BITTERROOT RESOURCES INTERSECTS HIGH NICKEL GRADES IN MASSIVE SULPHIDE MINERALIZATION Bitterroot Resources Ltd. (symbol BTT, TSX-V) has received assays for holes LM 21-13 and LM 21-14 at its LM Project in the Upper Peninsula of Michigan. The assays continue
BITTERROOT RESOURCES LTD.
Suite 206-B, 1571 Bellevue Avenue,
West Vancouver, BC, V7V 1A6
tel 604 922 1351
www.bitterrootresources.com
NEWS RELEASE
October 13, 2021
BITTERROOT RESOURCES INTERSECTS HIGH NICKEL
GRADES IN MASSIVE SULPHIDE MINERALIZATION
Bitterroot Resources Ltd. (symbol BTT, TSX-V) has received assays for holes LM 21-13
and LM 21-14 at its LM Project in the Upper Peninsula of Michigan. The assays continue
to confirm that the massive and semi-massive sulphides intersected are enriched in nickel
and copper, with overlying disseminated mineralization occurring in hole LM 21 -13, but
absent in LM 21-14.
Details of Mineralized Intervals*
LM 21-13
From
(m)
To
(m)
Interval
(m) Rock Type Ni
(%)
Cu
(%)
Au +
PGM
(ppm)
247.68 250.36
2.68 Upper Disseminated Mineralization 0.33 0.38 0.10
250.36 250.75
0.39 Semi-Massive Sulphide 1.81 0.51 0.52
3.07 TOTAL 0.52 0.40 0.15
LM 21-14
From
(m)
To
(m)
Interval
(m) Rock Type Ni
(%)
Cu
(%)
Au +
PGM
(ppm)
235.79 236.06
0.27 Semi-Massive Sulphide 1.96 0.01 0.01
236.06 236.86
0.80 Massive Sulphide 4.81 1.05 0.25
1.07 TOTAL 4.09 0.78 0.19
* Intervals are drill intersections and not necessarily true widths. True widths
cannot be calculated at this time due to insufficient information on the
orientation of the mineralized zones.
Holes LM 21-13 and LM 21-14 were the second and third holes completed in the summer
2021 drilling campaign, which commenced in early June . Four holes drilled this summer
exited the intrusion above the elevation of the sulphide mineralization and three holes did
not intersect the intrus ion. The drilling completed to date has given our team a better
understanding of the orientation of the LM intrusion and the position of the basal
mineralized intervals within it. A map showing the location of drill holes completed to date
is attached to this news release and posted on www.bitterrootresources.com.
The tenth hole of the summer program is currently underway, targeting mineralization in
the southeast quadrant, which appears to host the keel of the steeply plunging LM intrusion.
An eleventh hole is planned prior to October 31, after which, drilling will pause for hunting
season. Discussions with adjacent mineral tenure holders are continuing. Management
plans to resume drilling in the winter of 2022.
Exploration of the LM Project is being funded by Bitterroot Resources Ltd. (51%) and
privately-owned joint venture partner Below Exploration Inc. (49%).
Mr. Glenn W. Scott, CPG, is the Qualified Person responsible for the technical content of
this release.
Quality assurance/Quality control
Bitterroot Resources Ltd. used ALS Canada Ltd. ( “ALS”) for geochemical analyses and
assaying. ALS is a global leader in analytical services. The samples were analyzed at
ALS’s secure, ISO 17025 -certified laboratory in North Vancouver, BC, Canada, by 33 -
element four acid leach and Fire Assay, both with ICP-AES finish.
Analytical quality assurance and quality control (QA/QC) confirming the accuracy of the
analyses were performed by ALS using twelve (12) standard samples and two (2) blanks.
Core samples were transferred on a daily basis from the drill site to Bitterroot’s secure core
storage and logging facility. After leaving the drill site, core samples were in the custody
of Bitterroot’s personnel or in secure storage. The two (2)-inch (5 cm)-diameter NQ-sized
drill core was cut with a rock saw. Half of the c ore was shipped to ALS for sample
preparation and analysis and half retained. The samples were tagged, bagged and boxed by
Bitterroot personnel and shipped via courier to ALS in North Vancouver, B.C.
ON BEHALF OF THE BOARD OF DIRECTORS
Michael S. Carr
Director
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of
the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FORWARD LOOKING STATEMENTS: Certain statements contained in this press release may constitute
forward-looking statements under Canadian securities legislation. Generally, forward -looking information
can be identified by the use of forward -looking terminology such as “expects” or “it is expected”, or
variations of such words and phrases or statements that certain actions, events or results “will” occur. This
document contains statements about expected or anticipated future events and/or financial results that are
forward-looking in na ture and as a result, are subject to certain risks and uncertainties, such as general
economic, market and business conditions, regulatory processes and actions, technical issues, new
legislation, competitive conditions, the uncertainties resulting from po tential delays or changes in plans, the
occurrence of unexpected events and the company’s ability to execute and implement its future plans. Actual
events may differ materially from those projected in t he forward -looking statements. When relying on
forward-looking statements to make decisions, investors and others should carefully consider the foregoing
factors and other uncertainties and should not place undue reliance on such forward-looking statements. The
Company does not undertake to update any forward -looking statements, except as may be required by
applicable securities laws. For such forward -looking statements, we claim the safe harbour for forward -
looking statements within the meaning of the Private Securities Legislation Reform Act of 1995.
!
!. !.
!.
!. !.
"/
"/
"/
"/
"/
"/
"/
"/ "/
"/
"/
"/"/
"/
"/
"/
"/
"/
"/
"/
"/
LM-21-12
LM-21-16
LM-21-17
LM-21-18
LM-21-19
LM-21-20
LM-21-14
LM-20-03
LM-20-04
LM-21-09
LM-21-11
LM
-21-06
LM-21-10
LM
-21-05
LM-21-08
LM-20-01
LM-21-07
LM-21-13
LM-21-15
LM-21-21 (in progress)
Drill collar
Completed corehole
"/ Intrusion / Metasediments contact
!. Mineralized intercepts
Roads and trails
Creek
±
0 100 200 300 400 50050
Feet
0 10050
Meters
LM PROPERTY
GROUND MAGNETICS - REDUCED TO POLE - ANALYTIC SIGNAL
Date: OCT 12, 2021
LM-21-21
LM
-20-02