Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTR.V ·

Bonterra Resumes its 2020 Exploration Program

Exploration Programs

2872 Sullivan Rd Suite 2 

Val‐d’Or, Quebec

Office: (819) 825‐8678 

Bonterra Resumes its 2020 Exploration Program

Val-d’Or, QC – July 14, 2020: Bonterra Resources Inc. (TSX-V: BTR, OTCQX: BONXF, FSE:

9BR2) (the “ Company” or “ Bonterra”) is pleased to announce that the Company has resumed its

2020 drill program this week at the Moroy, Gladiator and Barry projects that were previously

suspended on March 17, 2020 due to the Covid-19 global pandemic. The current program consists of

eight drill rigs including five land drill rigs, two barge dril l rigs at Barry and Gladiator and one

underground drill rig at Moroy.

An additional 56,000 meters (“ m”) of drilling is planned for the remainder of 2020, which incl udes

20,000 m of surface and underground drilling at Moroy, 16,000 m at Gladiator and 20,000 m at Barry.

Drilling activities and related exploration work will resume pr ogressively while implementing the

Company’s government approved Covid-19 health and safety protocols to protect its workers and the

surrounding communities near the projects.

Exploration Objectives

The Company’s objective for the H2 2020 drill program is a balanced approach, which includes deposit

in-fill drilling, resource expansion drilling and exploration a long known deposit and regional trends.

The targeted project areas are as follows (see figures 1, 2 and 3):

 Moroy deposit resource expansion

 Bachelor-Moroy regional exploration

 In-fill drilling and resource expansion at Gladiator

 Duke Option property earlier stage exploration and evaluation of the Lac Rouleau target

 In-fill drilling and resource expansion at Barry

 Barry regional exploration (Barry-Bart-Moss trend) and evaluation

 Greenfield early stage targets along cross-regional corridors of structural decompression

The Bachelor assay lab is operational with Covid-19 confinement and health and safety protocols in

place on site. The winter 2020 drilling sampling and assaying backlog is expected to be completed by

the end of July. The Company continues to develop and update all geological models at the Gladiator,

Barry, and Moroy deposits. The extent and timing of future mode l updates will be dependent on the

amount of winter drilling accomplished.

Bonterra recently staked 231 claims near the Bachelor-Moroy sec tor. This newly added greenfield

land package is located north and west of the Bachelor mine. These new areas are underexplored and

lie along an east-northeast regional fault trend within a folde d complex with several historic gold

occurrences to the northeast. A high-resolution airborne magnetic survey is scheduled for this summer

to be followed by mapping and prospecting (see figure 4).

The Company continues the work on permitting and engineering fo r expansion of the Bachelor mill

and tailings facility. Geotechnical drilling is scheduled in J uly to test the soil type under the location

of a future dyke. These results will be incorporated into the detailed tailings expansion design. In

addition, the Company continues to advance the permitting to de velop an exploration decline at the

Gladiator project.

Pascal Hamelin, Interim CEO and VP, Operations commented: “We a re very excited to resume our

exploration activities in the Urban-Barry and the Bachelor camps as we have excellent targets to follow

up on. I wish to thank our employees and suppliers for their c ontinuous support and effort in

maintaining all our assets in excellent shape for a safe resumption.”

- 2 -

Figure 1 – H2 2020 Priority Targets

Figure 2 - Urban-Barry Cross-Regional Corridors of Structural Decompression

- 3 -

Figure 3 – Bachelor Property Regional Targets

Figure 4 – Recently staked claims west and north of the Bachelor camp.

Qualified Persons

Marc Ducharme, P.Geo. and Bonterra’s Principal Geologist has ap proved the technical information

contained in this release. Mr. Ducharme is a Qualified Person a s defined by National Instrument 43-

101 – Standards of Disclosure for Mineral Projects.

- 4 -

FOR ADDITIONAL INFORMATION:

Contact: Pascal Hamelin - Interim CEO and VP, Operations or [email protected]

2872 Sullivan Road, Suite 2, Val d’Or, Quebec J9P 0B9

819-825-8676 | Website: www.bonterraresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary and Forward-Looking Statements

This press release contains "forward-looking information" that is based on Bonterra’s current expectations, estimates,

forecasts and projections. This forward-looking information includes, among other things, statements with respect to

Bonterra’s exploration and development plans. The words "will", "anticipated", "plans" or other similar words and

phrases are intended to identify forward-looking information. T his forward-looking information includes namely,

information with respect to the planned exploration programs an d the potential growth in mineral resources.

Exploration results that include drill results on wide spacings may not be indicative of the occurrence of a mineral

deposit and such results do not provide assurance that further work will establish sufficient grade, continuity,

metallurgical characteristics and economic potential to be clas sed as a category of mineral resource. The potential

quantities and grades of drilling targets are conceptual in nature and, there has been insufficient exploration to define

a mineral resource, and it is uncertain if further exploration will result in the targets being delineated as mineral

resources. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that

may cause Bonterra’s actual results, level of activity, perform ance or achievements to be materially different from

those expressed or implied by such forward-looking information. Such factors include but are not limited to:

uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and

development; changes in economic conditions or financial market s, environmental and other judicial, regulatory,

political and competitive developments; technological or operat ional difficulties or inability to obtain permits

encountered in connection with exploration activities; and labo ur relations matters. This list is not exhaustive of the

factors that may affect our forward-looking information. These and other factors should be considered carefully and

readers should not place undue reliance on such forward-looking information.