Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BTR.V ·

BonTerra Resources to Showcase the Gladiator Gold Project at the AMEBC Roundup 2017 and at the Vancouver Resource Investment Conference

Marketing Announcement

510-744 West Hastings Street, Vancouver, BC V6C 1A1, Canada

Phone: +1 (604) 678-5308 | Toll-Free: +1 (855) 678-5308

www.bonterraresources.com

BonTerra Resources to Showcase the Gladiator Gold Project at the AMEBC

Roundup 2017 and at the Vancouver Resource Investment Conference

Vancouver, BC – January 20, 2017 : BonTerra Resources Inc. (TSX-V: BTR, US: BONXF,

FSE: 9BR1) (the “ Company ” or “ BonTerra ”) is pleased to announce that the Association for

Mineral Exploration British Columbia (“AMEBC”) has invited the Company to showcase its

2016 drill core from its 100% owned Gladiator Gold Project located north of Val d’Or, Québec.

Nav Dhaliwal, President and CEO of BonTerra, stated : “ For the second year in a row,

Bonterra has been hand selected to present our 100% owned Gladiator Gold Project at the

upcoming and respected 2017 AMEBC Roundup Core Shac k. In 2016, we completed multiple

exploration and drill programs, increased the Gladi ator property position by 170%, and

successfully expanded the strike length and depth o f the deposit to 1,200 m and 650 m,

respectively from 200m by 200m. The project also yi elded significant gold intersections

including 5.5m of 70 g/t, 2.0m of 64.3 g/t, 2.5m of 137.4 g/t , 3.0m of 20.7 g/t, 10.0m of 9.3 g/t,

3.3m of 29.0 g/t, 5.7m of 24.3 g/t, 5.0m of 9.0 g/t, 7.7m of 7.2 g/t, and 6.6m of 14.0 g/t .”

AMEBC Mineral Exploration Roundup 2017 (“Roundup”):

The Roundup is located at the Vancouver Convention Centre East - under the sails of Canada

Place from January 23 - 26, 2017. Please visit www. amebc.ca/roundup for information regarding

the world-class event, where BonTerra will have core on display from our Gladiator Gold Project

on Monday Jan. 23 rd and Tuesday Jan. 24th, from 9 am to 4 pm in the Core Shack.

Vancouver Resource Investment Conference (“VRIC”):

The VRIC is located at the Vancouver Convention Cen tre West from January 22 - 23, 2017.

Please visit www.camrbidgehouse.com for information regarding this first class investment

conference and visit us in Booth #408, where BonTer ra will have its management team available

to chat to all shareholders, media and members of the investment community.

BonTerra Resources Quick Facts:

• 7,563-hectare (Gladiator Project) in the Urban-Barry Camp in Québec containing:

o Using a 4 g/t Au cut-off grade, the project current ly contains an inferred resource of

905,000 tonnes, grading 9.37 g/t Au for 273,000 oun ces of gold . Of note, ~90% of

510-744 West Hastings Street, Vancouver, BC V6C 1A1, Canada

Phone: +1 (604) 678-5308 | Toll-Free: +1 (855) 678-5308

www.bonterraresources.com

the worlds operating mines have an average gold gra de less than 8 g/t. Mineral

Resource Estimate and technical report filed July 2 7, 2012, Snowden Mining

Consultants.

o 2016/17 Exploration Program underway – up to 25,000 meters utilizing minimum of

two drill rigs at its 100% owned Gladiator Gold Pro ject to expand current gold

resource.

• 2,165-hectare (Larder Property) in the Cadillac-Lar der Break camp in Ontario ( refer to

March 17, 2016 news release highlighting historical gold resource ).

ON BEHALF OF THE BOARD OF DIRECTORS,

Nav Dhaliwal, President & CEO

BonTerra Resources Inc.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.