Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTR.V ·

Bonterra Intersects 15.27 g/t Au over 3.39 m and Extends

Drill Results

2872 Sullivan Rd Suite 2

Val-d’Or, Quebec

Office: (819) 825-8678

Bonterra Intersects 15.27 g/t Au over 3.39 m and Extends

Mineralization at Moroy

Val-d’Or, QC – February 2 7, 2020: Bonterra Resources Inc. (TSX-V: BTR, OTCQX:

BONXF, FSE: 9BR2) (the “Company” or “Bonterra”) is pleased to announce that the recently

completed drilling has extended the M1 Zone in the Moroy deposit.

Assays have been received for drill holes recently completed on the M1 Zone in the Moroy deposit.

The focus of the drilling has been the extension of the M1 Zone mineralization up-plunge using a

drill from surface and down -plunge utilizing an underground rig. Highlights include an

intersection of 15.27 grams per tonne (“g/t”) Au over 3.39 metres (“m”) in an up-plunge position

and 8.14 g/t Au over an intersection length of 3.61 m extending mineralization down plunge. The

new drill intercepts indicate a significant extension of the M1 Zone and, combined with re -

interpretation of the existing drilling, supports a zone of demonstrated continuity beyond the limits

used for the current resource estimate. Significant intercepts from the recently completed holes

within the M1 Zone are contained in the table below. These holes, as well as those drilled on the

M1 structure but outside of the plunging zone of mineralisation, are plotted on the long section

attached.

The Company is currently completing a bulk sample on the 11 th Level in the M1 Zone. The

location of the bulk sample is indicated in the long section attached. In addition, the Company is

completing selected in fill drilling to support future resource to reserve conversion and mine

planning.

Greg Gibson, CEO of Bonterra stated: “We are continuing to advance Moroy towards inclusion in

a mine plan and we continue to execute our strategy of advancing resource s in other targets at

Moroy and our other assets, Barry and Gladiator, to support a long term mine life.”

Analyses and QAQC

Gold analyses of Moroy drill core are completed at the Bachelor Mine assay laboratory. The

Company employs an industry standard QAQC program that includes duplicate analyses from pulp

and coarse rejects and the use of Certified Reference Materials (CRM) and blanks. Check assa ys

on a minimum of 10% of the samples are completed at ALS Laboratories in Val-d’Or.

Qualified Person

Jamie Lavigne, P.Geo and VP Exploration for the Company has approved the information

contained in this release. Mr. Lavigne is a Qualified Person as defined by NI43-101.

Hole ID From

(m) To (m) Length

(m)

True

Thickness

(m)

Au (g/t) Zone Drill

MY19-162 115.31 117.62 2.30 1.93 3.83 M1-2 Underground

including 115.31 116.40 1.08 0.91 7.59 M1-2 Underground

- 2 -

MY19-164 212.09 217.85 5.76 3.15 3.59 M1-1 Underground

including 213.31 217.85 4.54 2.49 4.32 M1-1 Underground

MY19-172 127.94 135.87 7.92 6.62 2.36 M1-2 Underground

including 130.20 131.98 1.78 1.48 7.63 M1-2 Underground

MY19-182 185.20 198.74 13.55 10.54 1.51 M1-1 Underground

including 195.26 197.01 1.75 1.38 5.12 M1-1 Underground

MY19-183 246.34 252.76 6.41 3.43 4.80 M1-1 Underground

including 248.15 251.76 3.61 1.92 8.14 M1-1 Underground

MY19-186 285.82 294.05 8.23 3.56 4.35 M1-1 Underground

including 290.64 294.05 3.41 1.46 7.00 M1-1 Underground

MY19-187 291.13 300.24 9.12 3.56 1.80 M1-1 Underground

including 293.38 295.46 2.07 0.81 5.19 M1-1 Underground

MY19-188 217.44 223.63 6.19 3.29 4.56 M1-1 Underground

including 218.54 222.16 3.63 1.93 6.15 M1-1 Underground

MO-19-230 313.87 325.33 11.46 9.69 6.02 M1-3 Surface

including 315.09 324.53 9.44 7.98 7.09 M1-3 Surface

including 316.87 320.26 3.39 2.87 15.27 M1-3 Surface

MO-19-232 207.01 211.58 4.57 3.95 2.39 M1-3 Surface

including 207.01 209.22 2.21 1.91 4.78 M1-3 Surface

including 207.01 208.61 1.60 1.38 6.09 M1-3 Surface

MO-19-241 399.19 405.95 6.76 6.23 4.91 M1-1 Surface

including 400.44 403.10 2.66 2.46 11.21 M1-1 Surface

MO-19-247 371.13 377.56 6.42 6.24 3.36 M1-3 Surface

including 374.55 376.79 2.24 2.18 7.63 M1-3 Surface

True thickness is estimated for each intercept.

- 3 -

FOR ADDITIONAL INFORMATION:

Investor relations: Allan Folk

[email protected]

2872 Sullivan Road, Suite 2, Val-d’Or, Quebec J9P 0B9

819-825-8676 | Website: www.bonterraresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

- 4 -

Cautionary and Forward-Looking Statements

This press release contains "forward-looking information" that is based on Bonterra’s current expectations, estimates,

forecasts and projections. This forward-looking information includes, among other things, statements with respect to

Bonterra’s exploration and development plans. The words "will", "anticipated", "plans" or other simila r words and

phrases are intended to identify forward -looking information. This forward -looking information includes namely,

information with respect to the planned exploration programs and the potential growth in mineral resources.

Exploration results that i nclude drill results on wide spacings may not be indicative of the occurrence of a mineral

deposit and such results do not provide assurance that further work will establish sufficient grade, continuity,

metallurgical characteristics and economic potential to be classed as a category of mineral resource. The potential

quantities and grades of drilling targets are conceptual in nature and, there has been insufficient exploration to define

a mineral resource, and it is uncertain if further exploration will re sult in the targets being delineated as mineral

resources. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that

may cause Bonterra’s actual results, level of activity, performance or achievements to be ma terially different from

those expressed or implied by such forward -looking information. Such factors include but are not limited to:

uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and

development; changes in economic conditions or financial markets, environmental and other judicial, regulatory,

political and competitive developments; technological or operational difficulties or inability to obtain permits

encountered in connection with exploration activities; and labour relations matters. This list is not exhaustive of the

factors that may affect our forward-looking information. These and other factors should be considered carefully and

readers should not place undue reliance on such forward-looking information.