North Brenda Project – Drilling Results Assays have been received from Bitterroot Resources Ltd.’s (BTT, TSX-V) nine-hole, 1,361- metre drilling program at the Plateau Zone on the North Brenda gold-silver project in southern
BITTERROOT RESOURCES LTD.
Suite 206-B, 1571 Bellevue Avenue, West Vancouver, BC, V7V 1A6
tel 604 922 1351
www.bitterrootresources.com
NEWS RELEASE
September 20, 2018
North Brenda Project – Drilling Results
Assays have been received from Bitterroot Resources Ltd.’s (BTT, TSX-V) nine-hole, 1,361-
metre drilling program at the Plateau Zone on the North Brenda gold-silver project in southern
British Columbia. This drilling tested areas below and along strike from gold-silver-bearing
sulphide vein-style mineralization and alteration exposed in trenches.
Numerous narrow quartz veins were encountered in the drill holes, with associated chlorite and
sericite alteration and geochemically anomalous gold content. The assay results received from
the drill program were not of economic tenor. The best results from the sampling were 0.90 g/t
gold over 1.45 metres in hole 6 and 0.92 g/t gold over 0.61 metres, as well as 0.24 g/t gold over
4.33 metres in hole 5. Pyritic quartz veins in the drilled areas carry gold values which are the
likely source of the gold-in-soil anomalies. High gold grades from mineralized zones in surface
trenches above the drilled areas appear to have been caused by surface enrichment or weathering.
The Qualified Person, as defined in NI 43-101, responsible for the technical content of this news
release is Jeffrey D. Rowe, P.Geo.
ON BEHALF OF THE BOARD OF DIRECTORS
Michael S. Carr
Director
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FORWARD LOOKING STATEMENTS: This document contains statements about expected or anticipated future
events and/or financial results that are forward -looking in nature and as a result, are subject to certain risks and
uncertainties, such as general economic, market and business conditions, regulatory processes and actions, technical
issues, new legislation, competitive conditions, the uncertainties resulting from potenti al delays or changes in plans,
the occurrence of unexpected events and the company’s ability to execute and implement its future plans. Actual
results may differ materially from those projected by management. For such statements, we claim the safe harbour for
forward-looking statements within the meaning of the Private Securities Legislation Reform Act of 1995.