Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTR.V ·

Bonterra Makes New Gold Discovery at Barry North

Exploration Programs

2872 Sullivan Road, Suite 2 

Val‐d’Or, Quebec

Office: (819) 825‐8678 

Bonterra Makes New Gold Discovery at Barry North

Val-d’Or, QC – December 21, 2020 – Bonterra Resources Inc. (TSX-V: BTR, OTCQX:

BONXF, FSE: 9BR2) ( “Bonterra” o r t h e “Company”) is pleased to announce a new gold

discovery at Barry North. Recent exploration drilling has conf irmed the existence of gold

mineralized vein structures spanning approximately 750 metres (“ m”) in length along strike,

approximately 150 m north of the Barry gold deposit. The Barry North zone is proximal and

subparallel to the Mazères regional fault . These vein structures remai n open along strike and at

depth. Barry North’s gold mineralization is associated with quartz veining with some pyrite hosted

within sheared mafic volcanic rocks and proximal to felsic intrusive rocks.

The best results obtained from the newly discovered Barry North zone include several intersections

which are as follows: 3.8 g/t Au over 0.7 m in hole MB-20-290, 2.6 g/t Au over 3.9 m in hole

MB-20-295 and 3.3 g/t Au over 2.0 m in hole MB-20-302. These holes are located just north and

adjacent to the Barry deposit (See Table 1 and Figure 1).

Pascal Hamelin, President and CEO commented: “This newly discovered zone near surface is very

promising and confirms the existence of previously untested gol d mineralization just north of the

Barry deposit. We look forward to receiving more drill results from this zone.”

The Company has drilled 42 holes representing a total of 15,225 m at Barry since July 23, 2020.

Results from 11 holes have been received since the press releas e dated October 21, 2020

(See Table 1 and Figures 1 and 2).

Table 1 - Significant mineralized intersections of recent drilling

Hole ID From (m) To (m) Length

(m)

Grade

(g/t Au) Zone Purpose

MB-20-289 A bandoned, re-drilled with hole MB-20-290 Exploration

MB-20-290 112.9 113.6 0.7 3.8 Barry North Exploration

114.6 120.2 5.6 0.8 Barry North Exploration

312.5 313.5 1.0 0.9 Barry North Exploration

MB-20-291 No significant values Exploration

MB-20-292 No significant values Exploration

MB-20-293 213.7 215.4 1.7 0.7 Barry North Exploration

MB-20-294 64.2 65.2 1.0 1.6 H1 Sector Infill Drilling

74.5 78.4 3.9 1.2 H1 Sector Infill Drilling

316.0 327.0 11.0 1.8 800 Infill Drilling

including 317.0 319.0 2.0 8.3

MB-20-295 6.5 10.4 3.9 2.6 Barry North Exploration

MB-20-296 62.1 63.6 1.5 5.6 H1 Sector Infill Drilling

Including 62.1 62.6 0.5 12.2

MB-20-297 Results pendin g Exploration

MB-20-298 47.5 48.6 1.1 1.5 H1 Sector Infill Drilling

- 2 -

Hole ID From (m) To (m) Length

(m)

Grade

(g/t Au) Zone Purpose

56.3 58.6 2.3 7.4 H1 Sector Infill Drilling

Including 56.3 57.1 0.8 20.4

97.8 98.3 0.5 5.7 H1 Infill Drilling

262.9 263.9 1.0 1.2 800 Infill Drilling

MB-20-299 Results pendin g Exploration

MB-20-300 Results pendin g Exploration

MB-20-301 101.2 105.9 4.7 0.8 H1 Infill Drilling

174.4 175.0 0.6 1.5 800 Infill Drilling

MB-20-302 73.4 75.4 2.0 3.3 Barry North Exploration

80.9 81.5 0.6 0.7 Barry North Exploration

82.5 84.5 2.0 2.4 Barry North Exploration

Notes:

1) The meterage represents the length of the drilled lengths.

2) True widths are estimated to be greater than 85% of the dril led intersection length.

3) The mineralized intervals s hown above use a 0.5 g/t Au cut-off grade.

In addition, infill drilling cont inues to confirm the western m ineral continuity of the H1 and 800

zones at Barry. The best results include 7.4 g/t Au over 2.3 m, incl uding 20.4 g/t Au over 0.8 m

and 5.7 g/t Au over 0.5 m in hole MB-20-298 and 5.6 g/t Au over 1.5 m in hole MB-20-296 for

the H1 Sector and H1 zones, respectively. The 800 zone was intersected with 1.8 g/t Au over 11.0

m including 8.3 g/t Au over 2.0 m in hole MB-20-294 (See Table 1 and Figures 1 and 2).

Figure 1 – Barry Project - Drill Hole Location Map

- 3 -

Figure 2 – Barry Deposit Longitudinal Section

Quality control and reporting protocols

The Barry project’s drill core gold analyses are performed at t he Bachelor Mine’s analytical

laboratory (the “Laboratory”). The Company employs a rigorous QA-QC analysis program that

meets industry standards. The a nalyses are carried out by the fire assay (A.A.) with atomic

absorption finish. Blanks, duplicates, and certified reference standards are inserted into the sample

stream to monitor the Laboratory’s performance. The Company's QA-QC program requires that

at least 10% of samples be analyzed by an independent laboratory. These verification samples are

sent to ALS Minerals laboratory facility located in Val-d'Or, Q uebec. The verifications show a

high degree of correlation with the Laboratory’s results.

Qualified person

Marc Ducharme, P.Geo. and Bonterra’s Exploration Manager, has compiled and approved the

information contained in this press release. Mr. Ducharme is a qualified person as defined by

National Instrument 43-101.

FOR ADDITIONAL INFORMATION:

Pascal Hamelin, President & CEO

[email protected]

2872 Sullivan Road, Suite 2, Val d’Or, Quebec J9P 0B9

819-825-8678 | Website: www.btrgold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary and Forward-Looking Statements

This press release contains “forward-looking information” that is based on Bonterra’s current expectations, estimates,

forecasts and projections. This forward-looking information includes, among other things, statements with respect to

Bonterra’s exploration and develo pment plans. The words “will”, “anticipated”, “plans” or other similar words and

phrases are intended to identify forward-looking information. T his forward-looking information includes namely,

- 4 -

information with respect to the planned exploration programs an d the potential growth in mineral resources.

Exploration results that include drill results on wide spacings may not be indicative of the occurrence of a mineral

deposit and such results do not provide assurance that further work will establish sufficient grade, continuity,

metallurgical characteristics and economic potential to be clas sed as a category of mineral resource. The potential

quantities and grades of drilling targets are conceptual in nature and, there has been insufficient exploration to define

a mineral resource, and it is uncertain if further exploration will result in the targets being delineated as mineral

resources. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that

may cause Bonterra’s actual results, level of activity, perform ance or achievements to be materially different from

those expressed or implied by such forward-looking information. Such factors include but are not limited to:

uncertainties related exploration and development; the ability to raise sufficient capital to fund exploration and

development; changes in economic conditions or financial market s, environmental and other judicial, regulatory,

political and competitive developments; technological or operat ional difficulties or inability to obtain permits

encountered in connection with exploration activities; and labo ur relations matters. This list is not exhaustive of the

factors that may affect our forward-looking information. These and other factors should be considered carefully and

readers should not place undue reliance on such forward-looking information.