Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTU.V ·

BTU Announces Drill Program at the Echum Project, Adjacent to Island Gold District, Ontario Ontario Junior Exploration Program (OJEP) Funding

Exploration Programs

Suite 1240, 789 West Pender St. Vancouver, British Columbia

BTU Announces Drill Program at the Echum Project, Adjacent to Island Gold District,

Ontario

Ontario Junior Exploration Program (OJEP) Funding

December 9, 2024 Vancouver, BC, Canada – BTU METALS CORP. (“BTU” or the “Company”) (BTU-TSX:V

BTUMF-OTC) announces an update on exploration efforts at its’ 100% held Echum project, an extensive

gold prospect located adjacent to Alamos Gold Inc. (“Alamos”) (AGI-TSX) and Red Pine Exploration (“Red

Pine”) (RPX-TSX:V) in the active Wawa gold area of northern Ontario (Figure 1).

The Company expects it will provide a progress update on the Kinross (K-TSX) option adjacent to the

Great Bear gold mine development project in the near future.

Wawa Projects Exploration Highlights

• Echum Project:

o Winter diamond drilling planned for central Echum, targeting host rocks extending from

the adjacent Alamos Island Gold Mine property.

o Received Ontario Junior Exploration Program (OJEP) funding approval, offering up to

CAD$200,000 in non-dilutive support for 2024-2025 activities.

• Hubcap & Centennial Project:

o Red Pine recently reported gold assay results of up to 17.1 g/t gold from their War Eagle

gold zone, just 700m from the boundary (see RPX PR, Nov 27, 2024).

o Surface sampling is complete, and assay results are pending.

o IP survey lines are being prepared for spring 2025.

• Current Exploration Activities:

o Focused on Echum property with line cutting, geophysics, prospecting, and core drilling.

o Leveraging data from neighboring companies to refine exploration targets.

• Property Overview:

o The company holds over 750 mining claims, covering a total area of 16,048 hectares.

o Projects benefit from nearby infrastructure, including roads, highways (Trans -Canada

Highway), Wawa town, an airport, water and power access, a mining -aware population,

and an available labour pool.

Figure 1: BTU's Wawa Properties and their proximity to Red Pine's Wawa Gold Project and Alamos' Island Gold District

The Company acquired the Echum, Hubcap, and Centennial Projects (“Wawa Projects”) earlier this year

(Figure 1) (see PR dated May 7, 2024). The Echum gold exploration project is adjacent to Alamos’ Island

Gold District project in the northern portion of the Wawa Gold District while the southern Wawa projects

are comprised of the Hubcap Gold Project adjacent to the south and southwest of Red Pine and the

Centennial Project adjacent to the south of Red Pine Exploration (Figure 1).

Each of the Wawa Projects covers areas of historic gold mineralization and none of the projects have

been the subject of significant or comprehensive exploration in recent years. BTU is the first company to

have assembled the entire land position to the south of the Wawa Gold Project being explored by Red

Pine. With the entire land position assembled the Company is, for the first time, systematically exploring

the large Hubcap land position that covers a number of previously undocumented shears, faults, quartz

veined and strongly altered and potentially gold mineralized areas. Work completed in recent months

has included compilation, historic data review, drill core review, prospecting and line-cutting. With the

advent of winter, prospecting has been suspended for the season and sample results for several sample

shipments are in process at the AGAT Laboratories facility in Thunder Bay and more are being shipped

for analysis. Results are expected in the coming weeks. Induced polarization surveys, the next planned

step in the property wide exploration program for Hubcap will commence in the spring when the line-

cutting is completed and conditions for the survey work are better.

On November 27, 2024, Red Pine announced new gold assay results at its War Eagle gold occurrence

well south of the area of its 43-101 mineral resources and within 700 meters of the boundary of the

Company’s’ Hubcap property. The trend of the general geology in the area of the War Eagle occurrence

and the trend of some of the geology on the Company’s Hubcap property are between 160 and 200

degrees indicating potential for gold mineralization on the two properties to be related. Grab sample

results reported by Red Pine in its recent release range as high as 17.1 g/t gold (www.redpineexp.com).

(Note: Grab samples are not representative of the overall grade of mineralized areas.)

Prospecting at Hubcap Property took place in Fall 2024. Surface sampling at Hubcap encountered highly

altered outcrop containing veining in previously undocumented areas of the Hubcap Property (Figure 2).

The Company is eagerly awaiting assay results from samples collected during the field season.

Figure 2: Hubcap Property Prospecting, awaiting assay results

BTU CEO Paul Wood commented; “We are excited to be commencing an initial drill program on some

of the geophysical targets already identified on the Echum property. While early stage, these are

compelling and are completely untested targets on a very large, underexplored property position

adjacent to one of the highest-grade gold mines in Canada. At the same time, we are awaiting assay

results from our prospecting programs on the Hubcap property and we have prepared grids for IP surveys

on both Hubcap and Centennial properties. Meanwhile, Kinross is continuing to progress early

exploration work at our Dixie Halo project adjacent to their world class Great Bear project under the

terms of the 2023 Exploration Option Agreement.”

OJEP Grant

“Our government’s dedication to fostering a thriving and sustainable mining industry is demonstrated

through strategic investments in exploration,” said George Pirie, Minister of Mines. “With $200,000 in

funding through the Ontario Junior Exploration Program (OJEP), the work done by BTU Metals Corp. in

the Michipicoten Greenstone Belt will uncover more of northern Ontario’s mineral wealth, helping to

create jobs, support local communities and deliver prosperity to all corners of Ontario.”

Qualified Person

Bruce Durham, P. Geo., a qualified person as defined by National Instrument 43-101 has reviewed and

approved the technical information in this press release.

About BTU

BTU Metals Corp. is a junior mining exploration company looking to acquire high quality exploration

projects to add to its portfolio for the benefit of its stakeholders. The Company’s main assets are the

Dixie Halo Project located in Red Lake, Ontario immediately adjacent to the Great Bear Project and the

recently acquired gold properties in the active Wawa gold district. The Company has no debt, minimal

property obligations and maintains a cash balance of approximately $1.2 million.

ON BEHALF OF THE BOARD

“Paul Wood”

Paul Wood, CEO, Director

[email protected]

BTU Metals Corp.

Telephone: 1-604-683-3995

Toll Free: 1-888-945-4770

Cautionary Statement

Trading in the securities of the Company should be considered highly speculative. No stock exchange, securities commission or other regulatory authority has

approved or disapproved the information contained herein. Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of

the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain “forward-looking information” within the meaning of applicable Canadian securities laws that are based on expectations,

estimates and projections as at the date of this news release. The information in this release about future plans and objectives of the Company is forward-

looking information. Other forward-looking information includes but is not limited to information concerning: the intentions, plans and future actions of the

Company.

Any statements that involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or

performance (often but not always using phrases such as “expects”, or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”,

“budget”, “scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or

results “may” or “could”, “would”, “might” or “will” be taken to occur or be achieved) are not statements of historical fact and may be forward-looking

information and are intended to identify forward-looking information.

This forward-looking information is based on reasonable assumptions and estimates of management of the Company at the time it was made, and involves

known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially

different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others:

risks relating to the global economic climate; dilution; future capital needs and uncertainty of additional financing; the competitive nature of the industry;

currency exchange risks; the need for the Company to manage its planned growth and expansion; the effects of product development; protection of

proprietary rights; the effect of government regulation and compliance on the Company and the industry; reliance on key personnel; global economic and

financial market deterioration impeding access to capital or increasing the cost of capital; and volatile securities markets impacting security pricing unrelated

to operating performance. The Company has also assumed that no significant events occur outside of the normal course of business. Although the Company

has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as

anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company

undertakes no obligation to revise or update any forward-looking information other than as required by law.