Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTU.V ·

BTU Finds Multiple Structures ON D2 Fold at Dixie Halo

Exploration Programs

Suite 1240, 789 West Pender St. Vancouver, British Columbia

Phone: 604-683-3995/ Toll Free: 888-945-4770/Fax: 604-683-3988

BTU FINDS MULTIPLE STRUCTURES ON D2 FOLD AT DIXIE HALO

February 20, 201 9, Vancouver, BC, Canada – BTU METALS CORP. (“BTU ” or th e “Company”) (BTU -

TSX:V) announces preliminary findings of an ongoing, in-depth assessment of geophysical data covering BTU’s

Dixie Halo project, in addition to the surrounding region by well known geophysicist Mr. Alan King of Sudbury,

Ontario. Initial findings of note include the existence of multiple zones of major D2 fold disruption (see Fig 1). The

D2 fold within the Dixie Halo boundaries is of particular interest to BTU as these have been successful indicators

for neighboring Great Bear Resources Ltd. (GBR-TSX:V) at its Dixie Project. Additionally, the Red Lake-Campbell

complex (Red Lake gold mine) also occurs proximal to a regional D2 fold where shear zones developed and acted

as primary hydrothermal fluid conduits.

Mr. King’s experience includes posts as manager of geophysics at Inco with responsibility for global exploration

as well as chief geophysicist for Vale Global Exploration working on geophysical applications and target generation

using regional and global data sets. Since 2012 he as been working as a consultant specializing in integrating earth

science data in gold and other commodities.

“After reviewing the property and regional geophysical data it is apparent, mainly from recent (2016) OGS magnetic

data, that there are two major East- West disruptions in what has been interpreted (Great Bear Resources 2018) as

a large D2 (Deformation event 2) fold that extends across the Great Bear property and south onto the BTU claim

block. This is considered significant as the northern structure hosts the new Great Bear high grade gold di scovery

and the second similar structure, about 2000 meters to the south, is located mainly on the BTU claims. This

environment has some similarities to the Red Lake mines area where the two major parallel Dickenson and

Campbell shears disrupt an F2 fold (Folding event 2) structure and host high grade gold mineralization (Dube 2001

Preliminary report on the geology and controlling parameters of the Goldcorp Inc. High Grade zone, Red Lake

mine). This structure on the BTU claims is considered a priority target for followup.

Several other structures at various scales are apparent on the interpreted large D2 fold on the BTU property and

these may be of interest for exploration as well.” stated Mr. King.

A full report on Mr. King’s findings will be posted on the BTU website once complete.

“We are very encouraged by Mr. King’s initial findings – D2/F2 folds have been excellent indicators in the Red

Lake complex so naturally this is tremendous news for BTU and a great place to focus and define drill targets .”

stated Paul Wood, CEO of BTU Metals Corp. “This also follows closely with BTU Advisor and retired Red Lake

resident geologist, Dr. Pryslak’s interpretation and concepts covering our Dixie Halo project.”

Figure 1: Colour mag 1VD data of BTU Metal’s property surrounding that of Great Bear Resources is shown in

black outline with location of Great Bear Resources Hinge Zone Discovery shown.

Fig. 1

To view reports and maps of the Dixie Halo Project please visit https://www.btumetals.com/?project=3. The drill

hole intersection reported on the property location map is not on the Company’s Dixie Halo

Property. Mineralization that may be hosted on adjacent properties is not representative of mineralization that is,

or may be, hosted on the Company’s Dixie Halo Property.

The technical contents of this release were approved by BTU’s VP Exploration Mr. Doug Hunter , P. Geo., a

qualified person as defined by National Instrument 43-101.

ON BEHALF OF THE BOARD

“Paul Wood”

Paul Wood, CEO, Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Telephone: 1-604-683-3995

Toll Free: 1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven ture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or future

performance and reflect management’s current expectations and assumptions. Such forward-looking statements reflect management’s

current beliefs and are based on assumptions made by and information currently available to the Company. Investors are cautioned

that these forward looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause

future results to differ materially from those expected. These forward -looking statements are made as of the date hereof and, except as

required under applicable securities legislation, the Company does not assume any ob ligation to update or revise them to reflect new

events or circumstances. All of the forward-looking statements made in this press release are qualified by these cautionary statements

and by those made in our filings with SEDAR in Canada (available at WWW.SEDAR.COM).