven the large

step-outs successful in identifying copper, silver and gold mineralization across the east-west span so far. BTU-19-

25 was drilled further east along the same line and visual inspection confirms that copper mineralization continues

to the east. Notably, the system is still open in all directions. Mineralogy, alteration, and polymetallic mineralization

consistent with footwall style mineralization in a volcanogenic massive sulphide (“VMS”) system has been

intersected in both holes 19 and 20 with higher grade mineralization and continuity of mineralization in the intervals

shown in Table 1 below. These two holes were drilled in a westerly direction from well to the east of the location

of previously announced hole 13 and intersected the mineralization at shallower depths than the mineralization in

discovery drill hole 13.

Paul Wood, CEO commented; “We are pleased to report additional assays from our new TNT target Cu-Au-Ag

discovery. The mineralization discovered in holes 19 and 20 confirms the presence of a large footprint sub-cropping

copper silver gold system that has never been drill tested before. These holes were completed as large step-outs to

the original discovery hole, across the strike of the system, and I’m very pleased that the results validate our team’s

geophysical interpretations of the IP and VTEM data. Our geological team has taken a highly disciplined, systematic

approach which will help us expeditiously find potential massive sulphide bodies and this is absolutely appropriate

given the scale of this 640,000 m 2 and growing, delineated mineralized target area. We also look forward to

providing updates on our work on the Dixie Creek target once the SGH program results report is received and we

have collected additional geophysical data as part of our evaluation of the northeast portion of our property close to

the high-grade gold targets being pursued by Great Bear Resources.”

Bruce Durham, VP of Exploration stated; “Our selected drill locations to date have been laid out in such a way that

we will get maximum coverage with our down hole electromagnetic surveying program in the northern part of the

TNT target. We are taking a methodical and judicious approach that will demonstrate the potential of the project

in the short-term while setting us up for long-term results. On the southern side of TNT we are now permitted and

our geophysical program there is underway. We are now able to work towards defining drill targets moving closer

to where initial VTEM anomaly conductivity and historic airborne electromagnetic conductivity is indicated to be

strongest.”

Table 1: BTU-19-19 and 20 selected assay results

† Note that hole BTU-19-19 collared in mineralization and therefore did not intersect the full width of the

mineralized zone

* Metal equivalency based on US$2.70/lb Cu, US$1350/oz Au, and US$17/oz Ag; noting that no adjustments were

made in the metal equivalency calculation for metal recovery, as this is still an early stage project.

Table 2: Drill hole collar information

Drill Hole Azimuth (°) Dip (°) UTM E (m) UTM N (m)

BTU-19-19 277.7 -45.7 463134 5628474

BTU-19-20 272.2 -43.0 463323 5628490

TNT

 Highlight assays from hole 19 include:

o Total of 62.3 metres of notable mineralization

o Hole 19 collared into mineralization and therefore did not intersect the entire width of the mineralized

zone

o Largest interval of continuous mineralization is 60.0 metres of 0.27% CuEq, which includes 8.25 metres

of 0.56% CuEq

o Highest assay results: 0.6 g/t Au over 0.6 metres; 30.7 g/t Ag over 1 metre; and 1.33% Cu over 1 metre

 Highlight assays from hole 20 include:

o Total of 99.8 metres of notable mineralization

o Largest interval of continuous mineralization is 77.4 metres of 0.44% Cu equivalent mineralization,

which includes numerous subintervals of higher-grade mineralization, including 2.3 metres of 1.47%

CuEq

o Highest assay results: 0.32 g/t Au over 0.7 metres; 29.6 g/t Ag over 0.7 metres; and 1.77% Cu over 0.7

metres

 Both holes intersected mineralization in a number of intervals between surface and roughly 150 metres vertical

depth

 When considered with the mineralization in discovery hole BTU-19-13, the mineralization is now known to

extend from surface to at least approximately 250 metres

 Continuity of mineralization in large step-outs on Line 12, perpendicular to the strike of the TNT target,

confirms the significance of the geophysical interpretation of the IP and VTEM data in the TNT target area

 Drill holes BTU-19-21, 22, 23 and 24 were completed in December 2019 and holes BTU-20-25, 26, 27 and 28

have been completed so far in January 2020 on the TNT target

 Ongoing Induced Polarization surveys have now traced the TNT target from section 16+00N to at least line

0+00, a total length of 1600 metres, representing an increase in the strike length of the TNT target of 60%

 Permits for exploration work, including drilling, have been received for the newly acquired ground to the south

on the TNT target and exploration plans are underway

 Drill targets to the south of the current southerly limit of the TNT target are expected to be ready for drill testing

in February

 Other potential drill targets have been identified approximately 400 metres to the east of the TNT target as well

as well to the northeast of the TNT target close to the mutual boundary with Great Bear Resources’ Dixie

property

Dixie Creek

 SGH sample program: The Company expects to receive the results of the survey imminently

 Additional survey lines have been established and Induced Polarization surveying commenced

 Ground magnetic surveying planned for February

 Drilling on the Dixie Creek expected to recommence in February

Table 3: BTU-19-19 and 20 assay results

Drilling is ongoing to further explore the TNT target. The Company is undertaking exploration work to define the

full scope of the TNT chargeability target and now understands the footprint of the target to be at least 1600 metres

north-south and between 200 and 500 metres east-west as defined by IP chargeability and resistivity survey data

(Figure 2). The target remains open both to the north and to the south.

Holes 19 and 20 were drilled to the East of discovery hole 13 while recently completed holes 21 and 22 were drilled

approximately 800 metres to the south of where 13, 19 and 20 were drilled. Drill hole 25 was collared well behind

drill hole 20 to test the eastern portion of the TNT IP target on Line 12+00N. Split core samples from holes 21

through 25 are currently at the laboratory for analysis. Bedrock in the entire area of the interpreted TNT target is

overlain with overburden and no historic drilling is reported on the area currently covered by the existing

geophysical surveys. Strong alteration and significant pyrite as well as some chalcopyrite was found in each location

drilled to date. Minor amounts of galena, sphalerite and molybdenite were also noted in some of the drill holes.

Figure 1: Overview of BTU Metals Dixie Halo Property

Figure 2: IP Anomaly Map of the TNT Target Area shows the current limits of the IP surveying and the extent of the interpreted TNT target

Rock types intersected in the drilling include highly altered and bleached basalt, rhyodacite tuffs and flows as well

as felsic and mafic intrusive bodies. Mineralization intersected in the holes completed to date is comprised of

disseminated pyrite with scattered disseminated to occasional stringer chalcopyrite.

To view pictures of drill core please visit the Company’s website here: www.btumetals.com/core. Note: core

pictures are for general interest only and are selected samples. The pictures should not be considered to represent

the entire mineralized interval.

QA/QC

BTU staff collected and processed samples and securely sealed and shipped them to Activation Laboratories Ltd.

(ActLabs) in Dryden, Ontario for sample preparation that includes drying, crushing until 80% passes a 2 mm

sieve, then riffle splitting (250 g) and pulverizing (mild steel) to 95% passing 105 µm. The resulting pulps are

analysed for gold by fire assay in Dryden, and for base metals by a multi-element aqua regia ICP-OES technique

in Thunder Bay. All assay data have undergone internal validation of QAQC; noting there is an established

sampling control program with blind insertion of assay blanks, certified industry standards and sample duplicates.

A QAQC program is also in place at Actlabs and includes insertion of blanks, standards, and duplicate reanalysis

of selected samples. ActLabs is a Canadian assay laboratory and is accredited under ISO/IEC 17025 and ISO

9001. Overlimit protocols are in place for gold, silver, and copper.

Intervals in this release are drilled intervals. True widths could not be determined at this early stage of target

evaluation.

The technical contents of this release were approved by Mr. Bruce Durham, P. Geo., a qualified person as defined

by National Instrument 43-101.

ON BEHALF OF THE BOARD

“Paul Wood”

Paul Wood, CEO, Director

[email protected]

FOR FURTHER INFORMATION, PLEASE CONTACT:

Andreas Curkovic, Investor Relations

+1 416-577-9927

BTU Metals Corp.

Telephone: 1-604-683-3995

Toll Free: 1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future

performance and reflect management’s current expectations and assumptions. Such forward-looking statements reflect management’s

current beliefs and are based on assumptions made by and using information currently available to the Company. Investors are cautioned

that these forward-looking statements are neither promises nor guarantees, and they are subject to risks and uncertainties that may cause

future results to differ materially from those expected. These forward -looking statements are made as of the date hereof and, except as

required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new

events or circumstances. All forward-looking statements made in this press release are qualified by these cautionary statements and by

those made in our filings with SEDAR in Canada (available at WWW.SEDAR.COM).