Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTR.V ·

d’Or, Quebec Office:

Corporate Updates

2872

Sullivan

Road, Suite

2

Val

-

d’Or, Quebec

Office:

(819) 825

-

8678

Bonterra Intersects

6.

2

g/t Au over

7

.

7

m

,

I

ncluding

12.8

g/t

Au

over

2.8

m

at

the Bar

r

y Underground Project

and Provides Exploration Updates

Val

-

d’Or,

QC

–

Ma

y

1

, 202

3

–

Bonterra

Resources Inc.

(TSX

-

V: BTR, OTCQX: BONXF,

FSE:

9BR2)

(“

Bonterra

” or the “

Company

”)

is pleased to announce

more

results from the

now

completed

infill

and expansion drilling

campaign at the Barry

underground

project

,

which holds

0.5 million ounces of Measured and

Indicated Mineral resources and 0.7 million ounces of Inferred

Mineral resources according to the last mineral resources estimate (the “

2021 MRE

”, see press

release dated June 23, 2021)

.

The primary goal of this

campaign was to convert mineral resources

to

a higher confidence category and enhance the interpretation and grade continuity of the

mineralization

, primarily

in the upper section of the deposit.

In total,

31

,

349

metres (“

m

”)

(

91

holes) of infill drilling

has been completed from surface

since

August

2022

. T

he Company

has

received assays for

80

holes so far, including

the

holes d

i

sclosed

in this release (

see press release

s

dated

November

15

,

2022

,

December 12, 2022

, and

Ma

rch 27, 2023

,

for previously released

holes

)

.

Highlights include:

6.2

g/t Au over 7.7 m, including 12.8 g/t Au over 2.8 m and 13.0 g/t Au over 0.5 m in

hole MB

-

2

3

-

598

26.3 g/t Au over 1.2 m, including 38.1 g/t Au over 0.7 m in hole MB

-

23

-

600

4.5 g/t Au over 4.2 m, including 20.3 g/t Au over 0.5 m in hole MB

-

23

-

592

1

.

6

g/t Au

over

6.0

m, including 2.

2

g/t Au over 2.

0

m in hole MB

-

2

3

-

613

Marc André Pelletier, President and CEO commented: “The results

reported today are encouraging

for many reasons. Holes MB

-

2

3

-

598, MB

-

23

-

600 and MB

-

23

-

592 intercepted

mineralisation

consistent

with the

high

-

grade ore shoots in the

800 Zone

. Meanwhile, h

ole MB

-

23

-

613 confirmed

the extension of mineralization

from

the 800 Zone

approximately

150

m further

than

the known

mineral

ized

envelope and suggests th

at there is

continuity of the mineralization at depth. With the

conclusion of

the

winter drill program at Duke, we

have

started a greenfield exploration program

at Barry North

-

E

ast and a more focused program at Panache South. Bonterra remains committed

to continuing to explore the Urban

-

Barry camp where several million ounces

of gold

have already

been discovered

to date

.”

Exploration

U

pdate

s

The d

rill program at the Duke proper

ty

(“

Duke

”)

, a

joint venture with Osisko Mining Inc.

(“

Osisko

”)

, consist

ing

of 10 holes

covering 3,387 m

has been completed on schedule

(see press

release

s

dated March 6

, 2023

,

and

March

27, 2023)

.

Also,

a

short drill

program

of

two

holes

totaling

706

m was completed

just

before the spring thaw

at the

Nelligan property

near the

B

achelor Mill Complex

.

Following the completion of the Duke

and Nelligan

program

s

, the Company has allocated one drill

rig to its Barry North

-

E

ast

regional

e

xploration program, which consists of 11 drill holes covering

3,200 m. This program targets polarization anomalies along the Mazere

s

fault corridor, located 3

-

2

-

kilometers (“

km

”)

to

the

n

ortheast of the Barry deposit

(See Figure 3)

. So far, three drill holes

covering 969 m have been completed.

T

he

C

ompany will also commence a 3,500

m

exploration and follow

-

up drill program

at

the

Panache South

target

. The area includes the historical Panache South showing with 12.9 g/t Au

over 0.5

m and 3.2 g/t Au over 0.4

m.

In 2021, the

C

ompany drilled 4,383 m

at the

Panache South

target

and intersected significant gold mineralization, including 5.5 g/t Au over 1.5 m

,

including

16.2 g/t Au over 0.5 m, 23.1 g/t Au over 2.3 m

,

including 62.3 g/t Au over 0.8 m, and 30.6 g/t

Au

over 1.5 m

,

including 91.4 g/t Au over 0.5 m from shear

-

hosted quartz carbonate vein systems

(

Panache South drill hole references in this paragraph

are

from

the Company’s

press release dated

March 1, 2022

)

.

Diamond Drill

ing

Results Highlights:

Figure

1

–

Barry Project

–

Surface lan,

h

oles

,

and

location of h

ighlight

s

The infill drill program

at

the Barry underground

project

was designed to convert the Inferred

resources from the 2021 MRE into Indicated resources by decreasing the drill spacing to 25 m and

to expand the mineralization in the sub

-

vertical 800

Z

one at depth. The results presented in this

release demonstrate the

predictability of the 800 Zone geology model and highlight that the

mineralization remains open at depth, following the well

-

defined high

-

grade ore shoots.

-

3

-

Figure 2

–

Barry Project

–

Long Section,

800

Zone Looking

n

orthwest

The infill drill results from the 800

Z

one continue to demonstrate a high potential for high

-

grade

mineralization, as evidenced by intersections

of

6.2 g/t Au over 7.7 m, including 12.8 g/t Au over

2.8 m and 13.0 g/t Au over 0.5 meters in hole MB

-

23

-

598, 2

6.3 g/t Au over 1.2 meters, including

38.1 g/t Au over 0.7

m

in hole MB

-

23

-

600, and 4.5 g/t Au over 4.2 m, including 20.3 g/t Au over

0.5 m in hole MB

-

23

-

592.

Furthermore, preliminary results from three holes drilled 150 meters down plunge of the 800

Z

one

have returned 1.6 g/t Au over 6.0 m, including 2.2 g/t Au over 2.0 m in hole MB

-

23

-

613,

confirming the mineralization remains open at depth and

allow to target

new high

-

grade shoots

down dip of the orebody to the

e

ast.

-

4

-

Figure

3

–

Urban

-

Barry Project

–

Regional

e

xploration

t

argets

The Barry North

-

E

ast and the Panache South properties are located on the

w

est portion of the

Urban

-

B

arry camp

,

in the Macho mafic volcanic formation,

where the

Barry deposit and

M

oss

showings

occur

along the Maz

er

e

s

fault system striking N60 toward the

Osisko’s W

indfall deposit.

The Panache showing located in the

n

ortheast portion of the area

occurs

along the Milner fault

which also

hosts

the Fox and Fox West

Zones

o

w

ned by

Osisko.

Barry

d

eposit

g

eology

The Barry gold deposit is characterized by three dominant sets of structures, all dipping to the

southeast. The sub

-

vertical shear zones and the H

-

Series shear zones dipping 25 to 40 degrees are

hosted within intermediate to

mafic volcanics and tuffs with local felsic intrusions. Contact zones

dip

from

50

to

65 degrees along the lower and upper contacts of the D1, D2 and D3 felsic intrusions

with mafic volcanics. Gold mineralization is associated with disseminated sul

ph

ides w

ithin shear

zones and veins with local visible gold. The Barry deposit has been delineated over 1.4 k

m

along

strike and 700 m

below surface

and remains open for expansion.

-

5

-

Table of d

iamond

d

rill

h

ole

r

esults:

The following table shows the

significant intersections of the drill holes presented in this press

release.

Program

Hole ID

From

(m)

To (m)

Meters

(m)

Grades (

g/t Au)

Metal Factor

(Length X Grade)

Zones

Underground Infill

MB

-

23

-

592

181.6

185.8

4.2

4.5

19.1

800

Underground Infill

MB

-

23

-

592

Including

184.1

184.6

0.5

20.3

10.2

800

Underground Infill

MB

-

23

-

596

133.0

141.9

8.9

1.0

8.7

800

Underground Infill

MB

-

23

-

596

Including

136.8

139.7

2.9

1.7

4.9

800

Underground Infill

MB

-

23

-

598

179.5

187.2

7.7

6.2

47.9

800

Underground Infill

MB

-

23

-

598

Including

180.2

183.0

2.8

12.8

35.8

800

Underground Infill

MB

-

23

-

598

And Including

185.7

186.2

0.5

13.0

6.5

800

Underground Infill

MB

-

23

-

600

222.9

229.8

6.9

0.8

5.7

D1 Intrusiv

e

Underground Infill

MB

-

23

-

600

250.0

251.2

1.2

26.3

31.6

800

Underground Infill

MB

-

23

-

600

Including

250.5

251.2

0.7

38.1

26.7

800

Underground Infill

MB

-

23

-

613

344.0

350.0

6.0

1.6

9.7

800

Underground Infill

MB

-

23

-

613

Including

348.0

350.0

2.0

2.2

4.4

800

Notes:

1)

The meterage represents the

actual

length of the drilled lengths.

2)

Estimated true widths for the Barry interpreted zones are as follows: D series, AB series, H series 70% to 90% of core lengt

h,

800 series 50% to 70% of core length

.

3)

The

mineralized intervals listed are above 0.5 g/t Au and with metal factor (grades x thickness) above 5.

4) Gold grades are uncut.

Quality Control and Reporting Protocols

The Barry project’s drill core gold analyses are performed at Bachelor Mine

Lab

ora

t

ory

, Actlabs

(Ste

-

Germaine

-

Boulé)

and at AGAT Laboratories

located in

Val d’Or

, Quebec

. The Company

’s

laboratory

and

external

laboratories

employ a rigorous QA

-

QC analysis program that meets

industry standards. The analyses are carried out by fire

assay (A.A.) with atomic absorption finish

at Bachelor Mine Laboratory and with gravimetric finish for assay above 10 g/t Au at

Actlabs

and

AGAT

laboratories. Blanks, duplicates, and certified reference standards are inserted into the

sample stream to mon

itor the Laboratory’s performance. The Company's QA

-

QC program

requires that at least

5

% of samples be analyzed by an independent laboratory. These verification

samples are sent to ALS Minerals laboratory facility located in Val

-

d'Or, Quebec. The

verifi

cations show a high degree of correlation with the Laboratory’s results.

Qualified

P

erson

Boris Artinian

, P.

Geo., (

OGQ #

1546

)

Chief Geologist

of the Company oversees

the

exploration

activities on the

Urban

-

Barry

property and has compiled and approved t

he information contained

in this press release. Mr.

Artinian

is a qualified person as defined by National Instrument 43

-

101

on standards of disclosure for mineral projects

.

-

6

-

About Bonterra Resources Inc.

Bonterra

is a Canadian gold exploration company with a large portfolio of advanced exploration

assets anchored by a central milling facility in Quebec, Canada. The Company has four main

assets, Gladiator, Barry, Moroy, and Bachelor that collectively have a total o

f 1.24 million ounces

in Measured and Indicated categories, and 1.78 million ounces in Inferred category. Importantly,

the Company owns the only permitted and operational gold mill in the region. Bonterra is focused

on graduating from advanced exploratio

n to a development company to deliver shareholder value.

FOR ADDITIONAL INFORMATION

Marc

-

Andr

é

Pelletier

, President & CEO

[email protected]

2872 Sullivan Road, Suite 2, Val d’Or, Quebec J9P 0B9

819

-

279

-

9304

| Website:

www.btrgold.com

Neither TSX Venture Exchange nor its Re

gulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution regarding forward

-

looking statements

This press release contains “forward

-

lookin

g information” that is based on Bonterra’s current expectations, estimates,

forecasts,

and projections. This forward

-

looking information includes, among other things, statements with respect to

Bonterra’s exploration and development plans

and placing the

Bachelor

-

Moroy deposit under

long

-

term

care and

maintenance

. The words “will”, “anticip

ated”,

“plans” or other similar words and phrases are intended to identify

forward

-

looking information. This forward

-

looking information

includes namely

information with respect to the

planned exploration programs and the potential growth in mineral resour

ces. Exploration results that include drill

results on wide spacings may not be indicative of the occurrence of a mineral deposit and such results do not provide

assurance that further work will establish sufficient grade, continuity, metallurgical

charact

eristics,

and economic

potential to be classed as a category of mineral resource. The potential quantities and grades of drilling targets are

conceptual in nature and, there has been insufficient exploration to define a mineral resource, and it is uncertai

n if

further exploration will result in the targets being delineated as mineral resources. Forward

-

looking information is

subject to known and unknown risks, uncertainties and other factors that may cause Bonterra’s actual results, level of

activity,

perfo

rmance,

or achievements to be materially different from those expressed or implied by such forward

-

looking information. Such factors include but are not limited to: uncertainties related exploration and development;

the ability to raise sufficient capital

to fund exploration and development; changes in economic conditions or financial

markets, environmental and other judicial, regulatory,

political,

and competitive developments; technological or

operational difficulties or inability to obtain permits encoun

tered in connection with exploration activities; and labour

relations matters. This list is not exhaustive of the factors that may affect our forward

-

looking information. These and

other factors should be considered

carefully,

and readers should not place

undue reliance on such forward

-

looking

information.