Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTU.V ·

BTU Drilling Update

Exploration Programs

Suite 1240, 789 West Pender St. Vancouver, British Columbia

Phone: 604-683-3995/ Toll Free: 888-945-4770/Fax: 604-683-3988

BTU DRILLING UPDATE

May 10, 2022 Vancouver, BC, Canada – BTU METALS CORP. ("BTU" or the "Company") (BTU-

TSX:V; BTUMF-OTC) today announces the completion of drilling of four holes (Figure 1), totalling

1299 metres, in an area immediately south of the Kinross Dixie-BTU border and adjacent to Dixie

Creek, which trends northwest from the drilling area towards the LP fault mineralization approximately

2 km away. The holes are targeting an interpreted structure which forms a series of breaks in

geophysical features extending toward the LP fault and following the trend of Dixie Creek.

Paul Wood, BTU CEO, commented, “The most recent holes drilled adjacent to Dixie Creek

continue to provide further geological data in a completely overburden covered area. We know

that splays off of gold-bearing fault structures in greenstone belts can contain significant gold

deposits. We have seen strong alteration and areas with pyrite and arsenopyrite and await assays

from the four recent holes. While we await results from the lab our geological team is reviewing

our expanding database and prioritizing the next targets on our very large property.”

Figure 1: Collars and traces of the four recently completed drill holes, just south of the Kinross-BTU Metals border, and adjacent to Dixie

Creek. The base maps show topography and the second vertical derivative of magnetics.

Drill core from the four holes is currently being logged and sampled in Red Lake. Logging and sampling

will be completed in the next two weeks.

Geology of Tooth Holes

The rocks encountered in the drill program that have been logged to date range from metasediments in

the north, into mafic to intermediate volcanics, and back to metasediments to the south. Strong to

moderate shearing is ubiquitous. Quartz, quartz-carbonate, and calcite veins, veinlets and stringers are

also ubiquitous, ranging from a few percent in most units and up to 25% in areas of stockwork veining.

Alteration is variable, with many units exhibiting moderate to strong alteration. Alteration types

observed include sericite, silicification, carbonate, chlorite, and biotite. Pyrite is the dominant

mineralization seen in the drill holes, minor chalcopyrite also occurs in all holes, and minor arsenopyrite

was noted in some holes.

Pakwash Drill Program

Four holes were drilled on the ice on Pakwash Lake in February, to test three separate geophysical

targets (see BTU press release from February 9, 2022). Core from the holes has been logged and

sampled. Assays results are pending for all holes. This drill program was partially funded by the Ontario

Junior Exploration Program.

Figure 2: Drill holes PN-1, PN-1A, PN-2, PN-3 and PN-4 were drilled on the ice in February of 2022.

Fall 2021 Drill Program

Ten holes, totalling 1717 metres, were drilled in widely spaced holes in the Rose Lake, Hiewall Lake,

and Tooth areas of the property. Hole 76 had the highest assay result of 682 ppb Au over 0.5 metres

(41.3 to 41.8 m). Hole 76 had several other notable intercepts, including: 270 ppb Au (94-95 m); 184

ppb Au (95-96 m); 223 ppb Au (96-96.9 m); 448 ppb Au (113.85-114.3 m); and 166 ppb Au (146.75-

148.05 m).

Table 1: Hole locations and highest assay result from each drill hole from the Fall 2021 drill program

Hole East North Max Gold (ppb)

BTU-21-67 453613 5628815 91

BTU-21-68 453810 5629194 144

BTU-21-69 453578 5629444 44

BTU-21-70 452943 5628048 78

BTU-21-71 452834 5628149 273

BTU-21-72 446800 5626000 9

BTU-21-73 446800 5626000 16

BTU-21-74 445189 5626017 25

BTU-21-75 445177 5625818 84

BTU-21-76 457548 5630939 682

The holes provided useful geological information in areas which had never been drilled before and

which are largely covered with overburden.

Bruce Durham, P. Geo., a qualified person as defined by National Instrument 43-101 has reviewed and

approved the technical information in this press release.

ON BEHALF OF THE BOARD

“Paul Wood”

Paul Wood, CEO, Director

[email protected]

FOR FURTHER INFORMATION, PLEASE CONTACT:

Andreas Curkovic, Investor Relations

Telephone 1-416-577-9927

BTU Metals Corp.

Telephone: 1-604-683-3995

Toll Free: 1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING STATEMENTS: This news release contains forward-looking statements, which relate to future events or

future performance and reflect management’s current expectations and assumptions. Such forward-looking statements reflect

management’s current beliefs and are based on assumptions made by and using information currently available to the Company.

Investors are cautioned that these forward-looking statements are neither promises nor guarantees, and they are subject to risks and

uncertainties that may cause future results to differ materially from those expected. These forward-looking statements are made as of

the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update

or revise them to reflect new events or circumstances. All forward-looking statements made in this press release are qualified by these

cautionary statements and by those made in our filings with SEDAR in Canada (available at WWW.SEDAR.COM).